Sweetwater Wind 5
7900 FM 608, Roscoe, TX 79545Plant Summary Information
Sweetwater Wind 5 is ranked #196 out of 221 wind farms in Texas in terms of total annual net electricity generation.
Sweetwater Wind 5 generated 41.3 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Sweetwater Wind 5 |
---|---|
Utility Name | Leeward Asset Management, LLC |
Location | Nolan County, TX |
Initial Operation Date | December 2007 |
Last Update | Dec 2024 |
Annual Generation | 163.2 GWh |
Annual Consumption | 602.3 k MMBtu |
Ranked #2,635 out of 12,288 Power Plants Nationwide | |
Ranked #795 out of 1,353 Wind Power Plants Nationwide | |
Ranked #435 out of 788 Texas Power Plants | |
Ranked #196 out of 221 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Infigen Asset Management LLC (2013 to 2014) Leeward Asset Management, LLC (2015 to 2024) |
Map of Sweetwater Wind 5
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sweetwater Wind 5.
Monthly Net Generation for Sweetwater Wind 5
Sweetwater Wind 5 Details
Summary Information | |
---|---|
Plant Name | Sweetwater Wind 5 (56372) |
Plant Address | 7900 FM 608, Roscoe, TX 79545 |
Utility | Leeward Asset Management, LLC (50123) |
Latitude, Longitude | 32.23694, -100.4833 |
Generation Dates on File | Dec 2007 to Dec 2024 |
Initial Operation Date | December 2007 |
Annual Generation | 163.2 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 08-19-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator SW5 Details Operating December 2007
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SWTWN4_WND45 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SWTWN4_WND45 |
Nameplate Capacity | 80.5 MW |
Summer Capacity | 80.5 MW |
Winter Capacity | 80.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2007 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 35 |
Planned New Prime Mover | WT |
Planned Energy Source | WND |
Planned Repower | October 2027 |
Other Planned Modifications | No |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 35 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-2.3-82 VS |
Design Wind Speed | 16.5 MPH |
Wind Quality Class | 1 - High Wind |
Turbine Hub Height Feet | 262.4 |
Sweetwater Wind 5 Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#785 | Busch Ranch II Wind Farm | Walsenburg, CO | 168.4 GWh |
#786 | Woodward Mountain II | Girvin, TX | 168.0 GWh |
#787 | Woodward Mountain I | Girvin, TX | 168.0 GWh |
#788 | Horse Butte Wind I, LLC | Iona, ID | 167.4 GWh |
#789 | Bison I Wind Energy Center | New Salem, ND | 165.9 GWh |
#790 | Scurry County Wind II | Snyder, TX | 164.9 GWh |
#791 | Hardscrabble Wind Power LLC | Little Falls, NY | 163.8 GWh |
#792 | Eurus Combine Hills Turbine Ranch 2 | Milton Freewater, OR | 163.6 GWh |
#793 | Wolverine Creek | Idaho Falls, ID | 163.5 GWh |
#794 | Blue Canyon Windpower VI LLC | Carnegie, OK | 163.5 GWh |
#796 | TPW Petersburg | Petersburg, NE | 162.5 GWh |
#797 | Red Mesa Wind LLC | Seboyeta, NM | 162.1 GWh |
#798 | Whitney Hill Wind Power LLC | Mt.Pulaski, IL | 159.2 GWh |
#799 | Altona | Altona, NY | 157.9 GWh |
#800 | Michigan Wind 1 | Ubly, MI | 157.5 GWh |
#801 | Majestic II Wind | Panhandle, TX | 157.4 GWh |
#802 | Rippey Wind Farm | Grand Junction, IA | 154.4 GWh |
#803 | Spring Canyon | Peetz, CO | 154.4 GWh |
#804 | Latigo Wind Park | Monticello, UT | 151.7 GWh |
#805 | Forward Wind Energy Center | Brownsville, WI | 151.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sweetwater Wind 5.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Buffalo Gap 2 Wind Farm | Merkel, TX | 372.6 GWh | 18.8 mi |
Buffalo Gap 3 Wind Farm | Nolan, TX | 302.2 GWh | 22.7 mi |
Buffalo Gap Wind Farm | Merkel, TX | 179.0 GWh | 25.2 mi |
Champion Wind Farm LLC | Roscoe, TX | 94.9 GWh | 14.7 mi |
Holstein 1 Solar Farm | Wingate, TX | 386.0 GWh | 20.9 mi |
Horse Hollow Wind Energy Center | Wingate, TX | 2.5 TWh | 25 mi |
Inadale Wind Farm LLC Hybrid | Roscoe, TX | 335.1 GWh | 18.8 mi |
Jameson Gas Processing Plant | Silver, TX | 12.9 GWh | 17.8 mi |
Loraine Windpark Project LLC | Loraine, TX | 307.8 GWh | 20.6 mi |
Maryneal Windpower | Maryneal, TX | 569.6 GWh | 2.6 mi |
Mesquite Star | Roscoe, TX | 1.2 TWh | 9.6 mi |
Morgan Creek | Colorado City, TX | 23.5 GWh | 26.2 mi |
Roscoe Wind Farm LLC | Roscoe, TX | 343.2 GWh | 19.3 mi |
South Trent Wind Farm | Sweetwater, TX | 252.5 GWh | 23.8 mi |
Sweetwater Wind 1 LLC | Sweetwater, TX | 140.8 GWh | 12 mi |
Sweetwater Wind 2 LLC | Sweetwater, TX | 340.6 GWh | 10.1 mi |
Sweetwater Wind 3 LLC | Sweetwater, TX | 470.0 GWh | 5.2 mi |
Sweetwater Wind 4 LLC | Roscoe, TX | 636.6 GWh | 5.9 mi |
Trent Wind Farm | Trent, TX | 515.0 GWh | 19.7 mi |
Turkey Track Wind Energy LLC | Blackwell, TX | 300.7 GWh | 12.8 mi |