Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| New Covert Generating Facility | Consumers Energy Co - (MI) | Covert, MI | PJM Interconnection, LLC (PJM) | 6.9 TWh | Feb 2004 | Aug 2026 | Natural Gas |
| Zeeland Generating Station | Consumers Energy Co - (MI) | Zeeland, MI | Midcontinent Independent System Operator, Inc. (MISO) | 6.2 TWh | May 2001 | Aug 2026 | Natural Gas |
| Cross Winds Energy Park | Consumers Energy Co - (MI) | Unionville, MI | Midcontinent Independent System Operator, Inc. (MISO) | 728.2 GWh | Nov 2014 | Dec 2025 | Wind |
| Grand Valley Solar Gardens | Consumers Energy Co - (MI) | Allendale, MI | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Mar 2016 | Aug 2026 | Solar |
| Western Michigan Solar Gardens | Consumers Energy Co - (MI) | Kalamazoo, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Jul 2016 | Aug 2026 | Solar |
| Bissell Solar and Battery Generator | Consumers Energy Co - (MI) | Grand Rapids, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 GWh | Aug 2021 | Dec 2025 | Solar |
| Crescent Wind Park | Consumers Energy Co - (MI) | Hillsdale, MI | Midcontinent Independent System Operator, Inc. (MISO) | 365.7 GWh | Jan 2021 | Aug 2026 | Wind |
| Gratiot Farms Wind Project | Consumers Energy Co - (MI) | Carson City, MI | Midcontinent Independent System Operator, Inc. (MISO) | 334.1 GWh | Nov 2020 | Aug 2026 | Wind |
| Muskegon Solar | Consumers Energy Co - (MI) | Muskegon, MI | Midcontinent Independent System Operator, Inc. (MISO) | 205.0 GWh | - | Aug 2026 | Solar |
| Heartland Farms | Consumers Energy Co - (MI) | Middleton, MI | Midcontinent Independent System Operator, Inc. (MISO) | 464.8 GWh | Mar 2024 | Aug 2026 | Wind |
| Elk Basin Gasoline Plant | Contango Oil and Gas | Powell, WY | PacifiCorp East (PACE) | 6.3 GWh | Dec 1947 | Dec 2025 | Other Gas |
| Black Hollow Sun | Contour Global | Auit, CO | Public Service Company of Colorado (PSCO) | 403.1 GWh | Sep 2025 | Aug 2026 | Solar |
| Federalsburg Energy Storage 1 LLC | Convergent Energy and Power LP | Federaslburg, MD | PJM Interconnection, LLC (PJM) | 1.2 GWh | Oct 2021 | Dec 2025 | Solar |
| Cicero Energy Storage 2 LLC | Convergent Energy and Power LP | East Syracuse, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Feb 2022 | Dec 2025 | Solar |
| Cicero Energy Storage 1 LLC | Convergent Energy and Power LP | East Syracuse, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Feb 2022 | Dec 2025 | Solar |
| Clifton Dam 3 Power Station | Converse Energy Inc | Converse, SC | Duke Energy Carolinas (DUK) | 3.7 GWh | Jul 1985 | Dec 2024 | Water |
| Cooks Mill PV I | Cooks Mill PV I, LLC | Matoon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 115.9 GWh | - | Aug 2026 | Solar |
| Cool Springs Solar (Hybrid) | Cool Springs Solar, LLC | Bainbridge, GA | Southern Company Services, Inc. - Trans (SOCO) | 504.9 GWh | Nov 2021 | Aug 2026 | Solar |
| Pitkin County Solar | Coolangatta Solar LLC | Aspen, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 11.1 GWh | Sep 2021 | Dec 2025 | Solar |
