Impact Solar 1
6795 FM 1503, Deport, TX 75435Plant Summary Information
Impact Solar 1 is ranked #73 out of 215 solar farms in Texas in terms of total annual net electricity generation.
Impact Solar 1 generated 75.1 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Impact Solar 1 |
|---|---|
| Utility Name | Lightsource Renewable Energy Asset Management, LLC |
| Location | Lamar County, TX |
| Initial Operation Date | December 2020 |
| Last Update | Dec 2025 |
| Annual Generation | 361.3 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,743 out of 12,613 Power Plants Nationwide | |
| Ranked #204 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #341 out of 816 Texas Power Plants | |
| Ranked #73 out of 215 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Impact Solar 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Impact Solar 1.
Monthly Net Generation for Impact Solar 1
Monthly Plant Fuel Consumption for Impact Solar 1
Impact Solar 1 Details
| Summary Information | |
|---|---|
| Plant Name | Impact Solar 1 (63222) |
| Plant Address | 6795 FM 1503, Deport, TX 75435 |
| Utility | Lightsource Renewable Energy Asset Management, LLC (62842) |
| Latitude, Longitude | 33.4678, -95.37086 |
| Generation Dates on File | Dec 2020 to Dec 2025 |
| Initial Operation Date | December 2020 |
| Annual Generation | 361.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG20-18-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator TXIM1 Details Operating December 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | IMP_RN1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | ERCOT-N |
| Nameplate Capacity | 198.5 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 198.5 MW |
| Winter Capacity | 198.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Other Combustion Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 260 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Impact Solar 1 Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Impact Solar 1, LLC | 400 Montgomery Street, 8th Floor, San Francisco, CA 94104 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #194 | Maverick Solar, LLC | Desert Center, CA | 369.7 GWh |
| #195 | Corazon Energy LLC | Rachito Las Lomas, TX | 369.1 GWh |
| #196 | Lund Hill Solar | Bickleton, WA | 367.3 GWh |
| #197 | Twiggs Solar | Dry Branch, GA | 366.5 GWh |
| #198 | BigBeau Solar, LLC | Rosamond, CA | 362.2 GWh |
| #199 | Markum Solar Farm | Valley Mills, TX | 364.6 GWh |
| #200 | Bright Arrow Solar, LLC | Sulphur Springs, TX | 359.1 GWh |
| #201 | Solar Gen 2 Solar Facility | Calipatria, CA | 364.2 GWh |
| #202 | Hardy Hills Solar Energy LLC | Frankfort, IN | 363.1 GWh |
| #203 | Hillcrest Solar | Mt. Orab, OH | 362.1 GWh |
| #205 | Driver Solar | Osceola, AR | 360.9 GWh |
| #206 | Aragorn Solar Project | Van Horn, TX | 358.0 GWh |
| #207 | Fairbanks Solar Project | Fairbanks, IN | 357.9 GWh |
| #208 | Camilla Solar Energy Project | Camilla, GA | 357.6 GWh |
| #209 | Buckthorn Westex | Ft. Stockton, TX | 356.6 GWh |
| #210 | Newport Solar Project | Newport, AR | 356.4 GWh |
| #211 | Copper Mountain Solar 2 | Boulder City, NV | 356.1 GWh |
| #212 | Blythe Solar IV, LLC | Blythe, CA | 346.8 GWh |
| #213 | Centinela Solar Energy | Calexico, CA | 352.7 GWh |
| #214 | Ray Ranch Solar | Pettus, TX | 352.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Impact Solar 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bright Arrow Solar, LLC | Sulphur Springs, TX | 359.1 GWh | 26.7 mi |
| Chisum | Blossom, TX | 20.7 GWh | 11.5 mi |
| Coniglio Solar | Wolfe City, TX | 205.8 GWh | 41.3 mi |
| Delilah Solar Energy II LLC | Bogota, TX | 212.8 GWh | 5.9 mi |
| Delilah Solar Energy LLC | Bogota, TX | 557.8 GWh | 17.4 mi |
| Eiffel Solar Project | Paris, TX | 573.6 GWh | 12.7 mi |
| Estonian Solar Project, LLC | Cooper, TX | 429.6 GWh | 17.1 mi |
| Hopkins Energy LLC | Dike, TX | 572.2 GWh | 18.1 mi |
| Hugo | Fort Towson, OK | 1.6 TWh | 38 mi |
| International Paper Valliant OK | Valliant, OK | 397.7 GWh | 39.4 mi |
| Lamar Power Project | Paris, TX | 6.9 TWh | 16.9 mi |
| Mockingbird Solar Center | Brookston, TX | 928.4 GWh | 6.1 mi |
| Paris Energy Center | Paris, TX | 648.0 GWh | 19.1 mi |
| Pine Forest Solar I | Pickton, TX | 29.5 GWh | 25.4 mi |
| Samson Solar Energy | Cunningham, TX | 346.7 GWh | 18.1 mi |
| Samson Solar Energy II LLC | Cunningham, TX | 302.7 GWh | 1.4 mi |
| Samson Solar Energy III LLC | Cunningham, TX | 278.0 GWh | 3 mi |
| Stampede Solar Hybrid | Saltillo, TX | 540.8 GWh | 18.7 mi |
| Tyson Nick | Paris, TX | 37.9 GWh | 19.2 mi |
| Welsh | Pittsburg, TX | 4.1 TWh | 41.9 mi |