Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| C W Tippy | Consumers Energy Co - (MI) | Wellston, MI | Midcontinent Independent System Operator, Inc. (MISO) | 54.2 GWh | Dec 1917 | Dec 2024 | Water |
| Allegan Dam | Consumers Energy Co - (MI) | Allegan, MI | Midcontinent Independent System Operator, Inc. (MISO) | 12.3 GWh | Dec 1934 | Dec 2024 | Water |
| Grand Valley Solar Gardens | Consumers Energy Co - (MI) | Allendale, MI | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Mar 2016 | Feb 2026 | Solar |
| Western Michigan Solar Gardens | Consumers Energy Co - (MI) | Kalamazoo, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Jul 2016 | Feb 2026 | Solar |
| Bissell Solar and Battery Generator | Consumers Energy Co - (MI) | Grand Rapids, MI | Midcontinent Independent System Operator, Inc. (MISO) | 432.0 MWh | Aug 2021 | Dec 2024 | Solar |
| Muskegon Solar | Consumers Energy Co - (MI) | Muskegon, MI | Midcontinent Independent System Operator, Inc. (MISO) | 27.4 GWh | - | Feb 2026 | Solar |
| Heartland Farms | Consumers Energy Co - (MI) | Middleton, MI | Midcontinent Independent System Operator, Inc. (MISO) | 464.2 GWh | Mar 2024 | Feb 2026 | Wind |
| Cross Winds Energy Park | Consumers Energy Co - (MI) | Unionville, MI | Midcontinent Independent System Operator, Inc. (MISO) | 720.9 GWh | Nov 2014 | Dec 2024 | Wind |
| Elk Basin Gasoline Plant | Contango Oil and Gas | Powell, WY | PacifiCorp East (PACE) | 6.7 GWh | Dec 1947 | Dec 2024 | Other Gas |
| Black Hollow Sun | Contour Global | Auit, CO | Public Service Company of Colorado (PSCO) | 92.1 GWh | - | Feb 2026 | Solar |
| Cicero Energy Storage 2 LLC | Convergent Energy and Power LP | East Syracuse, NY | New York Independent System Operator (NYIS) | 7.4 GWh | Feb 2022 | Dec 2024 | Solar |
| Cicero Energy Storage 1 LLC | Convergent Energy and Power LP | East Syracuse, NY | New York Independent System Operator (NYIS) | 7.0 GWh | Feb 2022 | Dec 2024 | Solar |
| Federalsburg Energy Storage 1 LLC | Convergent Energy and Power LP | Federaslburg, MD | PJM Interconnection, LLC (PJM) | 1.3 GWh | Oct 2021 | Dec 2024 | Solar |
| Clifton Dam 3 Power Station | Converse Energy Inc | Converse, SC | Duke Energy Carolinas (DUK) | 3.7 GWh | Jul 1985 | Dec 2024 | Water |
| Coogee Solar | Coogee Solar, LLC | Grantsboro, NC | Duke Energy Progress East (CPLE) | 11.4 GWh | Nov 2021 | Dec 2024 | Solar |
| Cool Springs Solar (Hybrid) | Cool Springs Solar, LLC | Bainbridge, GA | Southern Company Services, Inc. - Trans (SOCO) | 512.5 GWh | Nov 2021 | Feb 2026 | Solar |
| Pitkin County Solar | Coolangatta Solar LLC | Aspen, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 9.3 GWh | Sep 2021 | Dec 2024 | Solar |
| Coolidge Solar 1, LLC | Coolidge Solar I, LLC | Ludlow, VT | ISO New England (ISNE) | 24.0 GWh | Nov 2018 | Feb 2026 | Solar |
| Cooper Farms VW Project | Cooper Hatchery Inc. | Van Wert, OH | PJM Interconnection, LLC (PJM) | 12.8 GWh | Feb 2012 | Dec 2024 | Wind |
| Sylvarena | Cooperative Energy | Raleigh, MS | Midcontinent Independent System Operator, Inc. (MISO) | 294.3 GWh | Jun 2003 | Dec 2024 | Natural Gas |
| Silver Creek | Cooperative Energy | Prentiss, MS | Midcontinent Independent System Operator, Inc. (MISO) | 427.7 GWh | May 2003 | Dec 2024 | Natural Gas |
