Liberty County Solar Project
8240 FM 1409, Dayton, TX 77535Plant Summary Information
Liberty County Solar Project is ranked #108 out of 191 solar farms in Texas in terms of total annual net electricity generation.
Liberty County Solar Project generated 67.7 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Liberty County Solar Project |
---|---|
Utility Name | Liberty County Solar Project, LLC |
Location | Liberty County, TX |
Initial Operation Date | September 2024 |
Last Update | May 2025 |
Annual Generation | 144.0 GWh |
Annual Consumption | 491.2 k MMBtu |
Ranked #2,839 out of 12,312 Power Plants Nationwide | |
Ranked #519 out of 6,191 Solar Power Plants Nationwide | |
Ranked #456 out of 796 Texas Power Plants | |
Ranked #108 out of 191 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Liberty County Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Liberty County Solar Project.
Monthly Net Generation for Liberty County Solar Project
Liberty County Solar Project Details
Summary Information | |
---|---|
Plant Name | Liberty County Solar Project (67159) |
Plant Address | 8240 FM 1409, Dayton, TX 77535 |
Utility | Liberty County Solar Project, LLC (65874) |
Latitude, Longitude | 29.95888, -94.85048 |
Generation Dates on File | Sep 2024 to May 2025 |
Initial Operation Date | September 2024 |
Annual Generation | 144.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG24-165-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Entergy Arkansas LLC (814) AR |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator LIBCO Details Operating September 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | EES.LIBERTY |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ESS.LIBERTY |
Nameplate Capacity | 109.9 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Fixed Tilt | No |
Bifacial | Yes |
DC Net Capacity | 134.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Liberty County Solar Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#509 | Adams Solar LLC PA | Gettysburg, PA | 145.7 GWh |
#510 | Wildflower Solar Energy Center | Arcadia, FL | 145.5 GWh |
#511 | FPL Chipola River Solar Energy Center | Altha, FL | 145.3 GWh |
#512 | Twin Lakes Solar LLC | Monticello, IN | 145.2 GWh |
#513 | Orange Blossom Solar Center | Vero Beach, FL | 145.2 GWh |
#514 | Hardin Solar Energy II LLC | Belle Center, OH | 144.5 GWh |
#515 | Monarch | TBD, FL | 144.3 GWh |
#516 | Beulah Solar | Batesburg, SC | 144.2 GWh |
#517 | Babcock Preserve | Punta Gorda, FL | 144.1 GWh |
#518 | Trent River Solar, LLC | Pollocksville, NC | 144.1 GWh |
#520 | Juniper Solar (FL) | Zephyrhills, FL | 143.8 GWh |
#521 | Palm Bay Solar | Palm Bay, FL | 143.8 GWh |
#522 | Huck Finn Renewable Energy Center | Vandalia, MO | 143.7 GWh |
#523 | Encino Solar Energy Center | Rio Rancho Estates, NM | 143.3 GWh |
#524 | FPL Etonia Creek | Palatka, FL | 143.1 GWh |
#525 | Hardin Solar III | Alger, OH | 142.8 GWh |
#526 | Cattle Ranch | Arcadia, FL | 142.8 GWh |
#527 | Jamison Solar (FL) | Mulberry, FL | 142.8 GWh |
#528 | Union Springs Solar Center | Lake Butler, FL | 142.4 GWh |
#529 | Britton Solar Energy Center | Moriarty, NM | 142.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Liberty County Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Baytown Energy Center | Baytown, TX | 4.7 TWh | 13.2 mi |
Cedar Bayou | Baytown, TX | 2.7 TWh | 15.1 mi |
Cedar Bayou 4 | Eldon, TX | 2.3 TWh | 15 mi |
Chamon Power LLC | Houston, TX | 114.9 GWh | 16.5 mi |
Channelview Cogeneration Plant | Channelview, TX | 5.8 TWh | 18.3 mi |
Enterprise Products Operating | Mont Belvieu, TX | 154.7 GWh | 10.2 mi |
ExxonMobil Baytown Refinery | Baytown, TX | 1.2 TWh | 16.7 mi |
ExxonMobil Baytown Turbine | Baytown, TX | 2.7 TWh | 16.8 mi |
HEB00798 | Humble, TX | 136.0 MWh | 21.4 mi |
Houston Chemical Complex Battleground | Houston, TX | 1.8 TWh | 21 mi |
Mont Belvieu Cogeneration Unit | Mont Belvieu, TX | 95.4 GWh | 8.9 mi |
Odyssey Energy Altura Cogen, LLC | Channelview, TX | 3.6 TWh | 18.3 mi |
RavenChem | Baytown, TX | 48.0 MWh | 10.3 mi |
Remy Jade Power Station | Crosby, TX | 553.9 GWh | 12.5 mi |
San Jacinto Steam Electric Station | La Porte, TX | 857.9 GWh | 21.5 mi |
SJRR Power LLC | Houston, TX | 146.6 GWh | 16.5 mi |
WAL194 | Baytown, TX | 209.0 MWh | 14.6 mi |
WAL2439 | Baytown, TX | 159.0 MWh | 10.2 mi |
WAL522 | Crosby, TX | 316.0 MWh | 13.6 mi |
WAL744 | Humble, TX | 286.0 MWh | 19.7 mi |