| Coolidge Solar 1, LLC | Coolidge Solar I, LLC | Ludlow, VT | ISO New England (ISNE) | 26.1 GWh | Nov 2018 | Aug 2026 | Solar |
| Cooper Farms VW Project | Cooper Hatchery Inc. | Van Wert, OH | PJM Interconnection, LLC (PJM) | 12.8 GWh | Feb 2012 | Dec 2024 | Wind |
| Batesville Generation Facility | Cooperative Energy | Batesville, MS | Tennessee Valley Authority (TVA) | 5.1 TWh | Jul 2000 | Aug 2026 | Natural Gas |
| R D Morrow | Cooperative Energy | Purvis, MS | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 TWh | Mar 1978 | Aug 2026 | Natural Gas |
| Benndale | Cooperative Energy | Benndale, MS | Midcontinent Independent System Operator, Inc. (MISO) | 49.2 GWh | Sep 1969 | Dec 2025 | Natural Gas |
| Moselle | Cooperative Energy | Moselle, MS | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 TWh | Jul 1970 | Aug 2026 | Natural Gas |
| Silver Creek | Cooperative Energy | Prentiss, MS | Midcontinent Independent System Operator, Inc. (MISO) | 282.3 GWh | May 2003 | Dec 2025 | Natural Gas |
| Sylvarena | Cooperative Energy | Raleigh, MS | Midcontinent Independent System Operator, Inc. (MISO) | 262.1 GWh | Jun 2003 | Dec 2025 | Natural Gas |
| Centennial Flats | Copia Power | Salome, AZ | Arizona Public Service Company (AZPS) | 152.0 GWh | - | Aug 2026 | Solar |
| Harquahala 2 | Copia Power | Tonopah, AZ | Arizona Public Service Company (AZPS) | 826.9 GWh | Mar 2025 | Aug 2026 | Solar |
| Harquahala Sun Solar Project | Copia Power | Tonopah, AZ | Arizona Public Service Company (AZPS) | 454.9 GWh | Mar 2025 | Aug 2026 | Solar |
| Valdez Cogen | Copper Valley Elec Assn, Inc | Valdez, AK | 23.4 GWh | Mar 2000 | Dec 2025 | Waste/Other Oil | |
| Glennallen | Copper Valley Elec Assn, Inc | Glennallen, AK | 6.5 GWh | Mar 1963 | Dec 2025 | Distillate Fuel Oil | |
| Valdez | Copper Valley Elec Assn, Inc | Valdez, AK | 892.0 MWh | Dec 1966 | Dec 2025 | Distillate Fuel Oil | |
| Solomon Gulch | Copper Valley Elec Assn, Inc | Valdez, AK | 41.8 GWh | Dec 1981 | Dec 2025 | Water | |
| Allison Creek Hydro | Copper Valley Elec Assn, Inc | Valdez, AK | 22.9 GWh | Sep 2016 | Dec 2025 | Water | |
| Brookfield Tehachapi 1 | Coram California Development, L.P. | Mojave, CA | California Independent System Operator (CISO) | 164.5 GWh | Feb 2012 | Dec 2025 | Wind |
| Corazon Energy LLC | Corazon Energy LLC | Rachito Las Lomas, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 382.5 GWh | Jul 2021 | Aug 2026 | Solar |
| Central CA Fuel Cell 1, LLC | Cordia | Tulare, CA | California Independent System Operator (CISO) | 13.2 GWh | Apr 2018 | Dec 2025 | Natural Gas |
| Power Creek | Cordova Electric Coop, Inc | Cordova, AK | 21.8 GWh | Oct 2001 | Dec 2025 | Water | |
| Orca | Cordova Electric Coop, Inc | Cordova, AK | 4.3 GWh | Sep 1984 | Dec 2025 | Distillate Fuel Oil | |
| Humpback Creek | Cordova Electric Coop, Inc | Cordova, AK | 1.2 GWh | May 1991 | Dec 2025 | Water | |
| Cordova Energy | Cordova Energy Co LLC | Cordova, IL | PJM Interconnection, LLC (PJM) | 1.1 TWh | May 2001 | Dec 2025 | Natural Gas |
