Sweetwater Wind 1 LLC
7051 Hwy 70, Sweetwater, TX 79556Plant Summary Information
Sweetwater Wind 1 LLC is ranked #200 out of 224 wind farms in Texas in terms of total annual net electricity generation.
Sweetwater Wind 1 LLC generated 37.5 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Sweetwater Wind 1 LLC |
|---|---|
| Utility Name | Leeward Asset Management, LLC |
| Location | Nolan County, TX |
| Initial Operation Date | December 2003 |
| Last Update | Dec 2024 |
| Annual Generation | 140.8 GWh |
| Annual Consumption | 524.1 k MMBtu |
| Ranked #2,967 out of 12,539 Power Plants Nationwide | |
| Ranked #828 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #468 out of 799 Texas Power Plants | |
| Ranked #200 out of 224 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Infigen Asset Management LLC (2013 to 2014) Leeward Asset Management, LLC (2015 to 2024) |
Map of Sweetwater Wind 1 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sweetwater Wind 1 LLC.
Monthly Net Generation for Sweetwater Wind 1 LLC
Sweetwater Wind 1 LLC Details
| Summary Information | |
|---|---|
| Plant Name | Sweetwater Wind 1 LLC (56211) |
| Plant Address | 7051 Hwy 70, Sweetwater, TX 79556 |
| Utility | Leeward Asset Management, LLC (50123) |
| Latitude, Longitude | 32.3606, -100.3389 |
| Generation Dates on File | Jan 2005 to Dec 2024 |
| Initial Operation Date | December 2003 |
| Annual Generation | 140.8 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 04-22-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator SW1 Details Operating December 2003
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | SWEETWND_1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | SWEETWND_1 |
| Nameplate Capacity | 37.5 MW |
| Summer Capacity | 37.5 MW |
| Winter Capacity | 37.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 25 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 25 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.5 S |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262 |
Sweetwater Wind 1 LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #818 | Downeast Wind | Columbia, ME | 144.8 GWh |
| #819 | Whitney Hill Wind Power LLC | Mt.Pulaski, IL | 144.8 GWh |
| #820 | Prescott Wind Farm | Prescott, IA | 144.0 GWh |
| #821 | Cameron Ridge LLC | Mojave, CA | 144.0 GWh |
| #822 | Ellenburg | Churubusco, NY | 143.1 GWh |
| #823 | Ashtabula Wind III LLC | Luverne, ND | 142.6 GWh |
| #824 | Dillon Wind LLC | North Palm Springs, CA | 142.4 GWh |
| #825 | Voyager Wind III | Mojave, CA | 141.2 GWh |
| #826 | Providence Heights Wind LLC | Tiskilwa, IL | 141.2 GWh |
| #827 | Hart Wind | Hart, TX | 140.9 GWh |
| #829 | Peyton Creek Wind Farm II | Bay City, TX | 140.5 GWh |
| #830 | Passadumkeag Windpark LLC | Greenbush, ME | 140.2 GWh |
| #831 | Butler Ridge | Mayville, WI | 140.2 GWh |
| #832 | Busch Ranch II Wind Farm | Walsenburg, CO | 140.0 GWh |
| #833 | Elkhorn Ridge Wind LLC | Bloomfield, NE | 138.2 GWh |
| #834 | FPL Energy North Dakota Wind I/II | Edgeley, ND | 136.7 GWh |
| #835 | OU Spirit Wind Farm | Woodward, OK | 136.4 GWh |
| #836 | Prairie Breeze III | Elgin, NE | 136.3 GWh |
| #837 | Rollins Wind Project | Winn Village, ME | 136.1 GWh |
| #838 | Spearville | Ford, KS | 133.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sweetwater Wind 1 LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Buffalo Gap 2 Wind Farm | Merkel, TX | 351.2 GWh | 9.9 mi |
| Buffalo Gap 3 Wind Farm | Nolan, TX | 302.2 GWh | 14.8 mi |
| Buffalo Gap Wind Farm | Merkel, TX | 179.0 GWh | 16.5 mi |
| Callahan Divide Wind Energy Center | Tusocola, TX | 414.3 GWh | 18.9 mi |
| Champion Wind Farm LLC | Roscoe, TX | 94.9 GWh | 18.2 mi |
| Holstein 1 Solar Farm | Wingate, TX | 275.3 GWh | 20.5 mi |
| Horse Hollow Wind Energy Center | Wingate, TX | 2.4 TWh | 19.3 mi |
| Inadale Wind Farm LLC Hybrid | Roscoe, TX | 335.1 GWh | 16.9 mi |
| Loraine Windpark Project LLC | Loraine, TX | 307.8 GWh | 24.2 mi |
| Maryneal Windpower | Maryneal, TX | 592.1 GWh | 14.3 mi |
| Mesquite Star | Roscoe, TX | 1.1 TWh | 7.3 mi |
| Pyron Wind Farm LLC Hybrid | Hermleigh, TX | 787.1 GWh | 25 mi |
| Roscoe Wind Farm LLC | Roscoe, TX | 352.5 GWh | 20.5 mi |
| South Trent Wind Farm | Sweetwater, TX | 252.5 GWh | 12.7 mi |
| Sweetwater Wind 2 LLC | Sweetwater, TX | 340.6 GWh | 2.1 mi |
| Sweetwater Wind 3 LLC | Sweetwater, TX | 470.0 GWh | 6.8 mi |
| Sweetwater Wind 4 LLC | Roscoe, TX | 644.6 GWh | 11.7 mi |
| Sweetwater Wind 5 | Roscoe, TX | 163.2 GWh | 12 mi |
| Trent Wind Farm | Trent, TX | 515.0 GWh | 7.7 mi |
| Turkey Track Wind Energy LLC | Blackwell, TX | 300.7 GWh | 12 mi |