Arche Energy Project, LLC
22773 US Highway 20, Fayette, OH 43521Plant Summary Information
Arche Energy Project, LLC is ranked #16 out of 75 solar farms in Ohio in terms of total annual net electricity generation.
Arche Energy Project, LLC generated 54.7 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Arche Energy Project, LLC |
|---|---|
| Utility Name | Lightsource Renewable Energy Asset Management, LLC |
| Location | Fulton County, OH |
| Initial Operation Date | January 2024 |
| Last Update | May 2026 |
| Annual Generation | 194.5 GWh |
| Annual Consumption | 730.6 k MMBtu |
| Ranked #2,574 out of 13,081 Power Plants Nationwide | |
| Ranked #480 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #58 out of 206 Ohio Power Plants | |
| Ranked #16 out of 75 Ohio Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
AE Power Services LLC (2021 to 2022) Lightsource Renewable Energy Asset Management, LLC (2023 to 2025) |
Map of Arche Energy Project, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Arche Energy Project, LLC.
Monthly Net Generation for Arche Energy Project, LLC
Monthly Plant Fuel Consumption for Arche Energy Project, LLC
Arche Energy Project, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Arche Energy Project, LLC (65402) |
| Plant Address | 22773 US Highway 20, Fayette, OH 43521 |
| Utility | Lightsource Renewable Energy Asset Management, LLC (62842) |
| Latitude, Longitude | 41.67211, -84.30645 |
| Generation Dates on File | Jan 2024 to May 2026 |
| Initial Operation Date | January 2024 |
| Annual Generation | 194.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 25-338-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | |
| Transmission / Distribution Owner | American Transmission Systems Inc (56162) |
| Grid Voltage | 138.00 kV / 138.00 kV / 138.00 kV |
| Energy Storage | No |
Generator ARCHE Details Operating January 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 107 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 107 MW |
| Winter Capacity | 107 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 133.84 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Arche Energy Project, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #470 | Cereal City Solar, LLC | Battle Creek, MI | 198.6 GWh |
| #471 | Clover Creek Solar Community Solar | Mona, UT | 197.9 GWh |
| #472 | Point Beach Solar | Two Creeks, WI | 197.8 GWh |
| #473 | Stillhouse Solar | Rogers, TX | 197.5 GWh |
| #474 | Three Corners Solar | Unity, ME | 197.1 GWh |
| #475 | Desert Harvest II LLC | Desert Center, CA | 193.6 GWh |
| #476 | Horseshoe Solar, LLC | Tooele, UT | 196.5 GWh |
| #477 | Spring Grove I | Spring Grove, VA | 196.3 GWh |
| #478 | Snipesville | Denton, GA | 196.1 GWh |
| #479 | Lamesa Solar | Lamesa, TX | 195.3 GWh |
| #481 | Hunter Solar, LLC (CO) | Bennett, CO | 194.4 GWh |
| #482 | Harvest Gold Solar | Indianola, MS | 193.3 GWh |
| #483 | Blackwater Solar | Bickley, GA | 192.0 GWh |
| #484 | Steel Solar LLC | Plymouth, UT | 191.9 GWh |
| #485 | Gilchrist County Solar | Newberry, FL | 191.7 GWh |
| #486 | Second Division Solar | West Columbia, TX | 191.6 GWh |
| #487 | Honeybell | TBD, FL | 191.0 GWh |
| #488 | Buttonwood | Fort Pierce, FL | 190.7 GWh |
| #489 | Three Creeks | Parrish, FL | 190.4 GWh |
| #490 | Wautoma Solar | Wautoma, WI | 189.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Arche Energy Project, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Adrian Energy Associates LLC | Adrian, MI | 2.1 GWh | 22.1 mi |
| AMP Napoleon Solar Facility | Napoleon, OH | 4.2 GWh | 20.9 mi |
| Blue Elk IV Solar, LLC | Adrian, MI | 37.4 GWh | 23.3 mi |
| Bryan (OH) | Bryan, OH | 3.2 GWh | 18.5 mi |
| Bryan Peaking | Bryan, OH | 597.0 MWh | 18.5 mi |
| Bryan Solar Field | Bryan, OH | 2.4 GWh | 19.8 mi |
| Bullhead Solar, LLC | Fayette, MI | 4.0 GWh | 27.5 mi |
| Crescent Wind Park | Hillsdale, MI | 358.8 GWh | 20.2 mi |
| Edgerton | Edgerton, OH | 182.0 MWh | 28.3 mi |
| Heartwood Solar | Allen, MI | 21.6 GWh | 28.5 mi |
| Hillsdale | Hillsdale, MI | 711.0 MWh | 23.3 mi |
| Montpelier | Montpelier, OH | 466.0 MWh | 15.3 mi |
| Montpelier Solar Project | Montpelier, OH | 32.3 GWh | 14.3 mi |
| Napoleon Peaking | Napoleon, OH | 242.0 MWh | 20.9 mi |
| Napoleon Peaking Station | Napoleon, OH | 2.6 GWh | 20.9 mi |
| Napoleon Solar I | Napoleon, OH | 10.9 GWh | 22.4 mi |
| Richland (OH) | Defiance, OH | 367.5 GWh | 25.4 mi |
| Sauder Power Plant | Archbold, OH | 7.4 GWh | 10.9 mi |
| Stryker | Stryker, OH | 161.0 MWh | 13.4 mi |
| Toledo Air National Guard | Swanton, OH | 296.0 MWh | 27.4 mi |