| R D Morrow | Cooperative Energy | Purvis, MS | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 TWh | Mar 1978 | Feb 2026 | Natural Gas |
| Batesville Generation Facility | Cooperative Energy | Batesville, MS | Tennessee Valley Authority (TVA) | 5.1 TWh | Jul 2000 | Feb 2026 | Natural Gas |
| Benndale | Cooperative Energy | Benndale, MS | Midcontinent Independent System Operator, Inc. (MISO) | 51.6 GWh | Sep 1969 | Dec 2024 | Natural Gas |
| Moselle | Cooperative Energy | Moselle, MS | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 TWh | Jul 1970 | Feb 2026 | Natural Gas |
| Harquahala Sun Solar Project | Copia Power | Tonopah, AZ | Arizona Public Service Company (AZPS) | 374.3 GWh | - | Feb 2026 | Solar |
| Harquahala 2 | Copia Power | Tonopah, AZ | Arizona Public Service Company (AZPS) | 750.4 GWh | - | Feb 2026 | Solar |
| Solomon Gulch | Copper Valley Elec Assn, Inc | Valdez, AK | 43.2 GWh | Dec 1981 | Dec 2024 | Water | |
| Allison Creek Hydro | Copper Valley Elec Assn, Inc | Valdez, AK | 18.5 GWh | Sep 2016 | Dec 2024 | Water | |
| Glennallen | Copper Valley Elec Assn, Inc | Glennallen, AK | 6.5 GWh | Mar 1963 | Dec 2024 | Distillate Fuel Oil | |
| Valdez | Copper Valley Elec Assn, Inc | Valdez, AK | 4.2 GWh | Dec 1966 | Dec 2024 | Distillate Fuel Oil | |
| Valdez Cogen | Copper Valley Elec Assn, Inc | Valdez, AK | 22.5 GWh | Mar 2000 | Dec 2024 | Waste/Other Oil | |
| Brookfield Tehachapi 1 | Coram California Development, L.P. | Mojave, CA | California Independent System Operator (CISO) | 276.9 GWh | Feb 2012 | Dec 2024 | Wind |
| Corazon Energy LLC | Corazon Energy LLC | Rachito Las Lomas, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 380.1 GWh | Jul 2021 | Feb 2026 | Solar |
| Power Creek | Cordova Electric Coop, Inc | Cordova, AK | 16.7 GWh | Oct 2001 | Dec 2024 | Water | |
| Humpback Creek | Cordova Electric Coop, Inc | Cordova, AK | 2.0 GWh | May 1991 | Dec 2024 | Water | |
| Orca | Cordova Electric Coop, Inc | Cordova, AK | 4.2 GWh | Sep 1984 | Dec 2024 | Distillate Fuel Oil | |
| Cordova Energy | Cordova Energy Co LLC | Cordova, IL | PJM Interconnection, LLC (PJM) | 1.2 TWh | May 2001 | Dec 2024 | Natural Gas |
| Corewell Health Dearborn Campus | Corewell Health Dearborn Campus | Dearborn, MI | Midcontinent Independent System Operator, Inc. (MISO) | 30.0 MWh | Dec 1978 | Dec 2023 | Distillate Fuel Oil |
| Cleveland Thermal | Corix Cleveland Thermal Generating LP | Cleveland, OH | PJM Interconnection, LLC (PJM) | 2.2 GWh | Jan 2017 | Dec 2024 | Natural Gas |
| Cork Oak Solar | Cork Oak Solar, LLC | Halifax, NC | PJM Interconnection, LLC (PJM) | 38.3 GWh | Nov 2017 | Dec 2024 | Solar |
| OR -Solops - SPI 18 - Cork | Cork Solar, LLC | Molalla, OR | Portland General Electric Company (PGE) | 361.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Earl F Wisdom | Corn Belt Power Coop | Spencer, IA | Southwest Power Pool (SWPP) | 7.1 GWh | Mar 1960 | Dec 2024 | Natural Gas : 95.6% Distillate Fuel Oil : 4.4% |
| Cornell Hydro | Cornell Hydro | Ithaca, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Nov 1981 | Feb 2026 | Water |
| Cornell University Central Heat | Cornell University | Ithaca, NY | New York Independent System Operator (NYIS) | 222.4 GWh | Jun 1988 | Dec 2024 | Natural Gas : 99.9% |
| Cornillie 2 Community (CSG) | Cornillie 2 Community Solar LLC | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2020 | Dec 2024 | Solar |