| Corewell Health Dearborn Campus | Corewell Health Dearborn Campus | Dearborn, MI | Midcontinent Independent System Operator, Inc. (MISO) | 42.0 MWh | Dec 1978 | Dec 2025 | Distillate Fuel Oil |
| Cleveland Thermal | Corix Cleveland Thermal Generating LP | Cleveland, OH | PJM Interconnection, LLC (PJM) | 1.2 GWh | Jan 2017 | Dec 2025 | Natural Gas |
| Cork Oak Solar | Cork Oak Solar, LLC | Halifax, NC | PJM Interconnection, LLC (PJM) | 38.2 GWh | Nov 2017 | Dec 2025 | Solar |
| OR -Solops - SPI 18 - Cork | Cork Solar, LLC | Molalla, OR | Portland General Electric Company (PGE) | 2.4 GWh | Nov 2024 | Dec 2025 | Solar |
| Earl F Wisdom | Corn Belt Power Coop | Spencer, IA | Southwest Power Pool (SWPP) | 4.1 GWh | Mar 1960 | Dec 2025 | Natural Gas : 98.9% |
| Cornell Hydro | Cornell Renewable | Ithaca, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Nov 1981 | Aug 2026 | Water |
| Cornell University Central Heat | Cornell University - CHP | Ithaca, NY | New York Independent System Operator (NYIS) | 229.8 GWh | Jun 1988 | Dec 2025 | Natural Gas |
| Corpus Christi Energy Center | Corpus Christi Cogeneration LLC | Corpus Christi, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 2.0 TWh | Sep 2002 | Aug 2026 | Natural Gas |
| Cortland | Cortland Solar 2 LLC | Cortland, IL | PJM Interconnection, LLC (PJM) | 4.3 GWh | Apr 2021 | Dec 2025 | Solar |
| Corvus Community Solar | Corvus Community Solar | Mankato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.2 GWh | Sep 2018 | Dec 2025 | Solar |
| CoServ Community Solar Station | CoServ Electric | Aubrey, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.5 GWh | May 2015 | Apr 2025 | Solar |
| Coso Energy Developers | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 235.0 GWh | Nov 1988 | Dec 2025 | Geothermal |
| Coso Power Developers | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 313.5 GWh | Oct 1989 | Aug 2026 | Geothermal |
| Coso Finance Partners | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 353.4 GWh | Jun 1987 | Aug 2026 | Geothermal |
| Cosper Creek Solar (CSG) | Cosper Creek Solar, LLC | Willamina, OR | Portland General Electric Company (PGE) | 3.8 GWh | Nov 2022 | Dec 2025 | Solar |
| Tracy 210 | Costco Wholesale | Tracy, CA | California Independent System Operator (CISO) | 20.6 GWh | Feb 2019 | Dec 2025 | Natural Gas |
| Mira Loma | Costco Wholesale | Mira Loma, CA | California Independent System Operator (CISO) | 2.2 GWh | Oct 2011 | Dec 2025 | Solar |
| Costen Solar | Costen Solar LLC | Pocomoke City, MD | PJM Interconnection, LLC (PJM) | 17.0 GWh | Jul 2024 | Dec 2025 | Solar |
| Bay View Backup Power Facility | COT/Division of Water Reclamation | Toledo, OH | PJM Interconnection, LLC (PJM) | 475.0 MWh | Dec 2006 | Dec 2025 | Natural Gas : 97.1% Distillate Fuel Oil : 2.9% |
| LSP-Cottage Grove LP | Cottage Grove Operating Services LLC | Cottage Grove, MN | Midcontinent Independent System Operator, Inc. (MISO) | 549.4 GWh | Sep 1997 | Dec 2025 | Natural Gas |
| Cotton Plains Wind Farm | Cotton Plains Wind I, LLC | Floydada, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 193.6 GWh | Feb 2017 | Aug 2026 | Wind |
