Sweetwater Wind 2 LLC

6902 Hwy 70, Sweetwater, TX 79556

Plant Summary Information

Sweetwater Wind 2 LLC is ranked #158 out of 228 wind farms in Texas in terms of total annual net electricity generation.

Sweetwater Wind 2 LLC generated 93.0 GWh during the 3-month period between September 2025 to December 2025.

Plant NameSweetwater Wind 2 LLC
Utility NameLeeward Asset Management, LLC
LocationNolan County, TX
Initial Operation DateFebruary 2005
Last Update Dec 2025
Annual Generation 351.7 GWh
Annual Consumption 1.3 M MMBtu
Ranked #1,819 out of 13,081 Power Plants Nationwide
Ranked #535 out of 1,366 Wind Power Plants Nationwide
Ranked #372 out of 852 Texas Power Plants
Ranked #158 out of 228 Texas Wind Power Plants
Fuel Types Wind
Previous Operator Infigen Asset Management LLC (2013 to 2014)
Leeward Asset Management, LLC (2015 to 2025)

Map of Sweetwater Wind 2 LLC

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sweetwater Wind 2 LLC.

Create Your Account Today

Monthly Net Generation for Sweetwater Wind 2 LLC

Monthly Plant Fuel Consumption for Sweetwater Wind 2 LLC

Sweetwater Wind 2 LLC Details

Summary Information
Plant NameSweetwater Wind 2 LLC (56212)
Plant Address6902 Hwy 70, Sweetwater, TX 79556
UtilityLeeward Asset Management, LLC (50123)
Latitude, Longitude32.3472, -100.3703
Generation Dates on FileFeb 2005 to Dec 2025
Initial Operation DateFebruary 2005
Annual Generation 351.7 GWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusYes
FERC Exempt Wholesale Generator Docket Number05-24-000
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc. (ERCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerOncor Electric Delivery Company LLC (44372) TX
Grid Voltage 345.00 kV
Energy StorageNo

Generator SW2 Details Operating February 2005

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipSingle Owner
RTO ISO LMP Node DesignationSWEETWN2_2_4
RTO ISO Location Designation For Reporting Wholesale Sales DataSWEETWN2_2_4
Nameplate Capacity98.8 MW
Summer Capacity98.8 MW
Winter Capacity98.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2005
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWind
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Turbines/Hydrokinetic Buoys61
Multiple FuelsNo
Turbine Details
Number Of Turbines61
Predominant Turbine ManufacturerGE
Predominant Turbine Model Number1.5 SLE
Design Wind Speed19 MPH
Wind Quality Class2 - Medium Wind
Turbine Hub Height Feet262

Sweetwater Wind 2 LLC Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#525Big Sampson WindTBD, TX359.3 GWh
#526Crescent Wind ParkHillsdale, MI358.8 GWh
#527Prairie Winds SD1Crow Lake, SD358.1 GWh
#528Blue Summit II WindVernon, TX357.9 GWh
#529Tuscola Bay WindReese, MI357.9 GWh
#530Elbow Creek Wind Project LLCForsan, TX357.9 GWh
#531Drift Sand Wind Project LLCRush Springs, OK357.1 GWh
#532Wolf Ridge WindMuenster, TX355.0 GWh
#533Prairie Winds ND1Minot, ND353.8 GWh
#534Hopkins Ridge WindDayton, WA352.9 GWh
#536Lorenzo WindLorenzo, TX351.1 GWh
#537Midland WindKewane, IL350.9 GWh
#538Cameron Wind 1 LLCRio Hondo, TX348.2 GWh
#539Buffalo Gap 2 Wind FarmMerkel, TX350.4 GWh
#540Lindahl Wind Project, LLCTioga, ND350.1 GWh
#541Trimont Area Wind FarmTrimont, MN349.7 GWh
#542Majestic 1 Wind FarmPanhandle, TX349.7 GWh
#543Palmas Wind, LLCRio Hondo, TX349.6 GWh
#544Rugby Wind Power ProjectBarton, ND348.1 GWh
#545Spinning Spur Wind LLCVegas, TX347.0 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Sweetwater Wind 2 LLC.

Plant NamePlant LocationAnnual GenerationDistance
Buffalo Gap 2 Wind FarmMerkel, TX350.4 GWh11.5 mi
Buffalo Gap 3 Wind FarmNolan, TX337.7 GWh16.3 mi
Buffalo Gap Wind FarmMerkel, TX158.7 GWh18.2 mi
Callahan Divide Wind Energy CenterTusocola, TX422.0 GWh20.6 mi
Champion Wind Farm LLCRoscoe, TX382.3 GWh16.6 mi
Holstein 1 Solar FarmWingate, TX337.6 GWh20.7 mi
Horse Hollow Wind Energy CenterWingate, TX2.4 TWh20.5 mi
Inadale Wind Farm LLC HybridRoscoe, TX321.2 GWh16 mi
Loraine Windpark Project LLCLoraine, TX307.8 GWh22.7 mi
Maryneal WindpowerMaryneal, TX499.2 GWh12.4 mi
Mesquite StarRoscoe, TX1.2 TWh6.9 mi
Pyron Wind Farm LLC HybridHermleigh, TX896.2 GWh24.3 mi
Roscoe Wind Farm LLCRoscoe, TX335.8 GWh19.2 mi
South Trent Wind FarmSweetwater, TX272.3 GWh14.7 mi
Sweetwater Wind 1 LLCSweetwater, TX138.2 GWh2.1 mi
Sweetwater Wind 3 LLCSweetwater, TX472.3 GWh4.9 mi
Sweetwater Wind 4 LLCRoscoe, TX622.7 GWh9.6 mi
Sweetwater Wind 5Roscoe, TX172.5 GWh10.1 mi
Trent Wind FarmTrent, TX525.7 GWh9.7 mi
Turkey Track Wind Energy LLCBlackwell, TX331.4 GWh11.9 mi