Sweetwater Wind 3 LLC
10 miles South Hwy 70, Sweetwater, TX 79556Plant Summary Information
Sweetwater Wind 3 LLC is ranked #116 out of 221 wind farms in Texas in terms of total annual net electricity generation.
Sweetwater Wind 3 LLC generated 127.5 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Sweetwater Wind 3 LLC |
---|---|
Utility Name | Leeward Asset Management, LLC |
Location | Nolan County, TX |
Initial Operation Date | December 2005 |
Last Update | Dec 2024 |
Annual Generation | 470.0 GWh |
Annual Consumption | 1.8 M MMBtu |
Ranked #1,361 out of 12,288 Power Plants Nationwide | |
Ranked #385 out of 1,353 Wind Power Plants Nationwide | |
Ranked #259 out of 788 Texas Power Plants | |
Ranked #116 out of 221 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Infigen Asset Management LLC (2013 to 2014) Leeward Asset Management, LLC (2015 to 2024) |
Map of Sweetwater Wind 3 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sweetwater Wind 3 LLC.
Monthly Net Generation for Sweetwater Wind 3 LLC
Sweetwater Wind 3 LLC Details
Summary Information | |
---|---|
Plant Name | Sweetwater Wind 3 LLC (56311) |
Plant Address | 10 miles South Hwy 70, Sweetwater, TX 79556 |
Utility | Leeward Asset Management, LLC (50123) |
Latitude, Longitude | 32.29083, -100.4219 |
Generation Dates on File | Dec 2005 to Dec 2024 |
Initial Operation Date | December 2005 |
Annual Generation | 470.0 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 06-23-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator SW3 Details Operating December 2005
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SWEETWN3_3 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SWEETWN3_3 |
Nameplate Capacity | 135 MW |
Summer Capacity | 144 MW |
Winter Capacity | 144 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2005 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 90 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 90 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SLE |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262 |
Sweetwater Wind 3 LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#375 | Langdon Renewables, LLC | Langdon, ND | 482.4 GWh |
#376 | NedPower Mount Storm | Mount Storm, WV | 481.5 GWh |
#377 | Dakota Range Wind | Marvin, SD | 480.4 GWh |
#378 | Rock Falls Wind Farm LLC | Braman, OK | 479.7 GWh |
#379 | Adams Wind | Lenox, IA | 474.5 GWh |
#380 | Mesquite Creek Wind | Lamesa, TX | 473.2 GWh |
#381 | Buffalo Ridge Wind | Lake Benton, MN | 472.7 GWh |
#382 | Cedar Creek Wind, LLC | Shelley, ID | 470.9 GWh |
#383 | Los Vientos Windpower III | Rio Grande City, TX | 470.5 GWh |
#384 | Otter Creek Wind Farm LLC | Ransom, IL | 470.4 GWh |
#386 | Wellsburg Wind Project | Wellsburg, IA | 468.7 GWh |
#387 | Rocksprings | Del Rio, TX | 464.9 GWh |
#388 | Ensign Wind LLC | Montezuma, KS | 464.2 GWh |
#389 | Shannon Wind | Windhorst, TX | 463.5 GWh |
#390 | Laurel Wind Farm | Laurel, IA | 463.1 GWh |
#391 | Bishop Hill III | Cambridge, IL | 462.7 GWh |
#392 | Bobcat Bluff Wind Project LLC | Archer, TX | 462.3 GWh |
#393 | Gunsight Mountain Wind Energy LLC | Big Spring, TX | 460.7 GWh |
#394 | Cactus Flats Wind Energy Project | Eden, TX | 460.4 GWh |
#395 | Pioneer Trail Wind Farm, LLC | Paxton, IL | 458.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sweetwater Wind 3 LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Buffalo Gap 2 Wind Farm | Merkel, TX | 372.6 GWh | 14.4 mi |
Buffalo Gap 3 Wind Farm | Nolan, TX | 302.2 GWh | 18.8 mi |
Buffalo Gap Wind Farm | Merkel, TX | 179.0 GWh | 21.1 mi |
Callahan Divide Wind Energy Center | Tusocola, TX | 414.3 GWh | 23.4 mi |
Champion Wind Farm LLC | Roscoe, TX | 94.9 GWh | 15.1 mi |
Holstein 1 Solar Farm | Wingate, TX | 386.0 GWh | 19.9 mi |
Horse Hollow Wind Energy Center | Wingate, TX | 2.5 TWh | 22 mi |
Inadale Wind Farm LLC Hybrid | Roscoe, TX | 335.1 GWh | 17 mi |
Jameson Gas Processing Plant | Silver, TX | 12.9 GWh | 22.9 mi |
Loraine Windpark Project LLC | Loraine, TX | 307.8 GWh | 21.4 mi |
Maryneal Windpower | Maryneal, TX | 569.6 GWh | 7.5 mi |
Mesquite Star | Roscoe, TX | 1.2 TWh | 6.4 mi |
Roscoe Wind Farm LLC | Roscoe, TX | 343.2 GWh | 18.9 mi |
South Trent Wind Farm | Sweetwater, TX | 252.5 GWh | 18.9 mi |
Sweetwater Wind 1 LLC | Sweetwater, TX | 140.8 GWh | 6.8 mi |
Sweetwater Wind 2 LLC | Sweetwater, TX | 340.6 GWh | 4.9 mi |
Sweetwater Wind 4 LLC | Roscoe, TX | 636.6 GWh | 6.5 mi |
Sweetwater Wind 5 | Roscoe, TX | 163.2 GWh | 5.2 mi |
Trent Wind Farm | Trent, TX | 515.0 GWh | 14.5 mi |
Turkey Track Wind Energy LLC | Blackwell, TX | 300.7 GWh | 11 mi |