| Corning Riverview (CSG) | Corning Riverview Project | Tonawanda, NY | New York Independent System Operator (NYIS) | 7.3 GWh | Nov 2020 | Dec 2024 | Solar |
| Corpus Christi Energy Center | Corpus Christi Cogeneration LLC | Corpus Christi, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 2.0 TWh | Sep 2002 | Feb 2026 | Natural Gas |
| Cortland | Cortland Solar 2 LLC | Cortland, IL | PJM Interconnection, LLC (PJM) | 4.3 GWh | Apr 2021 | Dec 2024 | Solar |
| Corvus Community Solar | Corvus Community Solar | Mankato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.1 GWh | Sep 2018 | Dec 2024 | Solar |
| CoServ Community Solar Station | CoServ Electric | Aubrey, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.6 GWh | May 2015 | Dec 2024 | Solar |
| Coso Finance Partners | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 371.6 GWh | Jun 1987 | Feb 2026 | Geothermal |
| Coso Power Developers | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 310.8 GWh | Oct 1989 | Feb 2026 | Geothermal |
| Coso Energy Developers | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 244.2 GWh | Nov 1988 | Dec 2024 | Geothermal |
| Cosper Creek Solar (CSG) | Cosper Creek Solar, LLC | Willamina, OR | Portland General Electric Company (PGE) | 3.8 GWh | Nov 2022 | Dec 2024 | Solar |
| Tracy 210 | Costco Wholesale | Tracy, CA | California Independent System Operator (CISO) | 21.2 GWh | Feb 2019 | Dec 2024 | Natural Gas |
| Mira Loma | Costco Wholesale | Mira Loma, CA | California Independent System Operator (CISO) | 1.9 GWh | Oct 2011 | Dec 2024 | Solar |
| Bay View Backup Power Facility | COT/Division of Water Reclamation | Toledo, OH | PJM Interconnection, LLC (PJM) | 629.0 MWh | Dec 2006 | Dec 2024 | Distillate Fuel Oil : 99.1% Natural Gas : 0.9% |
| LSP-Cottage Grove LP | Cottage Grove Operating Services LLC | Cottage Grove, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 TWh | Sep 1997 | Dec 2024 | Natural Gas |
| Cotton Plains Wind Farm | Cotton Plains Wind I, LLC | Floydada, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 187.5 GWh | Feb 2017 | Feb 2026 | Wind |
| Cottonwood Wind Energy Center | Cottonwood Wind Project | Blue Hill, NE | Southwest Power Pool (SWPP) | 366.6 GWh | Oct 2017 | Feb 2026 | Wind |
| Cougar Solar, LLC | Cougar Solar, LLC | Sanford, NC | Duke Energy Progress East (CPLE) | 3.3 GWh | Nov 2017 | Dec 2024 | Solar |
| Santa Rita Jail Hybrid | County of Alameda GSA | Dublin, CA | California Independent System Operator (CISO) | 13.1 GWh | Aug 2001 | Dec 2023 | Natural Gas : 80.9% Solar : 19.1% |
| Laredo Detention Facility - Solar 2, 3 | County of Kern | Bakersfield, CA | California Independent System Operator (CISO) | 5.1 GWh | Oct 2021 | Dec 2024 | Solar |
| Santa Barbara ReSource Center | County of Santa Barbara | Goleta, CA | California Independent System Operator (CISO) | 5.4 GWh | May 2022 | Dec 2024 | Other Biomass Gas |
| Malech Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 4.8 GWh | Sep 2017 | Dec 2024 | Solar |
| Hellyer Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 3.6 GWh | Jul 2017 | Dec 2023 | Solar |
| Guadalupe Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2018 | Dec 2024 | Solar |
