Lawrenceburg Power, LLC
582 W. Eads Parkway, Lawrenceburg, IN 47025Plant Summary Information
Lawrenceburg Power, LLC is ranked #34 out of 2,206 natural gas power plants nationwide in terms of total annual net electricity generation.
Lawrenceburg Power, LLC is comprised of 6 generators and generated 1.5 TWh during the 3-month period between January 2026 to April 2026.
| Plant Name | Lawrenceburg Power, LLC |
|---|---|
| Utility Name | Lawrenceburg Power, LLC |
| Location | Dearborn County, IN |
| Initial Operation Date | June 2004 |
| Last Update | Apr 2026 |
| Annual Generation | 7.6 TWh |
| Annual Consumption | 59.9 M MMBtu |
| Ranked #111 out of 13,081 Power Plants Nationwide | |
| Ranked #34 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #3 out of 218 Indiana Power Plants | |
| Ranked #1 out of 46 Indiana Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operator |
AEP Generating Company (2013 to 2016) Lawrenceburg Power, LLC (2017 to 2025) |
Map of Lawrenceburg Power, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lawrenceburg Power, LLC.
Monthly Net Generation for Lawrenceburg Power, LLC
Monthly Plant Fuel Consumption for Lawrenceburg Power, LLC
Lawrenceburg Power, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Lawrenceburg Power, LLC (55502) |
| Plant Address | 582 W. Eads Parkway, Lawrenceburg, IN 47025 |
| Utility | Lawrenceburg Power, LLC (61137) |
| Latitude, Longitude | 39.0911, -84.8669 |
| Generation Dates on File | Aug 2004 to Apr 2026 |
| Initial Operation Date | June 2004 |
| Annual Generation | 7.6 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | ER17-243-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Tanners Creek |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Indiana Michigan Power Co (9324) IN |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | TEXAS GAS TRANSMISSION LLC |
| Natural Gas Storage | No |
Generator 0100 Details Operating June 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Wholly Owned by Other Entity |
| Duct Burners | Yes |
| Nameplate Capacity | 268 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 258.5 MW |
| Winter Capacity | 263 MW |
| Minimum Load | 125 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2004 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 0200 Details Operating June 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC2 |
| Ownership | Wholly Owned by Other Entity |
| Duct Burners | Yes |
| Nameplate Capacity | 268 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 261.8 MW |
| Winter Capacity | 263 MW |
| Minimum Load | 125 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2004 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 1100 Details Operating June 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Wholly Owned by Other Entity |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 174 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 167.9 MW |
| Winter Capacity | 188 MW |
| Minimum Load | 80 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2004 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 1200 Details Operating June 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Wholly Owned by Other Entity |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 174 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 174.7 MW |
| Winter Capacity | 193 MW |
| Minimum Load | 80 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2004 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 2100 Details Operating June 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Wholly Owned by Other Entity |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 174 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 174.9 MW |
| Winter Capacity | 188 MW |
| Minimum Load | 80 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2004 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 2200 Details Operating June 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Wholly Owned by Other Entity |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 174 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 168.9 MW |
| Winter Capacity | 193 MW |
| Minimum Load | 80 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2004 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Lawrenceburg Power, LLC Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Cornerstone Generation | 500 Alexander Park Drive, Suite 300, Princeton, NJ 8540 | Generator 0100 | 100.00% |
| Cornerstone Generation | 500 Alexander Park Drive, Suite 300, Princeton, NJ 8540 | Generator 0200 | 100.00% |
| Cornerstone Generation | 500 Alexander Park Drive, Suite 300, Princeton, NJ 8540 | Generator 1100 | 100.00% |
| Cornerstone Generation | 500 Alexander Park Drive, Suite 300, Princeton, NJ 8540 | Generator 1200 | 100.00% |
| Cornerstone Generation | 500 Alexander Park Drive, Suite 300, Princeton, NJ 8540 | Generator 2100 | 100.00% |
| Cornerstone Generation | 500 Alexander Park Drive, Suite 300, Princeton, NJ 8540 | Generator 2200 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #24 | Temple Power Station | Temple, TX | 8.3 TWh |
| #25 | Lackawanna Energy Center | Jessup, PA | 8.3 TWh |
| #26 | Nine Mile Point | Westwego, LA | 8.2 TWh |
| #27 | Paradise | Drakesboro, KY | 8.1 TWh |
| #28 | Thomas A Smith Energy Facility | Dalton, GA | 8.0 TWh |
| #29 | Martin | Indiantown, FL | 8.0 TWh |
| #30 | South Field Energy | Wellsville, OH | 7.9 TWh |
| #31 | McIntosh Combined Cycle Facility | Rincon, GA | 7.9 TWh |
| #32 | Blue Water Energy Center | East China, MI | 7.8 TWh |
| #33 | Cape Canaveral | Cocoa, FL | 7.8 TWh |
| #35 | Deer Park Energy Center | Deer Park, TX | 7.5 TWh |
| #36 | Wansley Combined Cycle | Franklin, GA | 7.4 TWh |
| #37 | New Covert Generating Facility | Covert, MI | 7.3 TWh |
| #38 | Manatee | Parrish, FL | 7.2 TWh |
| #39 | Riviera | Riviera Beach, FL | 7.2 TWh |
| #40 | Lamar Power Project | Paris, TX | 7.2 TWh |
| #41 | Midlothian Energy Facility | Midlothian, TX | 7.1 TWh |
| #42 | Turkey Point | Homestead, FL | 19.8 TWh |
| #43 | Moxie Freedom Generation Plant | Salem Township, PA | 7.0 TWh |
| #44 | Indeck Niles Energy Center | Niles, MI | 7.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lawrenceburg Power, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Aero Solar Facility | Burlington, KY | 2.8 GWh | 11.9 mi |
| Bavarian LFGTE | Walton, KY | 30.9 GWh | 19.5 mi |
| Central Utility Plant Cincinnati | Cincinnati, OH | 223.0 GWh | 19.4 mi |
| Crittenden Solar Facility | Dry Ridge, KY | 3.5 GWh | 27.1 mi |
| East Bend | Union, KY | 2.9 TWh | 13 mi |
| East Campus Utility Plant | Cincinnati, OH | 526.3 MWh | 19.7 mi |
| Ghent | Ghent, KY | 10.2 TWh | 25.3 mi |
| Hamilton (OH) | Hamilton, OH | 1.2 GWh | 27.7 mi |
| Hamilton Hydro | HAMILTON, OH | 8.8 GWh | 27.8 mi |
| Hamilton Peaking | Hamilton, OH | 1.5 GWh | 26 mi |
| L'Oreal Solar - Florence | Florence, KY | 1.5 GWh | 15.6 mi |
| Madison | Trenton, OH | 1.0 TWh | 32.9 mi |
| Markland | Florence, IN | 252.6 GWh | 22.2 mi |
| Miami Fort | North Bend, OH | 6.5 TWh | 3.7 mi |
| Parking Lot Array | Cincinnati, OH | 1.4 GWh | 19.4 mi |
| Pendleton County LFGTE | Butler, KY | 24.0 GWh | 35 mi |
| RA Jones Roof Mounted Solar System | Covington, KY | 2.0 GWh | 15.5 mi |
| Walton 1 Solar Facility | Walton, KY | 2.7 GWh | 22.2 mi |
| Walton 2 Solar Facility | Walton, KY | 2.6 GWh | 22.2 mi |
| Woodsdale | Trenton, OH | 463.4 GWh | 32.9 mi |