Laredo Ridge Wind LLC
2443 State Highway 32, Petersburg, NE 68652Plant Summary Information
Laredo Ridge Wind LLC is ranked #30 out of 123 power plants in Nebraska in terms of total annual net electricity generation.
Laredo Ridge Wind LLC generated 46.5 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Laredo Ridge Wind LLC |
|---|---|
| Utility Name | Laredo Ridge Wind LLC |
| Location | Boone County, NE |
| Initial Operation Date | February 2011 |
| Last Update | Dec 2024 |
| Annual Generation | 199.5 GWh |
| Annual Consumption | 754.5 k MMBtu |
| Ranked #2,472 out of 12,539 Power Plants Nationwide | |
| Ranked #741 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #30 out of 123 Nebraska Power Plants | |
| Ranked #17 out of 34 Nebraska Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
Edison Mission Energy (2013 to 2014) NRG Energy Gas & Wind Holdings Inc (2015 to 2020) Laredo Ridge Wind LLC (2021 to 2024) |
Map of Laredo Ridge Wind LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Laredo Ridge Wind LLC.
Monthly Net Generation for Laredo Ridge Wind LLC
Laredo Ridge Wind LLC Details
| Summary Information | |
|---|---|
| Plant Name | Laredo Ridge Wind LLC (57262) |
| Plant Address | 2443 State Highway 32, Petersburg, NE 68652 |
| Utility | Laredo Ridge Wind LLC (64649) |
| Latitude, Longitude | 41.88028, -98.02389 |
| Generation Dates on File | Feb 2011 to Dec 2024 |
| Initial Operation Date | February 2011 |
| Annual Generation | 199.5 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF10-510 |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG10-51 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Nebraska Public Power District (13337) NE |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator 1 Details Operating February 2011
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | SPP |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | SPP |
| Nameplate Capacity | 79.9 MW |
| Summer Capacity | 79.9 MW |
| Winter Capacity | 79.9 MW |
| Minimum Load | 1 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2011 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 54 |
| Turbine Details | |
| Number Of Turbines | 54 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.5 XLE |
| Design Wind Speed | 17 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 262.4 |
Laredo Ridge Wind LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #731 | Fairbanks Wind Park | Garden, MI | 203.3 GWh |
| #732 | San Gorgonio Windplant WPP1993 | North Palm Springs, CA | 202.0 GWh |
| #733 | Harvest 2 | Elkton, MI | 201.8 GWh |
| #734 | High Sheldon Wind Farm | Strykersville, NY | 201.4 GWh |
| #735 | Arlington Wind Power Project | Arlington, OR | 201.0 GWh |
| #736 | Silver Star I Wind Power Project | Dublin, TX | 200.5 GWh |
| #737 | Meadow Lake Wind Farm IV | Lafayette, IN | 200.1 GWh |
| #738 | Allegheny Ridge Wind Farm | Portage, PA | 200.1 GWh |
| #739 | Wilton Wind II LLC | Wilton, ND | 199.6 GWh |
| #740 | Summit Winds | Livermore, CA | 199.5 GWh |
| #742 | Hog Creek Wind Project | Ada, OH | 198.1 GWh |
| #743 | Wheat Field Wind Power Project | Arlington, OR | 198.0 GWh |
| #744 | Milo Wind Project LLC | Portales, NM | 197.6 GWh |
| #745 | Flat Ridge Wind Energy LLC | Isabel, KS | 197.5 GWh |
| #746 | Osceola Windpower II | Harris, IA | 196.9 GWh |
| #747 | Montezuma Wind II | Birds Landing, CA | 195.7 GWh |
| #748 | Jeffers Wind 20 LLC | Jeffers, MN | 195.4 GWh |
| #749 | Granite Reliable Power | Dummer, NH | 194.7 GWh |
| #750 | Milford Wind Corridor Stage II LLC | Milford, UT | 193.5 GWh |
| #751 | Alta Wind Energy Center IV | Mojave, CA | 193.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Laredo Ridge Wind LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Archer Daniels Midland Columbus | Columbus, NE | 275.2 GWh | 49.8 mi |
| Columbus | Columbus, NE | 119.5 GWh | 46 mi |
| Creston Ridge II, LLC | Creston, NE | 28.9 GWh | 35.5 mi |
| Creston Ridge Wind Farm | Creston, NE | 24.3 GWh | 35.7 mi |
| Grande Prairie Wind Farm | O'Neill, NE | 1.5 TWh | 54.4 mi |
| Haystack Wind Project, LLC | Carroll, NE | 712.3 GWh | 50 mi |
| Madison Utilities | Madison, NE | 1.0 MWh | 29.4 mi |
| Monroe (NE) | Monroe, NE | 25.4 GWh | 34.6 mi |
| Ord | Ord, NE | 106.0 MWh | 50.3 mi |
| Plum Creek Wind Project (NE) | Winside, NE | 829.0 GWh | 46.4 mi |
| Prairie Breeze | Elgin, NE | 595.7 GWh | 5.6 mi |
| Prairie Breeze II | Elgin, NE | 277.4 GWh | 12.1 mi |
| Prairie Breeze III | Elgin, NE | 136.3 GWh | 12.1 mi |
| Sholes Wind Energy Center | Randolph, NE | 693.7 GWh | 45.1 mi |
| South 49th 013445 SCS Norfolk, LLC | Norfolk, NE | 18.5 GWh | 29.7 mi |
| Spalding | Spalding, NE | 4.0 MWh | 22.4 mi |
| St. Paul-Howard Greeley | St. Paul, NE | 2.4 GWh | 51 mi |
| Thunderhead Wind Energy LLC | Boone, NE | 1.1 TWh | 16.7 mi |
| TPW Petersburg | Petersburg, NE | 162.4 GWh | 3.4 mi |
| Upstream Wind Energy LLC | Neligh, NE | 737.3 GWh | 21.2 mi |