Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Granite Shoals | Lower Colorado River Authority | Marble Falls, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 22.4 GWh | May 1951 | Dec 2024 | Water |
| Inks | Lower Colorado River Authority | Buchanan Dam, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 8.7 GWh | Dec 1937 | Dec 2024 | Water |
| Buchanan Dam (TX) | Lower Colorado River Authority | Buchanan Dam, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 17.1 GWh | Dec 1937 | Dec 2024 | Water |
| Fayette Power Project | Lower Colorado River Authority | La Grange, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 8.3 TWh | May 1979 | Mar 2026 | Subbituminous Coal : 99.8% |
| Sim Gideon | Lower Colorado River Authority | Bastrop, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.0 TWh | Apr 1965 | Dec 2024 | Natural Gas |
| Thomas C Ferguson | Lower Colorado River Authority | Horseshoe Bay, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 3.6 TWh | Jul 2014 | Mar 2026 | Natural Gas |
| Marble Falls | Lower Colorado River Authority | Marble Falls, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 15.2 GWh | Aug 1951 | Dec 2024 | Water |
| Marshall Ford | Lower Colorado River Authority | Austin, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 24.0 GWh | Dec 1940 | Dec 2024 | Water |
| Winchester Power Park | Lower Colorado River Authority | Winchester, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 51.5 GWh | Apr 2010 | Dec 2024 | Natural Gas |
| Low Line Rapids | Lower Lowline LLC | Kimberly, ID | Idaho Power Company (IPCO) | 8.7 GWh | Jul 1990 | Oct 2024 | Water |
| Lower Mount Bethel Energy | Lower Mount Bethel Energy LLC | Bangor, PA | PJM Interconnection, LLC (PJM) | 4.5 TWh | Jan 2004 | Mar 2026 | Natural Gas |
| NY Lower Road II CSG | Lower Road II, LLC | New Hampton, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2023 | Dec 2024 | Solar |
| NY Lower Road III CSG | Lower Road III, LLC | New Hampton, NY | New York Independent System Operator (NYIS) | 3.7 GWh | Nov 2023 | Dec 2024 | Solar |
| Strawberry Creek | Lower Valley Energy Inc | Bedford, WY | Bonneville Power Administration (BPAT) | 9.4 GWh | Jul 1940 | Dec 2024 | Water |
| Swift Creek | Lower Valley Energy Inc | Afton, WY | Bonneville Power Administration (BPAT) | 6.5 GWh | Mar 2009 | Dec 2024 | Water |
| Loyola University Health Plant | Loyola University Health System | Maywood, IL | PJM Interconnection, LLC (PJM) | 14.8 GWh | Aug 2005 | Dec 2024 | Natural Gas |
| LR Wheatfield Solar 1 | LR Wheatfield Solar 1, LLC | Wheatfield, NY | ISO New England (ISNE) | 8.4 GWh | Sep 2020 | Dec 2024 | Solar |
| Sturbridge Barn | LSE Ara LLC | Charlton, MA | ISO New England (ISNE) | 1.7 GWh | May 2018 | Dec 2024 | Solar |
| Norcap North | LSE Canes Venatici LLC | East Windsor, CT | ISO New England (ISNE) | 3.5 GWh | Nov 2017 | Dec 2024 | Solar |
| Canis Major Solar Farm | LSE Canis Major LLC | Suffield, CT | ISO New England (ISNE) | 3.6 GWh | Nov 2016 | Dec 2024 | Solar |
| Ashby Duffy CSG Solar Farm | LSE Cassiopeia LLC | Ashby, MA | ISO New England (ISNE) | 3.2 GWh | Nov 2017 | Dec 2024 | Solar |
| Centaurus Solar - MA | LSE Centaurus LLC | Ashland, MA | ISO New England (ISNE) | 2.7 GWh | Oct 2016 | Dec 2024 | Solar |
| Lilly Lane | LSE Chamaeleon LLC | Charlton, MA | ISO New England (ISNE) | 1.7 GWh | May 2018 | Dec 2024 | Solar |
