Black Bear Solar 1
3670 Butler Mill Road, Montgomery, AL 36105Plant Summary Information
Black Bear Solar 1 is ranked #47 out of 76 power plants in Alabama in terms of total annual net electricity generation.
Black Bear Solar 1 generated 33.2 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Black Bear Solar 1 |
|---|---|
| Utility Name | Lightsource Renewable Energy Asset Management, LLC |
| Location | Montgomery County, AL |
| Initial Operation Date | February 2023 |
| Last Update | Feb 2026 |
| Annual Generation | 213.3 GWh |
| Annual Consumption | 772.5 k MMBtu |
| Ranked #2,419 out of 12,637 Power Plants Nationwide | |
| Ranked #400 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #47 out of 76 Alabama Power Plants | |
| Ranked #2 out of 13 Alabama Solar Power Plants | |
| Fuel Types | Solar |
Map of Black Bear Solar 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Black Bear Solar 1.
Monthly Net Generation for Black Bear Solar 1
Monthly Plant Fuel Consumption for Black Bear Solar 1
Black Bear Solar 1 Details
| Summary Information | |
|---|---|
| Plant Name | Black Bear Solar 1 (63765) |
| Plant Address | 3670 Butler Mill Road, Montgomery, AL 36105 |
| Utility | Lightsource Renewable Energy Asset Management, LLC (62842) |
| Latitude, Longitude | 32.19697, -86.32734 |
| Generation Dates on File | Feb 2023 to Feb 2026 |
| Initial Operation Date | February 2023 |
| Annual Generation | 213.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 21-250-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Alabama Power Co (195) AL |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator ALBB1 Details Operating February 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 100 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | February 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 52 |
| DC Net Capacity | 130 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Black Bear Solar 1 Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Black Bear Alabama Solar 1, LLC | 400 Montgomery Street, 8th Floor, San Francisco, CA 94104 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #390 | Ivanpah 2 | Nipton, CA | 229.2 GWh |
| #391 | Winfield Solar | Winfield, MO | 218.7 GWh |
| #392 | Ross County Solar, LLC | Greenfield, OH | 218.0 GWh |
| #393 | Henrietta Solar Project | Lemoore, CA | 218.0 GWh |
| #394 | Rosamond South 1 | Rosamond, CA | 205.6 GWh |
| #395 | Briar Creek Solar 1 | Corsicana, TX | 217.6 GWh |
| #396 | Happy Solar 1 | Searcy, AR | 216.4 GWh |
| #397 | BPL Crown Solar LLC | Chilton, TX | 214.7 GWh |
| #398 | Lamesa Solar | Lamesa, TX | 214.0 GWh |
| #399 | Chicot Solar | Lake Village, AR | 213.4 GWh |
| #401 | Orange Grove | Jim Wells, TX | 212.6 GWh |
| #402 | Elektron Solar, LLC | Grantsville, UT | 212.3 GWh |
| #403 | BPL Sol Solar LLC | Chilton, TX | 211.9 GWh |
| #404 | Escalante Solar II, LLC | Milford, UT | 211.7 GWh |
| #405 | Iron Springs Solar, LLC | Cedar City, UT | 211.6 GWh |
| #406 | Martin County Solar Project, LLC | Pilgrim, KY | 211.5 GWh |
| #407 | Fern Solar LLC | Battleboro, NC | 211.4 GWh |
| #408 | Escalante Solar I, LLC | Milford, UT | 211.3 GWh |
| #409 | Copper Mountain Solar 4, LLC | Boulder City, NV | 211.3 GWh |
| #410 | Badger Hollow II | Cobb, WI | 211.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Black Bear Solar 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AMEA Peaking | Sylacauga, AL | 35.2 GWh | 67 mi |
| Central Alabama Generating Station | Billingsley, AL | 5.1 TWh | 39.5 mi |
| E B Harris Electric Generating Plant | Autaugaville, AL | 4.8 TWh | 19.2 mi |
| Gantt | Andalusia, AL | 3.4 GWh | 55.6 mi |
| General Electric Plastic | Burkeville, AL | 602.0 GWh | 14 mi |
| Hillabee Energy Center | Alexander City, AL | 3.1 TWh | 60.8 mi |
| International Paper Prattville Mill | Prattville, AL | 555.4 GWh | 17.5 mi |
| International Paper Riverdale Mill | Selma, AL | 562.2 GWh | 35.5 mi |
| Jones Bluff | Selma, AL | 243.7 GWh | 28.1 mi |
| Jordan Dam | Wetumpka, AL | 270.7 GWh | 29.5 mi |
| Lay Dam | Clanton, AL | 454.4 GWh | 54.1 mi |
| Martin Dam | Dadeville, AL | 305.9 GWh | 41.3 mi |
| McWilliams | Gantt, AL | 3.5 TWh | 55.7 mi |
| Millers Ferry | Camden, AL | 272.7 GWh | 63.1 mi |
| Mitchell Dam | Verbena, AL | 355.5 GWh | 42.6 mi |
| Point A | Andalusia, AL | 14.9 GWh | 58.8 mi |
| Tenaska Lindsay Hill Generating Station | Billingsley, AL | 1.5 TWh | 39.5 mi |
| Thurlow Dam | Tallassee, AL | 211.8 GWh | 34.7 mi |
| Walter Bouldin Dam | Wetumpka, AL | 450.3 GWh | 26.9 mi |
| Yates Dam | Tallassee, AL | 96.5 GWh | 36.5 mi |