| Sonoma Central Landfill Phase II | County of Sonoma Dept of Trnsp | Petaluma, CA | California Independent System Operator (CISO) | 5.0 GWh | May 1996 | Dec 2024 | Landfill Gas |
| Sonoma Central Landfill Phase I | County of Sonoma Dept of Trnsp | Petaluma, CA | California Independent System Operator (CISO) | 5.6 GWh | Jun 1993 | Dec 2024 | Landfill Gas |
| Covanta Alexandria/Arlington Energy | Covanta Alexandria/Arlington | Alexandria, VA | PJM Interconnection, LLC (PJM) | 146.8 GWh | Sep 1987 | Feb 2026 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Covanta Bristol Energy | Covanta Bristol Inc | Bristol, CT | ISO New England (ISNE) | 109.9 GWh | Nov 1987 | Feb 2026 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Camden Resource Recovery Facility | Covanta Camden Energy Recovery Center | Camden, NJ | PJM Interconnection, LLC (PJM) | 158.7 GWh | Feb 1991 | Feb 2026 | Non-biogenic Municipal Solid Waste : 53.7% Biogenic Municipal Solid Waste : 43.9% Natural Gas : 2.3% |
| Covanta Delaware Valley | Covanta Delaware Valley LP | Chester, PA | PJM Interconnection, LLC (PJM) | 551.8 GWh | Mar 1991 | Feb 2026 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Covanta Hennepin Energy | Covanta Energy Co | Minneapolis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 169.5 GWh | Sep 1989 | Feb 2026 | Non-biogenic Municipal Solid Waste : 54.5% Biogenic Municipal Solid Waste : 44.6% Natural Gas : 0.8% |
| Covanta Essex Company | Covanta Essex Company | Newark, NJ | PJM Interconnection, LLC (PJM) | 477.0 GWh | Oct 1990 | Feb 2026 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Covanta Fairfax Energy | Covanta Fairfax Inc | Lorton, VA | PJM Interconnection, LLC (PJM) | 696.0 GWh | Feb 1990 | Feb 2026 | Non-biogenic Municipal Solid Waste : 54.3% Biogenic Municipal Solid Waste : 44.4% Natural Gas : 1.3% |
| Covanta Hempstead | Covanta Hempstead Company | Westbury, NY | New York Independent System Operator (NYIS) | 587.3 GWh | Mar 1989 | Feb 2026 | Non-biogenic Municipal Solid Waste : 54.8% Biogenic Municipal Solid Waste : 44.9% |
| H Power | Covanta Honolulu Resource Recovery | Kapolei, HI | 290.6 GWh | Oct 1989 | Feb 2026 | Non-biogenic Municipal Solid Waste : 54.2% Biogenic Municipal Solid Waste : 44.4% Distillate Fuel Oil : 1.4% | |
| Covanta Lake County Energy | Covanta Lake Inc | Okahumpka, FL | Duke Energy Florida, Inc. (FPC) | 86.9 GWh | Aug 1990 | Feb 2026 | Non-biogenic Municipal Solid Waste : 54.6% Biogenic Municipal Solid Waste : 44.7% Natural Gas : 0.7% |
| Lancaster County Resource Recovery | Covanta Lancaster Inc | Brainbridge, PA | PJM Interconnection, LLC (PJM) | 178.5 GWh | Nov 1990 | Feb 2026 | Non-biogenic Municipal Solid Waste : 54.9% Biogenic Municipal Solid Waste : 44.9% |
| Covanta Marion Inc | Covanta Marion Inc | Brooks, OR | Portland General Electric Company (PGE) | 53.0 GWh | Jul 1986 | Dec 2024 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Montgomery County Resource Recovery | Covanta Montgomery, Inc. | Dickerson, MD | PJM Interconnection, LLC (PJM) | 234.7 GWh | Apr 1995 | Feb 2026 | Non-biogenic Municipal Solid Waste : 54.4% Biogenic Municipal Solid Waste : 44.5% Natural Gas : 1.1% |
| Onondaga County Resource Recovery | Covanta Onondega LP | Jamesville, NY | New York Independent System Operator (NYIS) | 176.6 GWh | Oct 1994 | Feb 2026 | Non-biogenic Municipal Solid Waste : 53.8% Biogenic Municipal Solid Waste : 44.0% Natural Gas : 2.3% |