| Norcap South | LSE Coma Berenices LLC | East Windsor, CT | ISO New England (ISNE) | 3.6 GWh | Nov 2017 | Dec 2024 | Solar |
| Truck Stop | LSE Corona Austrina LLC | West Stockridge, MA | ISO New England (ISNE) | 2.8 GWh | Oct 2017 | Dec 2024 | Solar |
| Nolan | LSE Crater LLC | Great Barrington, MA | ISO New England (ISNE) | 1.5 GWh | Oct 2017 | Dec 2024 | Solar |
| Powder Hill | LSE Delphinus LLC | Enfield, CT | ISO New England (ISNE) | 3.3 GWh | Nov 2020 | Dec 2024 | Solar |
| Goose Pond Solar | LSE Dorado, LLC | Southwick, MA | ISO New England (ISNE) | 7.0 GWh | Dec 2019 | Dec 2024 | Solar |
| Pulpit Hill | LSE Fornax LLC | Amherst, MA | ISO New England (ISNE) | 7.2 GWh | Jun 2019 | Dec 2024 | Solar |
| Bunce | LSE Indus LLC | North Canaan, CT | ISO New England (ISNE) | 3.3 GWh | Mar 2022 | Dec 2024 | Solar |
| Monument Valley | LSE Lepus LLC | Great Barrington, MA | ISO New England (ISNE) | 3.1 GWh | Dec 2021 | Dec 2024 | Solar |
| Sandwich | LSE Ophiuchus LLC | Sandwich, MA | ISO New England (ISNE) | 4.6 GWh | Jun 2023 | Dec 2024 | Solar |
| Halsey Valley | LSE Pegasus LLC | Barton, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Nov 2020 | Dec 2024 | Solar |
| Hunt Creek | LSE Perseus LLC | Nichols, NY | New York Independent System Operator (NYIS) | 5.4 GWh | Dec 2020 | Dec 2024 | Solar |
| Sand Road | LSE Phoenix LLC | North Canaan, CT | ISO New England (ISNE) | 3.5 GWh | Oct 2021 | Dec 2024 | Solar |
| Platt Hill | LSE Pictor LLC | Winchester, CT | ISO New England (ISNE) | 2.4 GWh | Dec 2021 | Dec 2024 | Solar |
| Smith Creek | LSE Pisces LLC | Nichols, NY | New York Independent System Operator (NYIS) | 6.2 GWh | Mar 2021 | Dec 2024 | Solar |
| University Park North | LSP University Park LLC | University Park, IL | PJM Interconnection, LLC (PJM) | 123.7 GWh | May 2002 | Dec 2024 | Natural Gas |
| LSU Cogen | LSU and A&M College | Baton Rouge, LA | Midcontinent Independent System Operator, Inc. (MISO) | 72.9 GWh | Nov 2004 | Mar 2026 | Natural Gas |
| Lucky Wind | Lucky Wind, LLC (Longroad) | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Nov 2004 | Dec 2024 | Wind |
| Lukuc B Community Solar LLC CSG | Lukuc B Community Solar LLC | Herrin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Jun 2021 | Dec 2024 | Solar |
| Amphitheater High School Solar | Luminace Solar Arizona 2, LLC | Tucson, AZ | Tucson Electric Power (TEPC) | 1.8 GWh | Nov 2016 | Dec 2024 | Solar |
| Canyon Del Oro High School Solar | Luminace Solar Arizona 2, LLC | Oro Valley, AZ | Tucson Electric Power (TEPC) | 2.4 GWh | Oct 2016 | Dec 2024 | Solar |
| Buckeye Union HS District 201 | Luminace Solar Arizona, LLC | Buckeye, AZ | Arizona Public Service Company (AZPS) | 6.8 GWh | Nov 2011 | Dec 2024 | Solar |
| Exelon Solar Chicago | Luminace Solar Chicago, LLC | Chicago, IL | PJM Interconnection, LLC (PJM) | 11.8 GWh | Nov 2009 | Mar 2026 | Solar |
| Constellation New Energy Inc | Luminace Solar Federal, LLC | Medford, NJ | PJM Interconnection, LLC (PJM) | 5.4 GWh | Nov 2011 | Dec 2024 | Solar |
| Georgia Power at Jakin GA PV | Luminace Solar Georgia 2, LLC | Jakin, GA | Southern Company Services, Inc. - Trans (SOCO) | 3.1 GWh | Nov 2017 | Dec 2024 | Solar |
| Georgia Power at Swainsboro | Luminace Solar Georgia 2, LLC | Swainsboro, GA | Southern Company Services, Inc. - Trans (SOCO) | 6.0 GWh | Oct 2017 | Dec 2024 | Solar |
