Berkshire Wind Power Project
108 Brodie Mountain Rd, Lanesboro, MA 1224Plant Summary Information
Berkshire Wind Power Project is ranked #36 out of 609 power plants in Massachusetts in terms of total annual net electricity generation.
Berkshire Wind Power Project generated 12.3 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Berkshire Wind Power Project |
---|---|
Utility Name | Massachusetts Mun Wholes Electric Co |
Location | Berkshire County, MA |
Initial Operation Date | May 2011 |
Last Update | May 2025 |
Annual Generation | 33.8 GWh |
Annual Consumption | 121.4 k MMBtu |
Ranked #4,526 out of 12,312 Power Plants Nationwide | |
Ranked #1,034 out of 1,355 Wind Power Plants Nationwide | |
Ranked #36 out of 609 Massachusetts Power Plants | |
Ranked #2 out of 17 Massachusetts Wind Power Plants | |
Fuel Types | Wind |
Map of Berkshire Wind Power Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Berkshire Wind Power Project.
Monthly Net Generation for Berkshire Wind Power Project
Berkshire Wind Power Project Details
Summary Information | |
---|---|
Plant Name | Berkshire Wind Power Project (57721) |
Plant Address | 108 Brodie Mountain Rd, Lanesboro, MA 1224 |
Utility | Massachusetts Mun Wholes Electric Co (11806) |
Latitude, Longitude | 42.58667, -73.275 |
Generation Dates on File | May 2011 to May 2025 |
Initial Operation Date | May 2011 |
Annual Generation | 33.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Western Massachusetts Electric Company (20455) MA |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator BWP Details Operating May 2011
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | UN.PARTRIDG23 BRKW |
RTO ISO Location Designation For Reporting Wholesale Sales Data | .Z.WCMASS |
Nameplate Capacity | 15 MW |
Summer Capacity | 15 MW |
Winter Capacity | 15 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 10 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 10 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SLE |
Design Wind Speed | 16 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262 |
Generator HN-8 Details Operating September 2019
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 7604 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | .Z.WCMASS |
Nameplate Capacity | 2.3 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 2.3 MW |
Winter Capacity | 2.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 1 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.3-116 |
Design Wind Speed | 16 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.5 |
Generator HN-9 Details Operating September 2019
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 7604 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | .Z.WCMASS |
Nameplate Capacity | 2.3 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 2.3 MW |
Winter Capacity | 2.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 1 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.3-116 |
Design Wind Speed | 16 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.5 |
Berkshire Wind Power Project Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Berkshire Wind Power Cooperative Corp | 125 High Street, Boston, MA 2110 | Generator BWP | 100.00% |
Berkshire Wind Power Cooperative Corp | 125 High Street, Boston, MA 2110 | Generator HN-8 | 100.00% |
Berkshire Wind Power Cooperative Corp | 125 High Street, Boston, MA 2110 | Generator HN-9 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1024 | AM Wind Repower LLC | Whitewater, CA | 36.1 GWh |
#1025 | Iowa Lakes Superior Wind Farm | Superior, IA | 36.0 GWh |
#1026 | RoxWind | Roxbury, ME | 35.8 GWh |
#1027 | Two Dot Wind Farm | Two Dot, MT | 34.8 GWh |
#1028 | Golden Valley Wind Park LLC | Burley, ID | 34.8 GWh |
#1029 | Lakota Wind Wind Farm | Lakota, IA | 34.7 GWh |
#1030 | Pilgrim Stage Wind Park | Hagerman, ID | 34.3 GWh |
#1031 | Odin Wind Farm LLC | Mountainlake, MN | 34.2 GWh |
#1032 | Mountain Home | Mountain Home, ID | 34.1 GWh |
#1033 | Thousand Springs Wind Park | Hagerman, ID | 34.1 GWh |
#1035 | Windom Wind Project | Bingham Lake, MN | 33.4 GWh |
#1036 | Victory Garden (Tehachapi) | Tehachapi, CA | 33.0 GWh |
#1037 | Hardin Hilltop Wind LLC | Jefferson, IA | 32.4 GWh |
#1038 | CED Manchester Wind | Manchester, IA | 31.0 GWh |
#1039 | Perennial Windfarm | Fairmont, NE | 29.9 GWh |
#1040 | PaTu Wind Farm LLC | Wasco, OR | 29.9 GWh |
#1041 | Orchard Windfarm 1, LLC | Lexington, OR | 29.9 GWh |
#1042 | Orchard Windfarm 2, LLC | Lexington, OR | 29.8 GWh |
#1043 | Orchard Windfarm 4, LLC | Lexington, OR | 29.7 GWh |
#1044 | Georgia Mountain Community Wind Farm | Milton, VT | 29.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Berkshire Wind Power Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
401 South | Dalton, MA | 403.0 MWh | 9.7 mi |
Deerfield 5 | Florida, MA | 42.1 GWh | 17.7 mi |
Downing Parkway Solar | Pittsfield, MA | 3.4 GWh | 9.7 mi |
East Acres Solar NG, LLC | Pittsfield, MA | 4.9 GWh | 7.1 mi |
Fife Brook | Florida, MA | 29.5 GWh | 16.6 mi |
Harbor Road Solar 1 | Cheshire, MA | 2.9 GWh | 7.4 mi |
Hinsdale Solar PV | Hinsdale, MA | 3.1 GWh | 13.2 mi |
New England Wind LLC | Florida, MA | 75.6 GWh | 16.2 mi |
Nexamp Peak CSG | Hancock, MA | 2.3 GWh | 1.8 mi |
North Adams Landfill | North Adams, MA | 3.5 GWh | 10.9 mi |
Pittsfield 44 - M&W PV | Pittsfield, MA | 1.7 GWh | 7.5 mi |
Pittsfield Generating LP | Pittsfield, MA | 31.3 GWh | 9.5 mi |
Savoy Solar PV | Savoy, MA | 3.2 GWh | 11.6 mi |
Silver Lake Solar Photovoltaic Facility | Pittsfield, MA | 805.0 MWh | 9.4 mi |
SVEP Solar Project Company | Pownal, VT | 1.9 GWh | 11.8 mi |
Syncarpha Hancock I CSG | Hancock, MA | 3.1 GWh | 11.1 mi |
Syncarpha Hancock II CSG | Hancock, MA | 3.2 GWh | 11.6 mi |
Syncarpha Hancock III CSG | Pittsfield, MA | 1.6 GWh | 11.3 mi |
Truck Stop | West Stockridge, MA | 2.8 GWh | 18.1 mi |
Williams College - Campus CHP | Williamstown, MA | 1.3 GWh | 9.3 mi |