Happy Solar 1
441 Joe Pantel Road, Searcy, AR 72143Plant Summary Information
Happy Solar 1 is ranked #27 out of 97 power plants in Arkansas in terms of total annual net electricity generation.
Happy Solar 1 generated 58.8 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Happy Solar 1 |
---|---|
Utility Name | Lightsource Renewable Energy Asset Management, LLC |
Location | White County, AR |
Initial Operation Date | October 2023 |
Last Update | May 2025 |
Annual Generation | 211.9 GWh |
Annual Consumption | 790.8 k MMBtu |
Ranked #2,329 out of 12,312 Power Plants Nationwide | |
Ranked #320 out of 6,191 Solar Power Plants Nationwide | |
Ranked #27 out of 97 Arkansas Power Plants | |
Ranked #6 out of 52 Arkansas Solar Power Plants | |
Fuel Types | Solar |
Map of Happy Solar 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Happy Solar 1.
Monthly Net Generation for Happy Solar 1
Happy Solar 1 Details
Summary Information | |
---|---|
Plant Name | Happy Solar 1 (63766) |
Plant Address | 441 Joe Pantel Road, Searcy, AR 72143 |
Utility | Lightsource Renewable Energy Asset Management, LLC (62842) |
Latitude, Longitude | 35.16772, -91.66028 |
Generation Dates on File | Oct 2023 to May 2025 |
Initial Operation Date | October 2023 |
Annual Generation | 211.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 21-251-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Entergy Arkansas LLC (814) AR |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator ARHA1 Details Operating October 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 95 MW |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 130 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Happy Solar 1 Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Happy Solar 1, LLC | 400 Montgomery Street, 8th Floor, San Francisco, CA 94104 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#310 | Chicot Solar | Lake Village, AR | 216.9 GWh |
#311 | Wapello Solar LLC | Wapello, IA | 216.1 GWh |
#312 | Iron Springs Solar, LLC | Cedar City, UT | 215.8 GWh |
#313 | Elizabeth Solar Plant | Pitkin, LA | 215.7 GWh |
#314 | Lamesa Solar | Lamesa, TX | 215.0 GWh |
#315 | Sun Streams 4 | Tonopah, AZ | 204.2 GWh |
#316 | Maple Flats | Louisville, IL | 213.6 GWh |
#317 | Waverly Solar, LLC | Waverly, VA | 213.2 GWh |
#318 | Escalante Solar II, LLC | Milford, UT | 212.9 GWh |
#319 | Holliday Creek Solar | Fort Dodge, IA | 211.9 GWh |
#321 | Escalante Solar I, LLC | Milford, UT | 211.9 GWh |
#322 | Southampton Solar, LLC | Newsoms, VA | 211.7 GWh |
#323 | Copper Mountain Solar 4, LLC | Boulder City, NV | 211.3 GWh |
#324 | Escalante Solar III, LLC | Milford, UT | 211.0 GWh |
#325 | Coniglio Solar | Wolfe City, TX | 208.6 GWh |
#326 | Utah Red Hills Renewable Energy Park | Parowan, UT | 208.6 GWh |
#327 | Point Beach Solar | Two Creeks, WI | 207.3 GWh |
#328 | Granite Mountain Solar East, LLC | Cedar City, UT | 206.9 GWh |
#329 | Hunter Solar, LLC (CO) | Bennett, CO | 206.8 GWh |
#330 | Solverde 1 | Lancaster, CA | 206.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Happy Solar 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Farmers Electric Cooperative | Newport, AR | 2.2 GWh | 40.1 mi |
Forrest City- Eldridge Road | Forrest City, AR | 2.0 GWh | 49.1 mi |
Forrest City- Prison Site | Forrest City, AR | 1.8 GWh | 50 mi |
Greers Ferry Lake | Heber Springs, AR | 163.4 GWh | 30.8 mi |
Harry L. Oswald | Little Rock, AR | 1.1 TWh | 50.7 mi |
Independence Steam Electric Station | Newark, AR | 5.6 TWh | 38 mi |
Murray | North Little Rock, AR | 113.5 GWh | 47.1 mi |
Newport Solar Project | Newport, AR | 348.0 GWh | 43.7 mi |
NLRED 2MW | North Little Rock, AR | 80.0 MWh | 41.7 mi |
NLRED 5MW | North Little Rock, AR | 2.9 GWh | 41.5 mi |
Quartz Solar, LLC | Wynne, AR | 79.6 GWh | 49.2 mi |
Searcy Solar Hybrid | Searcy, AR | 205.8 GWh | 4.8 mi |
Two Pine Landfill Gas Recovery | North Little Rock, AR | 27.2 GWh | 36.4 mi |
Walnut Bend Solar Station PV | Moro, AR | 132.1 GWh | 39 mi |
White River Lock and Dam 1 | Batesville, AR | 12.6 GWh | 40.8 mi |
White River Lock and Dam 2 | Locust Grove, AR | 12.9 GWh | 40.3 mi |
White River Lock and Dam 3 | Marcella, AR | 25.2 GWh | 47.9 mi |
Woodruff County Solar | Augusta, AR | 135.0 GWh | 19.1 mi |
Woodruff Electric Cooperative | Forrest City, AR | 2.2 GWh | 48 mi |
Zeuber | Little Rock, AR | 7.3 GWh | 45 mi |