Sweetwater Wind 2 LLC
Nolan, Sweetwater, TX 79556Plant Summary Information
Sweetwater Wind 2 LLC is ranked #152 out of 221 wind farms in Texas in terms of total annual net electricity generation.
Sweetwater Wind 2 LLC generated 94.4 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Sweetwater Wind 2 LLC |
---|---|
Utility Name | Leeward Asset Management, LLC |
Location | Nolan County, TX |
Initial Operation Date | February 2005 |
Last Update | Dec 2024 |
Annual Generation | 340.6 GWh |
Annual Consumption | 1.3 M MMBtu |
Ranked #1,742 out of 12,288 Power Plants Nationwide | |
Ranked #527 out of 1,353 Wind Power Plants Nationwide | |
Ranked #327 out of 788 Texas Power Plants | |
Ranked #152 out of 221 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Infigen Asset Management LLC (2013 to 2014) Leeward Asset Management, LLC (2015 to 2024) |
Map of Sweetwater Wind 2 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sweetwater Wind 2 LLC.
Monthly Net Generation for Sweetwater Wind 2 LLC
Sweetwater Wind 2 LLC Details
Summary Information | |
---|---|
Plant Name | Sweetwater Wind 2 LLC (56212) |
Plant Address | Nolan, Sweetwater, TX 79556 |
Utility | Leeward Asset Management, LLC (50123) |
Latitude, Longitude | 32.3472, -100.3703 |
Generation Dates on File | Feb 2005 to Dec 2024 |
Initial Operation Date | February 2005 |
Annual Generation | 340.6 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 05-24-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator SW2 Details Operating February 2005
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SWEETWN2_2_4 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SWEETWN2_2_4 |
Nameplate Capacity | 98.8 MW |
Summer Capacity | 98.8 MW |
Winter Capacity | 98.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2005 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 61 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 61 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SLE |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262 |
Sweetwater Wind 2 LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#517 | Sac County Wind, LLC | Sac City, IA | 345.5 GWh |
#518 | Peyton Creek Wind Farm LLC | Bay City, TX | 344.8 GWh |
#519 | Cedro Hill Wind LLC | Bruni, TX | 344.5 GWh |
#520 | Midland Wind | Kewane, IL | 343.8 GWh |
#521 | Mower County Wind Energy Center | Grand Meadow, MN | 343.3 GWh |
#522 | Roscoe Wind Farm LLC | Roscoe, TX | 343.2 GWh |
#523 | Meadow Lake Wind Farm V LLC | Chalmers, IN | 343.2 GWh |
#524 | Bent Tree Wind Farm Phase 1 | Hartland, MN | 343.0 GWh |
#525 | Lorenzo Wind | Lorenzo, TX | 341.6 GWh |
#526 | Tule Wind LLC | Boulevard, CA | 341.4 GWh |
#528 | Bishop Hill II Wind Farm | Cambridge, IL | 339.9 GWh |
#529 | Los Vientos Wind 1A | Sebastian, TX | 339.7 GWh |
#530 | Cameron Wind 1 LLC | Rio Hondo, TX | 339.0 GWh |
#531 | Lakefield Wind Project LLC | Lakefield, MN | 338.0 GWh |
#532 | Spring Valley Wind Project | Ely, NV | 337.4 GWh |
#533 | Alta Wind X | Mojave, CA | 336.5 GWh |
#534 | Inadale Wind Farm LLC Hybrid | Roscoe, TX | 335.1 GWh |
#535 | Papalote Creek I LLC | Taft, TX | 335.8 GWh |
#536 | Rugby Wind Power Project | Barton, ND | 335.4 GWh |
#537 | Contrail Wind Farm | Bedford, IA | 334.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sweetwater Wind 2 LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Buffalo Gap 2 Wind Farm | Merkel, TX | 372.6 GWh | 11.5 mi |
Buffalo Gap 3 Wind Farm | Nolan, TX | 302.2 GWh | 16.3 mi |
Buffalo Gap Wind Farm | Merkel, TX | 179.0 GWh | 18.2 mi |
Callahan Divide Wind Energy Center | Tusocola, TX | 414.3 GWh | 20.6 mi |
Champion Wind Farm LLC | Roscoe, TX | 94.9 GWh | 16.6 mi |
Holstein 1 Solar Farm | Wingate, TX | 386.0 GWh | 20.7 mi |
Horse Hollow Wind Energy Center | Wingate, TX | 2.5 TWh | 20.5 mi |
Inadale Wind Farm LLC Hybrid | Roscoe, TX | 335.1 GWh | 16 mi |
Loraine Windpark Project LLC | Loraine, TX | 307.8 GWh | 22.7 mi |
Maryneal Windpower | Maryneal, TX | 569.6 GWh | 12.4 mi |
Mesquite Star | Roscoe, TX | 1.2 TWh | 6.9 mi |
Pyron Wind Farm LLC Hybrid | Hermleigh, TX | 914.2 GWh | 24.3 mi |
Roscoe Wind Farm LLC | Roscoe, TX | 343.2 GWh | 19.2 mi |
South Trent Wind Farm | Sweetwater, TX | 252.5 GWh | 14.7 mi |
Sweetwater Wind 1 LLC | Sweetwater, TX | 140.8 GWh | 2.1 mi |
Sweetwater Wind 3 LLC | Sweetwater, TX | 470.0 GWh | 4.9 mi |
Sweetwater Wind 4 LLC | Roscoe, TX | 636.6 GWh | 9.6 mi |
Sweetwater Wind 5 | Roscoe, TX | 163.2 GWh | 10.1 mi |
Trent Wind Farm | Trent, TX | 515.0 GWh | 9.7 mi |
Turkey Track Wind Energy LLC | Blackwell, TX | 300.7 GWh | 11.9 mi |