| Georgia Power at Wadley GA | Luminace Solar Georgia, LLC | Wadley, GA | Southeastern Power Administration (SEPA) | 1.9 GWh | Nov 2014 | Dec 2024 | Solar |
| CCBC-Catonsville | Luminace Solar Holding, LLC | Catonsville, MD | PJM Interconnection, LLC (PJM) | 2.5 GWh | Aug 2015 | Dec 2024 | Solar |
| Owens Corning Headquarters | Luminace Solar Holding, LLC | Toledo, OH | PJM Interconnection, LLC (PJM) | 1.6 GWh | Aug 2015 | Dec 2024 | Solar |
| Owens Corning at Bethlehem | Luminace Solar Holding, LLC | Bethlehem, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Sep 2013 | Dec 2024 | Solar |
| Vista Grande HS at Casa Grande | Luminace Solar Holding, LLC | Casa Grande, AZ | Arizona Public Service Company (AZPS) | 2.8 GWh | Nov 2012 | Dec 2024 | Solar |
| Union HS at Casa Grande | Luminace Solar Holding, LLC | Casa Grande, AZ | Arizona Public Service Company (AZPS) | 2.9 GWh | Nov 2012 | Dec 2024 | Solar |
| Slidematic at Rockford | Luminace Solar Illinois 2, LLC | Rockford, IL | PJM Interconnection, LLC (PJM) | 3.3 GWh | Feb 2022 | Dec 2024 | Solar |
| JM Huber at Quincy | Luminace Solar Illinois 2, LLC | Quincy, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Nov 2021 | Dec 2024 | Solar |
| Conagra Foods at St. Elmo | Luminace Solar Illinois 2, LLC | St. Elmo, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 GWh | Dec 2020 | Dec 2024 | Solar |
| Charter Durabar at Woodstock | Luminace Solar Illinois 2, LLC | Woodstock, IL | PJM Interconnection, LLC (PJM) | 3.1 GWh | Dec 2020 | Dec 2024 | Solar |
| The GSI Group LLC at Assumption | Luminace Solar Illinois 2, LLC | Assumption, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Dec 2020 | Dec 2024 | Solar |
| CNE at Cambridge MD | Luminace Solar Maryland II, LLC | Cambridge, MD | PJM Interconnection, LLC (PJM) | 5.5 GWh | Mar 2015 | Dec 2024 | Solar |
| UMMS at Pocomoke | Luminace Solar Maryland II, LLC | Pocomoke City, MD | PJM Interconnection, LLC (PJM) | 5.2 GWh | Jan 2013 | Dec 2024 | Solar |
| McCormick & Co. Inc. at Belcamp | Luminace Solar Maryland, LLC | Belcamp, MD | PJM Interconnection, LLC (PJM) | 2.2 GWh | Nov 2010 | Dec 2024 | Solar |
| Town of Norfolk MA at Medway Branch | Luminace Solar Massachusetts, LLC | Norfolk, MA | ISO New England (ISNE) | 1.9 GWh | May 2012 | Dec 2024 | Solar |
| Smith & Wesson at Springfield MA PV | Luminace Solar Massachusetts, LLC | Springfield, MA | ISO New England (ISNE) | 2.4 GWh | Jun 2017 | Dec 2024 | Solar |
| Gateway Solar | Luminace Solar MC, LLC | Berlin, MD | PJM Interconnection, LLC (PJM) | 9.8 GWh | Feb 2019 | Dec 2024 | Solar |
| Havre de Grace II - E at Perryman | Luminace Solar MC, LLC | Perryman, MD | PJM Interconnection, LLC (PJM) | 1.9 GWh | Apr 2016 | Dec 2024 | Solar |
| Archdiocese of Baltimore J | Luminace Solar MC, LLC | Perryman, MD | PJM Interconnection, LLC (PJM) | 3.3 GWh | Nov 2015 | Dec 2024 | Solar |
| Sod Run WTP A | Luminace Solar MC, LLC | Perryman, MD | PJM Interconnection, LLC (PJM) | 3.3 GWh | Nov 2015 | Dec 2024 | Solar |
| City of Havre De Grace C | Luminace Solar MC, LLC | Perryman, MD | PJM Interconnection, LLC (PJM) | 3.3 GWh | Nov 2015 | Dec 2024 | Solar |
| Baltimore City G | Luminace Solar MC, LLC | Perryman, MD | PJM Interconnection, LLC (PJM) | 2.9 GWh | Nov 2015 | Dec 2024 | Solar |
| Baltimore City B | Luminace Solar MC, LLC | Perryman, MD | PJM Interconnection, LLC (PJM) | 2.0 GWh | Nov 2015 | Dec 2024 | Solar |