| Cottonwood Bayou Solar | Cottonwood Bayou Solar, LLC | Liverpool, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 765.3 GWh | - | Aug 2026 | Solar |
| Cottonwood Energy Company LP | Cottonwood Energy Company LP | Deweyville, TX | Midcontinent Independent System Operator, Inc. (MISO) | 5.8 TWh | Jun 2003 | Aug 2026 | Natural Gas |
| Cottonwood Wind Energy Center | Cottonwood Wind Project | Blue Hill, NE | Southwest Power Pool (SWPP) | 384.2 GWh | Oct 2017 | Aug 2026 | Wind |
| Cougar Solar, LLC | Cougar Solar, LLC | Sanford, NC | Duke Energy Progress East (CPLE) | 3.2 GWh | Nov 2017 | Dec 2025 | Solar |
| Santa Rita Jail Hybrid | County of Alameda GSA - (CA) | Dublin, CA | California Independent System Operator (CISO) | 10.4 GWh | Aug 2001 | Dec 2025 | Natural Gas : 77.7% Solar : 22.3% |
| Lerdo Detention Facility - Solar 2, 3 | County of Kern - (CA) | Bakersfield, CA | California Independent System Operator (CISO) | 2.0 GWh | Oct 2021 | Dec 2025 | Solar |
| Santa Barbara ReSource Center | County of Santa Barbara - (CA) | Goleta, CA | California Independent System Operator (CISO) | 8.7 GWh | May 2021 | Dec 2025 | Other Biomass Gas |
| Hellyer Solar Farm | County of Santa Clara - (CA) | San Jose, CA | California Independent System Operator (CISO) | 241.0 MWh | Jul 2017 | Dec 2025 | Solar |
| Guadalupe Solar Farm | County of Santa Clara - (CA) | San Jose, CA | California Independent System Operator (CISO) | 1.4 GWh | Aug 2018 | Dec 2025 | Solar |
| Malech Solar Farm | County of Santa Clara - (CA) | San Jose, CA | California Independent System Operator (CISO) | 4.6 GWh | Sep 2017 | Dec 2025 | Solar |
| Sonoma Central Landfill Phase II | County of Sonoma Dept of Trnsp | Petaluma, CA | California Independent System Operator (CISO) | 1.8 GWh | May 1996 | Dec 2025 | Landfill Gas |
| Sonoma Central Landfill Phase I | County of Sonoma Dept of Trnsp | Petaluma, CA | California Independent System Operator (CISO) | 583.0 MWh | Jun 1993 | Dec 2025 | Landfill Gas |
| Covanta Alexandria/Arlington Energy | Covanta Alexandria/Arlington | Alexandria, VA | PJM Interconnection, LLC (PJM) | 145.5 GWh | Sep 1987 | Aug 2026 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Covanta Bristol Energy | Covanta Bristol Inc | Bristol, CT | ISO New England (ISNE) | 107.5 GWh | Nov 1987 | Aug 2026 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Camden Resource Recovery Facility | Covanta Camden Energy Recovery Center | Camden, NJ | PJM Interconnection, LLC (PJM) | 158.2 GWh | Feb 1991 | Aug 2026 | Non-biogenic Municipal Solid Waste : 52.4% Biogenic Municipal Solid Waste : 42.9% Natural Gas : 4.5% |
| Covanta Delaware Valley | Covanta Delaware Valley LP | Chester, PA | PJM Interconnection, LLC (PJM) | 570.0 GWh | Mar 1991 | Aug 2026 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Covanta Hennepin Energy | Covanta Energy Co | Minneapolis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 216.1 GWh | Sep 1989 | Aug 2026 | Non-biogenic Municipal Solid Waste : 54.6% Biogenic Municipal Solid Waste : 44.7% Natural Gas : 0.8% |
