9630 Orchard Drive, Hanford, CA 93230Plant Summary Information
Hanford 1 and 2 is ranked #449 out of 885 solar farms in California in terms of total annual net electricity generation.
Hanford 1 and 2 generated 749.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Hanford 1 and 2 |
|---|---|
| Utility Name | Arevon Energy, Inc. |
| Location | Kings County, CA |
| Initial Operation Date | August 2014 |
| Last Update | Dec 2025 |
| Annual Generation | 5.2 GWh |
| Annual Consumption | 18.5 k MMBtu |
| Ranked #8,158 out of 13,081 Power Plants Nationwide | |
| Ranked #3,453 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,058 out of 1,606 California Power Plants | |
| Ranked #449 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Sequoia PV 2, LLC (2013 to 2019) CD Arevon USA, Inc. (2020 to 2021) Arevon Energy, Inc. (2022 to 2025) |
Map of Hanford 1 and 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hanford 1 and 2.
Monthly Net Generation for Hanford 1 and 2
Monthly Plant Fuel Consumption for Hanford 1 and 2
Hanford 1 and 2 Details
| Summary Information | |
|---|---|
| Plant Name | Hanford 1 and 2 (59300) |
| Plant Address | 9630 Orchard Drive, Hanford, CA 93230 |
| Utility | Arevon Energy, Inc. (61230) |
| Latitude, Longitude | 36.30667, -119.62917 |
| Generation Dates on File | Aug 2014 to Dec 2025 |
| Initial Operation Date | August 2014 |
| Annual Generation | 5.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF13-559; QF13-561 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator HAN1 Details Operating August 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2014 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 1.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator HAN2 Details Operating August 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2014 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 1.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Hanford 1 and 2 Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3443 | White River Medical Center | Newport, AR | 5.2 GWh |
| #3444 | Woodfin Solar | Asheville, NC | 5.2 GWh |
| #3445 | Randall Road Solar I | Ballston Spa, NY | 5.2 GWh |
| #3446 | Sayreville Solar Project | Sayreville, NJ | 5.2 GWh |
| #3447 | Columbus Solar Project | Columbus, NM | 5.2 GWh |
| #3448 | Westmont 300A | San Pedro, CA | 5.2 GWh |
| #3449 | Wright Cuddyer CSG | St. Michael, MN | 5.2 GWh |
| #3450 | OR - Solops - SPI 18 - Belvedere | Mount Angel, OR | 5.2 GWh |
| #3451 | Peru (MA) | Peru, MA | 5.2 GWh |
| #3452 | Ouchchy PV1 | Mebane, NC | 5.2 GWh |
| #3454 | Meriwether Jackson | Machester, GA | 5.2 GWh |
| #3455 | Putnam Erikson 2 | Eatonton, GA | 5.2 GWh |
| #3456 | Silveira Ranch Road Solar | Novato, CA | 5.2 GWh |
| #3457 | Leicester One MA Solar LLC | Leicester, MA | 5.2 GWh |
| #3458 | Mapleton Community Solar | Mapleton, MN | 5.2 GWh |
| #3459 | Kearsarge Amesbury Hybrid | Amesbury, MA | 5.0 GWh |
| #3460 | Croton Solar | Cortlandt, NY | 5.2 GWh |
| #3461 | Arcadia | Newark, NY | 5.2 GWh |
| #3462 | 4Oaks | Four Oaks, NC | 5.2 GWh |
| #3463 | Dynamic - Gray Solar | Gray, ME | 5.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hanford 1 and 2.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Canal Energy S23, LLC | Hanford, CA | 10.0 GWh | 9.8 mi |
| Corcoran Solar 2 | Corcoran, CA | 46.8 GWh | 11.7 mi |
| Corcoran Solar 3 | Corcoran, CA | 48.1 GWh | 11.1 mi |
| Danell Bros Inc | Hanford, CA | 5.6 GWh | 2.7 mi |
| Dixie Creek Dairy Solar | Hanford, CA | 5.8 GWh | 7.2 mi |
| Double J Dairy Array | Visalia, CA | 8.5 GWh | 12 mi |
| Dover Dairy | Hanford, CA | 2.1 GWh | 8.6 mi |
| Guernsey Solar Station | Hanford, CA | 21.5 GWh | 9.9 mi |
| Hanford Energy Park Peaker | Hanford, CA | 2.5 GWh | 2.7 mi |
| Henrietta Solar Project | Lemoore, CA | 170.4 GWh | 11.6 mi |
| Java Solar, LLC | Lemoore, CA | 22.5 GWh | 11.6 mi |
| Lakeside Pipeline | Hanford, CA | 8.3 GWh | 5 mi |
| Lemoore 1 | Lemoore, CA | 1.4 GWh | 10 mi |
| Lemoore West | Lemoore, CA | 16.7 GWh | 10.7 mi |
| Lone Oak | Hanford, CA | 6.0 GWh | 6.7 mi |
| River Ranch Dairy | Hanford, CA | 995.0 MWh | 4.7 mi |
| Still Water Power | Hanford, CA | 1.5 GWh | 8.6 mi |
| Verwey-Hanford Dairy Digester #1 | Hanford, CA | 3.4 GWh | 8.9 mi |
| Verwey-Hanford Dairy Digester #2 | Hanford, CA | 6.0 GWh | 8.9 mi |
| Verwey-Hanford Dairy Digester #3 | Hanford, CA | 5.6 GWh | 8.9 mi |