| Archdiocese of Baltimore L | Luminace Solar MC, LLC | Perryman, MD | PJM Interconnection, LLC (PJM) | 3.3 GWh | Nov 2015 | Dec 2024 | Solar |
| Baltimore City F | Luminace Solar MC, LLC | Perryman, MD | PJM Interconnection, LLC (PJM) | 3.1 GWh | Nov 2015 | Dec 2024 | Solar |
| Baltimore City D | Luminace Solar MC, LLC | Perryman, MD | PJM Interconnection, LLC (PJM) | 3.1 GWh | Nov 2015 | Dec 2024 | Solar |
| DEC Phase II at Georgetown | Luminace Solar MC, LLC | Georgetown, DE | PJM Interconnection, LLC (PJM) | 5.4 GWh | Nov 2019 | Dec 2024 | Solar |
| NIST Solar | Luminace Solar MC, LLC | Gaithersburg, MD | PJM Interconnection, LLC (PJM) | 5.6 GWh | Nov 2018 | Dec 2024 | Solar |
| Town of Uxbridge MA at Commerce Dr | Luminace Solar Net Metering, LLC | Uxbridge, MA | ISO New England (ISNE) | 2.7 GWh | May 2012 | Dec 2024 | Solar |
| Johnson Matthey, Inc. Solar | Luminace Solar New Jersey II, LLC | Paulsboro, NJ | PJM Interconnection, LLC (PJM) | 5.4 GWh | Feb 2011 | Dec 2024 | Solar |
| Toys R Us- DE, Inc. at Mt. Olive, NJ | Luminace Solar New Jersey II, LLC | Mt. Olive, NJ | PJM Interconnection, LLC (PJM) | 4.7 GWh | Nov 2011 | Dec 2024 | Solar |
| Benjamin Moore & Co. Solar | Luminace Solar New Jersey, LLC | Mount Olive, NJ | PJM Interconnection, LLC (PJM) | 1.9 GWh | Nov 2010 | Dec 2024 | Solar |
| The City of Vineland at West Vineland | Luminace Solar New Jersey, LLC | Vineland, NJ | PJM Interconnection, LLC (PJM) | 3.3 GWh | Sep 2011 | Dec 2024 | Solar |
| The City of Vineland at North Vineland | Luminace Solar New Jersey, LLC | Vineland, NJ | PJM Interconnection, LLC (PJM) | 4.1 GWh | Sep 2011 | Dec 2024 | Solar |
| NHA at Mansfield NJ | Luminace Solar New Jersey, LLC | Washington, NJ | PJM Interconnection, LLC (PJM) | 2.6 GWh | Jun 2016 | Dec 2024 | Solar |
| Roger Williams - Melville at Portsmouth | Luminace Solar Rhode Island, LLC | Portsmouth, RI | ISO New England (ISNE) | 4.7 GWh | Feb 2021 | Dec 2024 | Solar |
| ME Novel Lighthouse - Penobscot CSG | Luminace Sunbeam Development Holdings, LLC | Patten, ME | ISO New England (ISNE) | 812.0 MWh | Aug 2024 | Dec 2024 | Solar |
| Cenergy - Kiger | Luminace Sunbeam Development Holdings, LLC | Embden, ME | ISO New England (ISNE) | 2.0 GWh | Nov 2023 | Dec 2024 | Solar |
| Cenergy - Wiscasset (CSG) | Luminace Sunbeam Development Holdings, LLC | Wiscasset, ME | ISO New England (ISNE) | 8.5 GWh | Jun 2023 | Dec 2024 | Solar |
| Cenergy - Waterville (CSG) | Luminace Sunbeam Development Holdings, LLC | Waterville, ME | ISO New England (ISNE) | 9.1 GWh | Jun 2023 | Dec 2024 | Solar |
| Cenergy - Richards (CSG) | Luminace Sunbeam Development Holdings, LLC | Fairfield, ME | ISO New England (ISNE) | 1.8 GWh | Sep 2023 | Dec 2024 | Solar |
| ME Novel Lighthouse - Carrabassett | Luminace Sunbeam Development Holdings, LLC | Carrabassett Valley, ME | ISO New England (ISNE) | 5.2 GWh | Nov 2023 | Dec 2024 | Solar |
| ME Novel Lighthouse - Front St. Solar CS | Luminace Sunbeam Development Holdings, LLC | Skowhegan, ME | ISO New England (ISNE) | 3.9 GWh | Apr 2023 | Dec 2024 | Solar |
| ME Novel Lighthouse - Huggard Ave Solar | Luminace Sunbeam Development Holdings, LLC | Limestone, ME | (NA) | 2.5 GWh | Jan 2024 | Dec 2024 | Solar |
| Dick's Creek | Luminant Dick's Creek | Monroe, OH | PJM Interconnection, LLC (PJM) | 8.7 GWh | Aug 1965 | Dec 2024 | Natural Gas |
| Trinidad (TX) | Luminant Generation Company LLC | Trinidad, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 376.4 GWh | Apr 1965 | Dec 2024 | Natural Gas |
| Stryker Creek | Luminant Generation Company LLC | Jacksonville, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 921.7 GWh | May 1958 | Dec 2024 | Natural Gas : 99.9% |
| Permian Basin | Luminant Generation Company LLC | Monahans, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 464.5 GWh | May 1958 | Dec 2024 | Natural Gas : 99.1% Distillate Fuel Oil : 0.9% |
| Morgan Creek | Luminant Generation Company LLC | Colorado City, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 23.5 GWh | Jun 1988 | Dec 2024 | Distillate Fuel Oil : 65.6% Natural Gas : 34.4% |
| Graham | Luminant Generation Company LLC | Graham, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.0 TWh | Nov 1960 | Dec 2024 | Natural Gas : 99.8% |
| Lake Hubbard | Luminant Generation Company LLC | Sunnyvale, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.7 TWh | May 1970 | Dec 2024 | Natural Gas : 97.3% Distillate Fuel Oil : 2.7% |
| Comanche Peak | Luminant Generation Company LLC | Glen Rose, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 20.1 TWh | Jul 1990 | Mar 2026 | Nuclear |
Summary of Power Plants By State
Figures are based on March 2026 generation numbers.| State | Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 76 | 10,194.39 GWh |
| Alaska | # 48 | 139 | 566.31 GWh |
| Arizona | # 15 | 183 | 8,256.99 GWh |
| Arkansas | # 25 | 114 | 4,973.03 GWh |
| California | # 5 | 1,656 | 15,197.83 GWh |
| Colorado | # 30 | 294 | 4,491.41 GWh |
| Connecticut | # 31 | 161 | 3,992.67 GWh |
| Delaware | # 49 | 33 | 248.78 GWh |
| District of Columbia | # 51 | 16 | 18.32 GWh |
| Florida | # 3 | 334 | 19,802.71 GWh |
| Georgia | # 8 | 247 | 10,697.11 GWh |
| Hawaii | # 46 | 69 | 784.18 GWh |
| Idaho | # 42 | 144 | 1,957.44 GWh |
| Illinois | # 4 | 379 | 15,489.73 GWh |
| Indiana | # 12 | 216 | 9,257.49 GWh |
| Iowa | # 21 | 289 | 6,478.67 GWh |
| Kansas | # 23 | 183 | 5,489.55 GWh |
| Kentucky | # 29 | 59 | 4,637.74 GWh |
| Louisiana | # 17 | 86 | 8,003.69 GWh |
| Maine | # 45 | 212 | 1,313.24 GWh |
| Maryland | # 39 | 202 | 2,834.84 GWh |
| Massachusetts | # 44 | 639 | 1,383.17 GWh |
| Michigan | # 13 | 268 | 8,564.76 GWh |
| Minnesota | # 26 | 760 | 4,875.53 GWh |
| Mississippi | # 24 | 55 | 5,467.46 GWh |
| Missouri | # 22 | 125 | 5,500.53 GWh |
| State | Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 69 | 2,464.49 GWh |
| Nebraska | # 37 | 121 | 3,330.39 GWh |
| Nevada | # 35 | 114 | 3,487.65 GWh |
| New Hampshire | # 43 | 54 | 1,520.13 GWh |
| New Jersey | # 28 | 379 | 4,705.05 GWh |
| New Mexico | # 33 | 142 | 3,587.89 GWh |
| New York | # 9 | 935 | 10,247.40 GWh |
| North Carolina | # 11 | 896 | 9,821.46 GWh |
| North Dakota | # 32 | 59 | 3,854.12 GWh |
| Ohio | # 6 | 200 | 12,175.28 GWh |
| Oklahoma | # 19 | 142 | 7,305.54 GWh |
| Oregon | # 20 | 266 | 6,583.30 GWh |
| Pennsylvania | # 2 | 249 | 20,000.86 GWh |
| Rhode Island | # 47 | 100 | 610.71 GWh |
| South Carolina | # 14 | 204 | 8,273.25 GWh |
| South Dakota | # 41 | 52 | 2,184.62 GWh |
| Tennessee | # 18 | 88 | 7,335.80 GWh |
| Texas | # 1 | 961 | 46,858.09 GWh |
| Utah | # 38 | 125 | 3,184.50 GWh |
| Vermont | # 50 | 117 | 217.82 GWh |
| Virginia | # 16 | 233 | 8,059.42 GWh |
| Washington | # 7 | 131 | 10,773.76 GWh |
| West Virginia | # 34 | 40 | 3,543.98 GWh |
| Wisconsin | # 27 | 239 | 4,794.79 GWh |
| Wyoming | # 36 | 70 | 3,358.51 GWh |