Agua Caliente Solar Project
67500 East Palomas Rd, Dateland, AZ 85333Plant Summary Information
Agua Caliente Solar Project is ranked #31 out of 168 power plants in Arizona in terms of total annual net electricity generation.
Agua Caliente Solar Project generated 192.6 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Agua Caliente Solar Project |
|---|---|
| Utility Name | Agua Caliente Solar |
| Location | Yuma County, AZ |
| Initial Operation Date | May 2012 |
| Last Update | Sep 2025 |
| Annual Generation | 548.2 GWh |
| Annual Consumption | 2.1 M MMBtu |
| Ranked #1,245 out of 12,539 Power Plants Nationwide | |
| Ranked #83 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #31 out of 168 Arizona Power Plants | |
| Ranked #4 out of 115 Arizona Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
First Solar Energy LLC (2013 to 2013) Agua Caliente Solar (2014 to 2024) |
Map of Agua Caliente Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Agua Caliente Solar Project.
Monthly Net Generation for Agua Caliente Solar Project
Agua Caliente Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Agua Caliente Solar Project (57373) |
| Plant Address | 67500 East Palomas Rd, Dateland, AZ 85333 |
| Utility | Agua Caliente Solar (59396) |
| Latitude, Longitude | 32.9774, -113.4945 |
| Generation Dates on File | Apr 2012 to Sep 2025 |
| Initial Operation Date | May 2012 |
| Annual Generation | 548.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
| Grid Voltage | 500.00 kV |
| Energy Storage | No |
Generator AGU2 Details Operating December 2012
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 136 MW |
| Summer Capacity | 136 MW |
| Winter Capacity | 136 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 195 |
| Tilt Angle | 15 |
| DC Net Capacity | 141.6 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator AGU1 Details Operating May 2012
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 90.7 MW |
| Summer Capacity | 90.7 MW |
| Winter Capacity | 90.7 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 195 |
| Tilt Angle | 15 |
| DC Net Capacity | 116.3 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator AGU3 Details Operating February 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 121 MW |
| Summer Capacity | 121 MW |
| Winter Capacity | 121 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | February 2014 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 195 |
| Tilt Angle | 15 |
| DC Net Capacity | 140.7 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Agua Caliente Solar Project Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| MidAmerican Solar LLC | 1850 N Central, Phoenix, AZ 85004 | Generator AGU01 | 49.00% |
| Agua Caliente Solar | 67500 Palomas Raod, Dateland, AZ 85333 | Generator AGU01 | 51.00% |
| First Solar Project Development | 135 Main St., 6th Floor, San Francisco, CA 94105 | Generator AGU1 | 100.00% |
| First Solar Project Development | 135 Main St., 6th Floor, San Francisco, CA 94105 | Generator AGU2 | 100.00% |
| First Solar Project Development | 135 Main St., 6th Floor, San Francisco, CA 94105 | Generator AGU3 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #73 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 545.4 GWh |
| #74 | Texas Solar Nova 2 | Spur, TX | 562.0 GWh |
| #75 | Orion III Solar Project | Buckholts, TX | 558.6 GWh |
| #76 | Orion II Solar Project | Rosebud, TX | 556.1 GWh |
| #77 | Desert Sunlight 250, LLC | Desert Center, CA | 555.7 GWh |
| #78 | Stampede Solar Hybrid | Saltillo, TX | 549.1 GWh |
| #79 | Phoebe Solar | Kermit, TX | 554.5 GWh |
| #80 | Dodge Flat | Reno, NV | 547.3 GWh |
| #81 | Golden Field Solar III, LLC | Rosamond, CA | 529.7 GWh |
| #82 | Daggett 2 | Daggett, CA | 527.1 GWh |
| #84 | Sun Streams 4 | Tonopah, AZ | 513.7 GWh |
| #85 | Porter Solar, LLC (TX) | Krum, TX | 541.9 GWh |
| #86 | Noble Solar | Krum, TX | 540.2 GWh |
| #87 | Azure Sky Solar | Haskell, TX | 533.2 GWh |
| #88 | Galloway 1 Solar Farm | Paint Rock, TX | 539.8 GWh |
| #89 | McFarland A Solar and Storage | Dateland, AZ | 527.6 GWh |
| #90 | Fence Post Solar Hybrid Project, LLC | Corsicana, TX | 530.0 GWh |
| #91 | Escalante (NM) | Grants, NM | 526.4 GWh |
| #92 | RE Maplewood | McCamey, TX | 525.2 GWh |
| #93 | Harquahala 2 | Tonopah, AZ | 494.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Agua Caliente Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arlington Valley Energy Facility | Arlington, AZ | 3.4 TWh | 43.1 mi |
| Arlington Valley Solar Energy II | Arlington, AZ | 341.2 GWh | 44.4 mi |
| Gila Bend Hybrid | Gila Bend, AZ | 84.7 GWh | 35.6 mi |
| Harquahala 2 | Tonopah, AZ | 494.8 GWh | 40.1 mi |
| Harquahala Generating Project | Tonopah, AZ | 3.5 TWh | 40.9 mi |
| Harquahala Sun Solar Project | Tonopah, AZ | 228.0 GWh | 38.2 mi |
| Hyder II Hybrid | Hyder, AZ | 32.5 GWh | 9.1 mi |
| Hyder Solar Hybrid | Hyder, AZ | 35.3 GWh | 9.3 mi |
| McFarland A Solar and Storage | Dateland, AZ | 527.6 GWh | 1.8 mi |
| McFarland B Solar and Storage | Dateland, AZ | 478.9 GWh | 1.7 mi |
| Mesquite Generating Station Block 1 | Arlington, AZ | 3.6 TWh | 44.4 mi |
| Mesquite Generating Station Block 2 | Arlington, AZ | 4.1 TWh | 44.4 mi |
| Mesquite Solar 1 | Tonopah, AZ | 401.4 GWh | 42.4 mi |
| Mesquite Solar 2, LLC | Tonopah, AZ | 288.9 GWh | 41.7 mi |
| Mesquite Solar 3, LLC | Tonopah, AZ | 448.5 GWh | 41.2 mi |
| Mesquite Solar 4, LLC | Tonopah, AZ | 147.7 GWh | 41.1 mi |
| Mesquite Solar 5, LLC | Tonopah, AZ | 134.8 GWh | 41.1 mi |
| Saddle Mountain Solar I | Tonopah, AZ | 34.5 GWh | 33.1 mi |
| Solana Generating Station | Gila Bend, AZ | 859.3 GWh | 31.5 mi |
| White Wing Solar | Yuma, AZ | 467.0 GWh | 1.4 mi |