Liberty County Solar Project
8240 FM 1409, Dayton, TX 77535Plant Summary Information
Liberty County Solar Project is ranked #97 out of 201 solar farms in Texas in terms of total annual net electricity generation.
Liberty County Solar Project generated 72.5 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Liberty County Solar Project |
|---|---|
| Utility Name | Liberty County Solar Project, LLC |
| Location | Liberty County, TX |
| Initial Operation Date | September 2024 |
| Last Update | Sep 2025 |
| Annual Generation | 243.1 GWh |
| Annual Consumption | 831.5 k MMBtu |
| Ranked #2,244 out of 12,539 Power Plants Nationwide | |
| Ranked #331 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #409 out of 799 Texas Power Plants | |
| Ranked #97 out of 201 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Liberty County Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Liberty County Solar Project.
Monthly Net Generation for Liberty County Solar Project
Liberty County Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Liberty County Solar Project (67159) |
| Plant Address | 8240 FM 1409, Dayton, TX 77535 |
| Utility | Liberty County Solar Project, LLC (65874) |
| Latitude, Longitude | 29.95888, -94.85048 |
| Generation Dates on File | Sep 2024 to Sep 2025 |
| Initial Operation Date | September 2024 |
| Annual Generation | 243.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG24-165-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Entergy Arkansas LLC (814) AR |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator LIBCO Details Operating September 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | EES.LIBERTY |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | ESS.LIBERTY |
| Nameplate Capacity | 109.9 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Bifacial | Yes |
| DC Net Capacity | 134.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Liberty County Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #321 | Chesapeake Solar Project | Chesapeake, VA | 247.8 GWh |
| #322 | Hecate Energy Outpost Solar LLC | Laredo, TX | 247.4 GWh |
| #323 | SR Snipesville II | Denton, GA | 247.2 GWh |
| #324 | Taylor County Solar | Butler, GA | 245.4 GWh |
| #325 | Samson Solar Energy III LLC | Cunningham, TX | 245.3 GWh |
| #326 | OCI Alamo 7 LLC | Haskell, TX | 245.3 GWh |
| #327 | BPL Files Solar | Itasca, TX | 244.4 GWh |
| #328 | Wever Solar (150MW) | Wever, IA | 244.3 GWh |
| #329 | Galloway 2 Solar Farm | Paint Rock, TX | 243.6 GWh |
| #330 | Robins Air Force Base Solar | Macon, GA | 243.2 GWh |
| #332 | Ray Ranch Solar | Pettus, TX | 242.5 GWh |
| #333 | Lockhart Solar PV, LLC | Hinkley, CA | 242.4 GWh |
| #334 | Ivanpah 2 | Nipton, CA | 254.4 GWh |
| #335 | Oak Trail Solar, LLC | Moyock, NC | 238.0 GWh |
| #336 | Starr Solar Ranch | Roma, TX | 237.6 GWh |
| #337 | Pleasant Creek Unit 2 | Palo, IA | 236.8 GWh |
| #338 | Franklin Solar Hybrid | Twin Falls, ID | 236.7 GWh |
| #339 | Prairie Ronde Solar Farm | Opelousas, LA | 236.7 GWh |
| #340 | SR Lumpkin | Lumpkin, GA | 235.1 GWh |
| #341 | Daybreak Solar | Maupin, OR | 234.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Liberty County Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Baytown Energy Center | Baytown, TX | 4.0 TWh | 13.2 mi |
| Cedar Bayou | Baytown, TX | 1.4 TWh | 15.1 mi |
| Cedar Bayou 4 | Eldon, TX | 2.3 TWh | 15 mi |
| Chamon Power LLC | Houston, TX | 114.9 GWh | 16.5 mi |
| Channelview Cogeneration Plant | Channelview, TX | 5.6 TWh | 18.3 mi |
| Enterprise Products Operating | Mont Belvieu, TX | 154.7 GWh | 10.2 mi |
| ExxonMobil Baytown Refinery | Baytown, TX | 1.2 TWh | 16.7 mi |
| ExxonMobil Baytown Turbine | Baytown, TX | 2.6 TWh | 16.8 mi |
| HEB00798 | Humble, TX | 136.0 MWh | 21.4 mi |
| Houston Chemical Complex Battleground | Houston, TX | 1.9 TWh | 21 mi |
| Liberty Hybrid Solar and Storage Project | Dayton, TX | 17.4 GWh | 11.9 mi |
| Mont Belvieu Cogeneration Unit | Mont Belvieu, TX | 95.4 GWh | 8.9 mi |
| Odyssey Energy Altura Cogen, LLC | Channelview, TX | 3.7 TWh | 18.3 mi |
| RavenChem | Baytown, TX | 48.0 MWh | 10.3 mi |
| Remy Jade Power Station | Crosby, TX | 532.6 GWh | 12.5 mi |
| SJRR Power LLC | Houston, TX | 146.6 GWh | 16.5 mi |
| WAL194 | Baytown, TX | 209.0 MWh | 14.6 mi |
| WAL2439 | Baytown, TX | 159.0 MWh | 10.2 mi |
| WAL522 | Crosby, TX | 316.0 MWh | 13.6 mi |
| WAL744 | Humble, TX | 286.0 MWh | 19.7 mi |