| Covanta Essex Company | Covanta Essex Company | Newark, NJ | PJM Interconnection, LLC (PJM) | 471.9 GWh | Oct 1990 | Aug 2026 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Covanta Fairfax Energy | Covanta Fairfax Inc | Lorton, VA | PJM Interconnection, LLC (PJM) | 653.3 GWh | Feb 1990 | Aug 2026 | Non-biogenic Municipal Solid Waste : 54.1% Biogenic Municipal Solid Waste : 44.3% Natural Gas : 1.7% |
| Covanta Hempstead | Covanta Hempstead Company | Westbury, NY | New York Independent System Operator (NYIS) | 461.7 GWh | Mar 1989 | Aug 2026 | Non-biogenic Municipal Solid Waste : 54.7% Biogenic Municipal Solid Waste : 44.8% |
| H Power | Covanta Honolulu Resource Recovery | Kapolei, HI | 272.6 GWh | Oct 1989 | Aug 2026 | Non-biogenic Municipal Solid Waste : 53.7% Biogenic Municipal Solid Waste : 44.0% Distillate Fuel Oil : 2.3% | |
| Covanta Lake County Energy | Covanta Lake Inc | Okahumpka, FL | Duke Energy Florida, Inc. (FPC) | 84.7 GWh | Aug 1990 | Aug 2026 | Non-biogenic Municipal Solid Waste : 54.6% Biogenic Municipal Solid Waste : 44.6% Natural Gas : 0.8% |
| Lancaster County Resource Recovery | Covanta Lancaster Inc | Brainbridge, PA | PJM Interconnection, LLC (PJM) | 172.9 GWh | Nov 1990 | Aug 2026 | Non-biogenic Municipal Solid Waste : 54.8% Biogenic Municipal Solid Waste : 44.9% |
| Covanta Marion Inc | Covanta Marion Inc | Brooks, OR | Portland General Electric Company (PGE) | 53.0 GWh | Jul 1986 | Dec 2024 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Montgomery County Resource Recovery | Covanta Montgomery, Inc. | Dickerson, MD | PJM Interconnection, LLC (PJM) | 234.7 GWh | Apr 1995 | Aug 2026 | Non-biogenic Municipal Solid Waste : 53.7% Biogenic Municipal Solid Waste : 44.0% Natural Gas : 2.3% |
| Onondaga County Resource Recovery | Covanta Onondega LP | Jamesville, NY | New York Independent System Operator (NYIS) | 182.3 GWh | Oct 1994 | Aug 2026 | Non-biogenic Municipal Solid Waste : 53.9% Biogenic Municipal Solid Waste : 44.1% Natural Gas : 2.1% |
| Covanta Southeastern Connecticut Company | Covanta Southeastern Connecticut Company | Preston, CT | ISO New England (ISNE) | 106.2 GWh | Nov 1991 | Aug 2026 | Non-biogenic Municipal Solid Waste : 53.9% Biogenic Municipal Solid Waste : 44.1% Distillate Fuel Oil : 2.0% |
| Covanta Stanislaus Energy | Covanta Stanislaus Inc | Crows Landing, CA | California Independent System Operator (CISO) | 61.9 GWh | Aug 1988 | Dec 2024 | Non-biogenic Municipal Solid Waste : 50.0% Biogenic Municipal Solid Waste : 40.9% Distillate Fuel Oil : 9.1% |
| Cove Mountain Solar 2 | Cove Mountain Solar 2 LLC | Beryl, UT | PacifiCorp East (PACE) | 332.1 GWh | Sep 2020 | Aug 2026 | Solar |
| Cove Mountain Solar | Cove Mountain Solar LLC | Beryl, UT | PacifiCorp East (PACE) | 160.7 GWh | Oct 2020 | Aug 2026 | Solar |
| Coventry Photovoltaic, LLC | Coventry Photovoltaic, LLC | Coventry, VT | ISO New England (ISNE) | 2.7 GWh | Jul 2014 | Dec 2025 | Solar |
