Lenape II
441 N Shadeland Avenue, Indianapolis, IN 46219Plant Summary Information
Lenape II is ranked #70 out of 125 solar farms in Indiana in terms of total annual net electricity generation.
Lenape II generated 732.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Lenape II |
|---|---|
| Utility Name | Lenape Solar II, LLC |
| Location | Marion County, IN |
| Initial Operation Date | November 2015 |
| Last Update | Dec 2025 |
| Annual Generation | 4.9 GWh |
| Annual Consumption | 17.4 k MMBtu |
| Ranked #8,263 out of 13,081 Power Plants Nationwide | |
| Ranked #3,531 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #156 out of 218 Indiana Power Plants | |
| Ranked #70 out of 125 Indiana Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
NGP Lenape Solar II, LLC (2013 to 2013) Lenape Solar II, LLC (2014 to 2025) |
Map of Lenape II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lenape II.
Monthly Net Generation for Lenape II
Monthly Plant Fuel Consumption for Lenape II
Lenape II Details
| Summary Information | |
|---|---|
| Plant Name | Lenape II (58703) |
| Plant Address | 441 N Shadeland Avenue, Indianapolis, IN 46219 |
| Utility | Lenape Solar II, LLC (58638) |
| Latitude, Longitude | 39.77667, -86.04278 |
| Generation Dates on File | Nov 2015 to Dec 2025 |
| Initial Operation Date | November 2015 |
| Annual Generation | 4.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF15-909 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Indianapolis Power & Light Co (9273) IN |
| Grid Voltage | 13.20 kV |
| Energy Storage | No |
Generator 1 Details Operating November 2015
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 4 MW |
| Summer Capacity | 4 MW |
| Winter Capacity | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2015 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Lenape II Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3521 | San Diego - EMDF at San Diego | San Diego, CA | 4.9 GWh |
| #3522 | County Road 17 (CSG) | Afton, NY | 4.9 GWh |
| #3523 | Milo Solar | Burlington, NC | 4.9 GWh |
| #3524 | Carver Gladden CSG | Norwood Young America, MN | 4.9 GWh |
| #3525 | Niagara Solar Project | Randomville, NY | 4.9 GWh |
| #3526 | East Orange Solar | Millburn Township, NJ | 4.9 GWh |
| #3527 | Soul City Solar | Norlina, NC | 4.9 GWh |
| #3528 | IPC 25 Solar | Tracy, CA | 4.9 GWh |
| #3529 | Ryans Ranch | Paris, ME | 4.9 GWh |
| #3530 | IGS SBD2 | San Bernardino, CA | 4.9 GWh |
| #3532 | Battleground | Kings Mountain, NC | 4.9 GWh |
| #3533 | Iron Horse Battery Storage Hybrid | Tucson, AZ | 4.2 GWh |
| #3534 | Marmas Solar CSG | St. Cloud, MN | 4.9 GWh |
| #3535 | Vermillion River_MN_GRE DEA-GM | Farmington, MN | 4.9 GWh |
| #3536 | Hinton | Hinton, OK | 4.9 GWh |
| #3537 | IGS SBD1 | Bloomington, CA | 4.9 GWh |
| #3538 | Mill Creek Solar | Burlington, NJ | 4.9 GWh |
| #3539 | Berkley East Solar LLC | Berkley, MA | 4.9 GWh |
| #3540 | Barnstable Landfill | Marstons Mills, MA | 4.9 GWh |
| #3541 | Horn Rapids Solar, Storage and Training | Richland, WA | 4.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lenape II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Belmont | Indianapolis, IN | 5.2 GWh | 8.9 mi |
| CC Perry K | Indianapolis, IN | 15.2 GWh | 6.6 mi |
| Duke Building 129 | Indianapolis, IN | 4.4 GWh | 14.2 mi |
| Duke Building 87 | Indianapolis, IN | 3.4 GWh | 13.8 mi |
| Duke Building 98 | Indianapolis, IN | 4.1 GWh | 14.5 mi |
| Georgetown | Indianapolis, IN | 307.0 GWh | 13.8 mi |
| Greenfield Solar Park | Greenfield, IN | 4.8 GWh | 12.1 mi |
| Harding Street | Indianapolis, IN | 4.0 TWh | 9.3 mi |
| Hurricane Creek Lift Station | Greenwood, IN | 143.0 MWh | 15.1 mi |
| Indianapolis Motor Speedway Solar PV | Indianapolis, IN | 12.7 GWh | 10.2 mi |
| Indy Grocers | Indianapolis, IN | 1.2 GWh | 10.7 mi |
| INDY III | Indianapolis, IN | 3.2 GWh | 14.9 mi |
| Indy Solar I, LLC | Indianapolis, IN | 15.3 GWh | 8.4 mi |
| Indy Solar II, LLC | Indianapolis, IN | 14.9 GWh | 8.4 mi |
| Indy Solar III, LLC | Indianapolis, IN | 13.3 GWh | 14.1 mi |
| M. G. Emmett J. Bean Federal Center | Indianapolis, IN | 519.0 MWh | 5.5 mi |
| Marion Solar LNG | Indianapolis, IN | 1.8 GWh | 14 mi |
| Maywood Photovoltaic Project | Indianapolis, IN | 11.5 GWh | 9.6 mi |
| Rockville Solar I LLC | Indianapolis, IN | 1.7 GWh | 13.8 mi |
| Rockville Solar II, LLC | Indianapolis, IN | 912.0 MWh | 13.7 mi |