Sweetwater Wind 3 LLC

10 miles South Hwy 70, Sweetwater, TX 79556

Plant Summary Information

Sweetwater Wind 3 LLC is ranked #130 out of 231 wind farms in Texas in terms of total annual net electricity generation.

Sweetwater Wind 3 LLC generated 122.8 GWh during the 3-month period between September 2025 to December 2025.

Plant NameSweetwater Wind 3 LLC
Utility NameLeeward Asset Management, LLC
LocationNolan County, TX
Initial Operation DateDecember 2005
Last Update Dec 2025
Annual Generation 472.3 GWh
Annual Consumption 1.7 M MMBtu
Ranked #1,449 out of 13,301 Power Plants Nationwide
Ranked #410 out of 1,377 Wind Power Plants Nationwide
Ranked #313 out of 861 Texas Power Plants
Ranked #130 out of 231 Texas Wind Power Plants
Fuel Types Wind
Previous Operator Infigen Asset Management LLC (2013 to 2014)
Leeward Asset Management, LLC (2015 to 2025)

Map of Sweetwater Wind 3 LLC

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sweetwater Wind 3 LLC.

Create Your Account Today

Monthly Net Generation for Sweetwater Wind 3 LLC

Monthly Plant Fuel Consumption for Sweetwater Wind 3 LLC

Sweetwater Wind 3 LLC Details

Summary Information
Plant NameSweetwater Wind 3 LLC (56311)
Plant Address10 miles South Hwy 70, Sweetwater, TX 79556
UtilityLeeward Asset Management, LLC (50123)
Latitude, Longitude32.29083, -100.4219
Generation Dates on FileDec 2005 to Dec 2025
Initial Operation DateDecember 2005
Annual Generation 472.3 GWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusYes
FERC Exempt Wholesale Generator Docket Number06-23-000
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc. (ERCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerOncor Electric Delivery Company LLC (44372) TX
Grid Voltage 345.00 kV
Energy StorageNo

Generator SW3 Details Operating December 2005

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipSingle Owner
RTO ISO LMP Node DesignationSWEETWN3_3
RTO ISO Location Designation For Reporting Wholesale Sales DataSWEETWN3_3
Nameplate Capacity135 MW
Summer Capacity144 MW
Winter Capacity144 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2005
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWind
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Turbines/Hydrokinetic Buoys90
Multiple FuelsNo
Turbine Details
Number Of Turbines90
Predominant Turbine ManufacturerGE
Predominant Turbine Model Number1.5 SLE
Design Wind Speed19 MPH
Wind Quality Class2 - Medium Wind
Turbine Hub Height Feet262

Sweetwater Wind 3 LLC Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#400Bingham WindBingham, ME483.7 GWh
#401Blackstone Wind Farm II LLCDwight, IL481.5 GWh
#402Wildcat Creek Wind Farm LLCGainesville, TX481.3 GWh
#403Osage Wind, LLCBurbank, OK480.3 GWh
#404Marble River Wind FarmChurubusco, NY477.9 GWh
#405Deerfield Wind Energy, LLCKinde, MI477.7 GWh
#406Chevelon Butte Phase 2Winslow, AZ477.2 GWh
#407Ironwood WindSpearville, KS476.3 GWh
#408RockspringsDel Rio, TX475.5 GWh
#409Meridian Wind ParkMerrill, MI475.0 GWh
#411Glass Sands Wind FacilitySulphur, OK472.0 GWh
#412Ford County Wind Farm LLCFord County, IL471.4 GWh
#413Pioneer Trail Wind Farm, LLCPaxton, IL470.4 GWh
#414Laurel Wind FarmLaurel, IA470.0 GWh
#415Ponderosa Wind IIBalko, OK469.3 GWh
#416GlenrockGlenrock, WY469.2 GWh
#417Cranell Wind Farm LLCTBD, TX469.2 GWh
#418Scioto Ridge Wind FarmBelle Center, OH468.2 GWh
#419La Chalupa, LLCRio Hondo, TX466.8 GWh
#420Heartland FarmsMiddleton, MI464.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Sweetwater Wind 3 LLC.

Plant NamePlant LocationAnnual GenerationDistance
Buffalo Gap 2 Wind FarmMerkel, TX350.4 GWh14.4 mi
Buffalo Gap 3 Wind FarmNolan, TX337.7 GWh18.8 mi
Buffalo Gap Wind FarmMerkel, TX158.7 GWh21.1 mi
Callahan Divide Wind Energy CenterTusocola, TX422.0 GWh23.4 mi
Champion Wind Farm LLCRoscoe, TX382.3 GWh15.1 mi
Holstein 1 Solar FarmWingate, TX445.6 GWh19.9 mi
Horse Hollow Wind Energy CenterWingate, TX2.5 TWh22 mi
Inadale Wind Farm LLC HybridRoscoe, TX321.2 GWh17 mi
Loraine Windpark Project LLCLoraine, TX327.9 GWh21.4 mi
Maryneal WindpowerMaryneal, TX504.6 GWh7.5 mi
Mesquite StarRoscoe, TX1.3 TWh6.4 mi
Pyron Wind Farm LLC HybridHermleigh, TX966.5 GWh25.2 mi
Roscoe Wind Farm LLCRoscoe, TX359.0 GWh18.9 mi
South Trent Wind FarmSweetwater, TX272.3 GWh18.9 mi
Sweetwater Wind 1 LLCSweetwater, TX138.2 GWh6.8 mi
Sweetwater Wind 2 LLCSweetwater, TX351.7 GWh4.9 mi
Sweetwater Wind 4 LLCRoscoe, TX632.3 GWh6.5 mi
Sweetwater Wind 5Roscoe, TX172.5 GWh5.2 mi
Trent Wind FarmTrent, TX525.7 GWh14.5 mi
Turkey Track Wind Energy LLCBlackwell, TX331.4 GWh11 mi