| Cow Branch | Cow Branch Wind Power, LLC | Tarkio, MO | Associated Electric Cooperative, Inc. (AECI) | 171.5 GWh | Mar 2008 | Aug 2026 | Wind |
| Cox Waste to Energy | Cox Companies, LLC | Campbellsville, KY | PJM Interconnection, LLC (PJM) | 9.6 GWh | Dec 1994 | Dec 2025 | Wood/Wood Waste Solids |
| Manheim New Jersey | Cox Enterprises | Bordentown, NJ | PJM Interconnection, LLC (PJM) | 3.3 GWh | May 2009 | Dec 2025 | Solar |
| New River Clean Energy | Cox Enterprises | Beckley, WV | PJM Interconnection, LLC (PJM) | 6.8 GWh | Jan 2017 | Dec 2025 | Landfill Gas |
| Manheim New England | Cox Enterprises | North Dighton, MA | ISO New England (ISNE) | 2.5 GWh | Nov 2012 | Dec 2025 | Solar |
| Coyote Ridge | Coyote Ridge LLC | White, SD | Western Area Power Administration - Rocky Mountain Region (WACM) | 370.9 GWh | Nov 2019 | Aug 2026 | Wind |
Summary of Power Plants By State
Figures are based on August 2026 generation numbers.| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 80 | 13,897.78 GWh |
| Alaska | # 48 | 146 | 672.99 GWh |
| Arizona | # 10 | 203 | 13,589.64 GWh |
| Arkansas | # 23 | 122 | 7,027.75 GWh |
| California | # 3 | 1,840 | 24,164.86 GWh |
| Colorado | # 30 | 321 | 5,322.30 GWh |
| Connecticut | # 34 | 180 | 4,400.98 GWh |
| Delaware | # 49 | 35 | 555.40 GWh |
| District of Columbia | # 51 | 19 | 21.71 GWh |
| Florida | # 2 | 345 | 28,185.93 GWh |
| Georgia | # 6 | 261 | 15,282.60 GWh |
| Hawaii | # 47 | 73 | 863.62 GWh |
| Idaho | # 43 | 152 | 1,754.56 GWh |
| Illinois | # 5 | 556 | 18,683.36 GWh |
| Indiana | # 17 | 226 | 9,970.06 GWh |
| Iowa | # 27 | 301 | 5,759.64 GWh |
| Kansas | # 26 | 191 | 6,368.18 GWh |
| Kentucky | # 21 | 63 | 7,221.26 GWh |
| Louisiana | # 14 | 93 | 10,670.45 GWh |
| Maine | # 45 | 250 | 1,285.31 GWh |
| Maryland | # 37 | 236 | 3,745.22 GWh |
| Massachusetts | # 41 | 679 | 1,958.59 GWh |
| Michigan | # 12 | 288 | 12,064.19 GWh |
| Minnesota | # 32 | 794 | 5,047.38 GWh |
| Mississippi | # 19 | 62 | 8,358.70 GWh |
| Missouri | # 22 | 134 | 7,125.71 GWh |
| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 2,266.60 GWh |
| Nebraska | # 39 | 132 | 3,448.00 GWh |
| Nevada | # 29 | 117 | 5,523.31 GWh |
| New Hampshire | # 42 | 60 | 1,901.10 GWh |
| New Jersey | # 25 | 409 | 6,440.88 GWh |
| New Mexico | # 33 | 166 | 4,571.47 GWh |
| New York | # 11 | 1,087 | 13,130.21 GWh |
| North Carolina | # 8 | 921 | 14,263.55 GWh |
| North Dakota | # 38 | 62 | 3,579.89 GWh |
| Ohio | # 7 | 216 | 14,448.49 GWh |
| Oklahoma | # 13 | 153 | 10,965.38 GWh |
| Oregon | # 31 | 292 | 5,257.14 GWh |
| Pennsylvania | # 4 | 270 | 23,772.83 GWh |
| Rhode Island | # 46 | 108 | 924.31 GWh |
| South Carolina | # 16 | 214 | 9,989.71 GWh |
| South Dakota | # 44 | 53 | 1,486.65 GWh |
| Tennessee | # 18 | 101 | 8,430.26 GWh |
| Texas | # 1 | 1,069 | 65,726.98 GWh |
| Utah | # 36 | 131 | 4,074.82 GWh |
| Vermont | # 50 | 118 | 175.56 GWh |
| Virginia | # 15 | 255 | 10,241.54 GWh |
| Washington | # 20 | 137 | 8,189.60 GWh |
| West Virginia | # 28 | 41 | 5,593.74 GWh |
| Wisconsin | # 24 | 272 | 6,683.19 GWh |
| Wyoming | # 35 | 71 | 4,322.19 GWh |