Impact Solar 1
6795 FM 1503, Deport, TX 75435Plant Summary Information
Impact Solar 1 is ranked #74 out of 219 solar farms in Texas in terms of total annual net electricity generation.
Impact Solar 1 generated 56.7 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Impact Solar 1 |
|---|---|
| Utility Name | Lightsource Renewable Energy Asset Management, LLC |
| Location | Lamar County, TX |
| Initial Operation Date | December 2020 |
| Last Update | Feb 2026 |
| Annual Generation | 366.3 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,727 out of 12,637 Power Plants Nationwide | |
| Ranked #204 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #341 out of 820 Texas Power Plants | |
| Ranked #74 out of 219 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Impact Solar 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Impact Solar 1.
Monthly Net Generation for Impact Solar 1
Monthly Plant Fuel Consumption for Impact Solar 1
Impact Solar 1 Details
| Summary Information | |
|---|---|
| Plant Name | Impact Solar 1 (63222) |
| Plant Address | 6795 FM 1503, Deport, TX 75435 |
| Utility | Lightsource Renewable Energy Asset Management, LLC (62842) |
| Latitude, Longitude | 33.4678, -95.37086 |
| Generation Dates on File | Dec 2020 to Feb 2026 |
| Initial Operation Date | December 2020 |
| Annual Generation | 366.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG20-18-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator TXIM1 Details Operating December 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | IMP_RN1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | ERCOT-N |
| Nameplate Capacity | 198.5 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 198.5 MW |
| Winter Capacity | 198.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Other Combustion Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 260 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Impact Solar 1 Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Impact Solar 1, LLC | 400 Montgomery Street, 8th Floor, San Francisco, CA 94104 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #194 | Imperial Solar Energy Center West | Seeley, CA | 373.6 GWh |
| #195 | Castle Gap Solar Hybrid | McCarney, TX | 372.4 GWh |
| #196 | RE Roserock | Fort Stockton, TX | 372.2 GWh |
| #197 | Markum Solar Farm | Valley Mills, TX | 371.9 GWh |
| #198 | Blythe Solar III, LLC Hybrid | Blythe, CA | 357.8 GWh |
| #199 | Raceway Solar & Storage | Lancaster, CA | 362.3 GWh |
| #200 | Maverick Solar 7, LLC | Desert Center, CA | 369.0 GWh |
| #201 | Edwards Sanborn E1B | Mojave, CA | 351.5 GWh |
| #202 | Montague Solar | Arlington, OR | 367.7 GWh |
| #203 | Maverick Solar, LLC | Desert Center, CA | 366.7 GWh |
| #205 | Swift Air Solar I | Goldsmith, TX | 364.7 GWh |
| #206 | BigBeau Solar, LLC | Rosamond, CA | 361.5 GWh |
| #207 | Solar Gen 2 Solar Facility | Calipatria, CA | 364.2 GWh |
| #208 | Blythe Solar IV, LLC | Blythe, CA | 356.4 GWh |
| #209 | Hardy Hills Solar Energy LLC | Frankfort, IN | 362.7 GWh |
| #210 | Twiggs Solar | Dry Branch, GA | 362.2 GWh |
| #211 | Samson Solar Energy II LLC | Cunningham, TX | 359.5 GWh |
| #212 | Lund Hill Solar | Bickleton, WA | 359.4 GWh |
| #213 | Hillcrest Solar | Mt. Orab, OH | 359.2 GWh |
| #214 | Spanish Peaks Solar | Trinidad, CO | 358.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Impact Solar 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bright Arrow Solar, LLC | Sulphur Springs, TX | 446.9 GWh | 26.7 mi |
| Chisum | Blossom, TX | 20.7 GWh | 11.5 mi |
| Coniglio Solar | Wolfe City, TX | 208.2 GWh | 41.3 mi |
| Delilah Solar Energy II LLC | Bogota, TX | 309.6 GWh | 5.9 mi |
| Delilah Solar Energy LLC | Bogota, TX | 515.0 GWh | 17.4 mi |
| Eiffel Solar Project | Paris, TX | 573.4 GWh | 12.7 mi |
| Estonian Solar Project, LLC | Cooper, TX | 462.3 GWh | 17.1 mi |
| Hopkins Energy LLC | Dike, TX | 574.1 GWh | 18.1 mi |
| Hugo | Fort Towson, OK | 1.4 TWh | 38 mi |
| International Paper Valliant OK | Valliant, OK | 394.0 GWh | 39.4 mi |
| Lamar Power Project | Paris, TX | 6.8 TWh | 16.9 mi |
| Mockingbird Solar Center | Brookston, TX | 943.5 GWh | 6.1 mi |
| Paris Energy Center | Paris, TX | 648.0 GWh | 19.1 mi |
| Pine Forest Solar I | Pickton, TX | 99.6 GWh | 25.4 mi |
| Samson Solar Energy | Cunningham, TX | 322.8 GWh | 18.1 mi |
| Samson Solar Energy II LLC | Cunningham, TX | 359.5 GWh | 1.4 mi |
| Samson Solar Energy III LLC | Cunningham, TX | 277.8 GWh | 3 mi |
| Stampede Solar Hybrid | Saltillo, TX | 533.2 GWh | 18.7 mi |
| Tyson Nick | Paris, TX | 58.3 GWh | 19.2 mi |
| Welsh | Pittsburg, TX | 3.7 TWh | 41.9 mi |