| Covanta Southeastern Connecticut Company | Covanta Southeastern Connecticut Company | Preston, CT | ISO New England (ISNE) | 113.4 GWh | Nov 1991 | Feb 2026 | Non-biogenic Municipal Solid Waste : 53.9% Biogenic Municipal Solid Waste : 44.1% Distillate Fuel Oil : 1.9% |
| Covanta Stanislaus Energy | Covanta Stanislaus Inc | Crows Landing, CA | California Independent System Operator (CISO) | 61.9 GWh | Aug 1988 | Dec 2024 | Non-biogenic Municipal Solid Waste : 50.0% Biogenic Municipal Solid Waste : 40.9% Distillate Fuel Oil : 9.1% |
| Cove Mountain Solar 2 | Cove Mountain Solar 2 LLC | Beryl, UT | PacifiCorp East (PACE) | 320.3 GWh | Sep 2020 | Feb 2026 | Solar |
| Cove Mountain Solar | Cove Mountain Solar LLC | Beryl, UT | PacifiCorp East (PACE) | 157.7 GWh | Oct 2020 | Feb 2026 | Solar |
| Coventry Photovoltaic, LLC | Coventry Photovoltaic, LLC | Coventry, VT | ISO New England (ISNE) | 2.2 GWh | Jul 2014 | Dec 2024 | Solar |
| Cow Branch | Cow Branch Wind Power, LLC | Tarkio, MO | Associated Electric Cooperative, Inc. (AECI) | 158.1 GWh | Mar 2008 | Feb 2026 | Wind |
| Cox Waste to Energy | Cox Companies, LLC | Campbellsville, KY | PJM Interconnection, LLC (PJM) | 9.7 GWh | Dec 1994 | Dec 2024 | Wood/Wood Waste Solids |
| Manheim New England | Cox Enterprises | North Dighton, MA | ISO New England (ISNE) | 2.4 GWh | Nov 2012 | Dec 2024 | Solar |
| Manheim New Jersey | Cox Enterprises | Bordentown, NJ | PJM Interconnection, LLC (PJM) | 3.6 GWh | May 2009 | Dec 2024 | Solar |
| New River Clean Energy | Cox Enterprises | Beckley, WV | PJM Interconnection, LLC (PJM) | 7.6 GWh | Jan 2017 | Dec 2024 | Landfill Gas |
| Coyote Ridge | Coyote Ridge LLC | White, SD | Western Area Power Administration - Rocky Mountain Region (WACM) | 382.9 GWh | Nov 2019 | Feb 2026 | Wind |
| Bloom Wind | CP Bloom Wind LLC | Minneola, KS | Southwest Power Pool (SWPP) | 598.0 GWh | May 2017 | Feb 2026 | Wind |
| CP Kelco San Diego Plant | CP Kelco US Inc. | San Diego, CA | California Independent System Operator (CISO) | 74.5 GWh | Sep 1983 | Feb 2026 | Natural Gas |
| CPV Backbone Solar | CPV Backbone Solar, LLC | Swanton, MD | PJM Interconnection, LLC (PJM) | 31.1 GWh | - | Feb 2026 | Solar |
| Beaver Ridge Wind | CPV Beaver Ridge Wind LLC | Freedom, ME | ISO New England (ISNE) | 10.4 GWh | Oct 2008 | Dec 2024 | Wind |
| Canton Mountain Wind | CPV Canton Mountain Wind LLC | Canton, ME | ISO New England (ISNE) | 50.5 GWh | Oct 2017 | Dec 2024 | Wind |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 184 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,677 | 13,090.02 GWh |
| Colorado | # 31 | 294 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 290 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 268 | 9,944.77 GWh |
| Minnesota | # 28 | 763 | 4,707.75 GWh |
| Mississippi | # 23 | 56 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 124 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 949 | 10,653.43 GWh |
| North Carolina | # 7 | 903 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 141 | 6,415.64 GWh |
| Oregon | # 21 | 270 | 6,135.97 GWh |
| Pennsylvania | # 2 | 251 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 236 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 239 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |