Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Huneke II CSG | Terraform Arcadia | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Aug 2018 | Dec 2024 | Solar |
| MSC-GreyCloud01 Community Solar | MSC-GreyCloud01 LLC | St. Paul Park, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Feb 2019 | Dec 2024 | Solar |
| MSC-Scandia01 CSG | MSC-Scandia01 LLC | Scandia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Mar 2019 | Dec 2024 | Solar |
| Goose Lake MN DPC-GM | ENGIE Generation North America LLC | Albert Lea, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Jan 2019 | Dec 2024 | Solar |
| Arbor Hill Wind Farm | MidAmerican Energy Co | Greenfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 TWh | Nov 2018 | Nov 2025 | Wind |
| Staunton | Cypress Creek Renewables | Brazil, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Libra Community Solar | National Grid Renewables | Glenwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Oct 2018 | Dec 2024 | Solar |
| Sagitta Community Solar | National Grid Renewables | Clara City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Canopus Community Solar | National Grid Renewables | Belgrade, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Feb 2019 | Dec 2024 | Solar |
| Auriga Community Solar | National Grid Renewables | Slayton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2018 | Dec 2024 | Solar |
| Acturus Community Solar | National Grid Renewables | Kasota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Aquila Community Solar | National Grid Renewables | Glenwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Feb 2019 | Dec 2024 | Solar |
| Galactic Wind | Galactic Wind | Waunakee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 22.0 GWh | Nov 2012 | Dec 2024 | Wind |
| Becker Solar CSG | SunShare Management | St. Michael, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Feb 2019 | Dec 2024 | Solar |
| Heyer CSG | Heyer CSG LLC | Morristown, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | May 2018 | Dec 2024 | Solar |
| Syncarpha Dodge 1 CSG | Solar Provider Group MN I LLC | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Apr 2019 | Dec 2024 | Solar |
| Hilltop Power | Hilltop Power, LLC | Edgerton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Nov 2008 | Dec 2024 | Wind |
| Bishop Hill III | Invenergy Services LLC | Cambridge, IL | Midcontinent Independent System Operator, Inc. (MISO) | 426.5 GWh | May 2018 | Nov 2025 | Wind |
| USS Brockway Solar CSG | United States Solar Corporation | Sartell, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Dec 2018 | Dec 2024 | Solar |
| Gibbon Solar | Green Street Power Partners | Gibbon, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.8 GWh | May 2019 | Dec 2024 | Solar |
| USS Dubhe Solar CSG | United States Solar Corporation | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Nov 2018 | Dec 2024 | Solar |
| Tipton Solar Park | Indiana Municipal Power Agency | Tipton, IN | Midcontinent Independent System Operator, Inc. (MISO) | 9.1 GWh | Jun 2019 | Dec 2024 | Solar |
| Meadow Lake Wind Farm VI LLC | Meadow Lake Wind Farm VI LLC | Remington, IN | Midcontinent Independent System Operator, Inc. (MISO) | 642.0 GWh | Oct 2018 | Nov 2025 | Wind |
| USS JJ Solar CSG | United States Solar Corporation | Sauk Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2018 | Dec 2024 | Solar |
| USS Nillie Corn Solar CSG | United States Solar Corporation | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Nov 2018 | Dec 2024 | Solar |
| USS Norelius Solar CSG | United States Solar Corporation | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2018 | Dec 2024 | Solar |
| USS Solar Dawn CSG | United States Solar Corporation | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Nov 2018 | Dec 2024 | Solar |
| USS Solar Rapids CSG | United States Solar Corporation | Sauk Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2018 | Dec 2024 | Solar |
| Chisago Holdco LLC, CSG | Chisago Holdco LLC | Center City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Apr 2019 | Dec 2024 | Solar |
| Farmers Electric Cooperative - Kalona | Farmers Electric Coop - (IA) | Kalona, IA | Midcontinent Independent System Operator, Inc. (MISO) | 83.0 MWh | Feb 2001 | Dec 2024 | Distillate Fuel Oil |
| Crawfordsville 3 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 8.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Rollingstone Holdco CSG | Rollingstone Holdco LLC | Rollingstone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.4 GWh | Jul 2019 | Dec 2024 | Solar |
| Sartell Holdco CSG | Sartell Holdco LLC | Sartell, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.9 GWh | Apr 2019 | Dec 2024 | Solar |
| Glaciers Edge Wind Project | EDF Renewable Asset Holdings, Inc. | Cleghorn, IA | Midcontinent Independent System Operator, Inc. (MISO) | 820.5 GWh | Nov 2019 | Nov 2025 | Wind |
| Dearborn Energy Center | DTE Electric Company | Dearborn, MI | Midcontinent Independent System Operator, Inc. (MISO) | 247.3 GWh | Nov 2019 | Dec 2024 | Natural Gas |
| Nautilus Winsted Solar (CSG) | Nautilus Solar Solutions | Winsted, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.4 GWh | Mar 2019 | Nov 2025 | Solar |
| Nautilus Saint Cloud Solar (CSG) | Nautilus Solar Solutions | Saint Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.7 GWh | Mar 2019 | Nov 2025 | Solar |
| Nautilus Lindstrom Solar (CSG) | Nautilus Solar Solutions | Lindstrom, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 GWh | Feb 2019 | Nov 2025 | Solar |
| Polaris Wind Park | DTE Electric Company | North Star Township, MI | Midcontinent Independent System Operator, Inc. (MISO) | 447.3 GWh | Apr 2020 | Nov 2025 | Wind |
| Foxtail Wind, LLC | Foxtail Wind, LLC | Forbes, ND | Midcontinent Independent System Operator, Inc. (MISO) | 627.5 GWh | Dec 2019 | Nov 2025 | Wind |
| USS Kost Trail Solar CSG | Standard Solar | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | May 2019 | Dec 2024 | Solar |
| Crawfordsville 2 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Delta Solar Power II | Delta Solar Power II, LLC | Grand Ledge, MI | Midcontinent Independent System Operator, Inc. (MISO) | 26.3 GWh | Jun 2018 | Dec 2024 | Solar |
| Delta Solar Power I | Delta Solar Power I, LLC | Grand Ledge, MI | Midcontinent Independent System Operator, Inc. (MISO) | 13.6 GWh | May 2018 | Dec 2024 | Solar |
| Rensselaer Solar Site 2 | Indiana Municipal Power Agency | Rensselaer, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.7 GWh | Nov 2018 | Dec 2024 | Solar |
| Becker Solar 2 CSG | SunShare Management | St. Michael, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Feb 2019 | Dec 2024 | Solar |
| Golden Plains | Interstate Power and Light Co | Buffalo Center, IA | Midcontinent Independent System Operator, Inc. (MISO) | 720.0 GWh | Feb 2020 | Nov 2025 | Wind |
| Richland (IA) | Interstate Power and Light Co | Odebolt, IA | Midcontinent Independent System Operator, Inc. (MISO) | 490.4 GWh | Aug 2020 | Nov 2025 | Wind |
| Whispering Willow North | Interstate Power and Light Co | Latimer, IA | Midcontinent Independent System Operator, Inc. (MISO) | 723.6 GWh | Dec 2019 | Nov 2025 | Wind |
| Cornillie | Terraform Arcadia | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Jul 2018 | Dec 2024 | Solar |
| Syncarpha Clara City CSG I (Stamer) | Clara City CSG I, LLC | Clara City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Rantoul Solar | Altorfer Inc. | Rantoul, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 GWh | Nov 2016 | Dec 2024 | Solar |
| Cottage Grove Project CSG | DG Minnesota CSG, LLC | Cottage Grove, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.9 GWh | Sep 2018 | Dec 2024 | Solar |
| USS Lake Patterson Solar CSG | Standard Solar | Cologne, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Jul 2019 | Dec 2024 | Solar |
| Big Lake Project CSG | DG Minnesota CSG, LLC | Big Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.9 GWh | May 2018 | Dec 2024 | Solar |
| IKEA Oak Creek Rooftop PV System | IKEA Property Inc | Oak Creek, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | May 2018 | Dec 2024 | Solar |
| Held Solar Project | DG Minnesota CSG, LLC | Waite Park, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Feb 2019 | Dec 2024 | Solar |
| Stoneray Power Partners, LLC | EDF Renewable Asset Holdings, Inc. | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 371.9 GWh | Jan 2019 | Nov 2025 | Wind |
| USS Webster Solar CSG | Standard Solar | Webster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Apr 2019 | Dec 2024 | Solar |
| USS Centerfield Solar CSG | Standard Solar | Webster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Oct 2019 | Dec 2024 | Solar |
| TAC-Distributed Energy Resource Hybrid | Ameren Illinois | Champaign, IL | Midcontinent Independent System Operator, Inc. (MISO) | 307.0 MWh | Feb 2017 | Dec 2024 | Solar : 63.8% Wind : 36.2% |
| USS Big Lake 1 Solar CSG | United States Solar Corporation | Big Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Nov 2018 | Dec 2024 | Solar |
| Athens MN CONX | SoCore Energy LLC | Athens, MN | Midcontinent Independent System Operator, Inc. (MISO) | 10.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Anoka County MN CONX | SoCore Energy LLC | Ramsey, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.6 GWh | Sep 2018 | Dec 2024 | Solar |
| Hampton MN GRE | SoCore Energy LLC | Hampton Township, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Sep 2018 | Dec 2024 | Solar |
| USS Good Solar CSG | United States Solar Corporation | Stacy, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Nov 2018 | Dec 2024 | Solar |
| USS Kasch Solar CSG | United States Solar Corporation | Sauk Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Sep 2018 | Dec 2024 | Solar |
| USS Rockpoint Solar CSG | United States Solar Corporation | Stacy, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Nov 2018 | Dec 2024 | Solar |
| Cedar Falls Solar Farm | Altus Power America Management, LLC | Cedar Falls, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Mar 2016 | Dec 2024 | Solar |
| Sherburne North Project CSG | MN Solar Community, LLC | St. Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Jun 2018 | Dec 2024 | Solar |
| Corcoran CSG | Altus Power America Management, LLC | Corcoran, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Dec 2018 | Dec 2024 | Solar |
| Chatham | City of Lowell - (MI) | Lowell, MI | Midcontinent Independent System Operator, Inc. (MISO) | 42.0 MWh | Aug 2013 | Dec 2024 | Natural Gas |
| Buffalo Center Wind LLC | Buffalo Center Wind LLC | Little Cedar, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Oct 2011 | Dec 2024 | Wind |
| Rothschild Biomass Cogen Facility | Wisconsin Electric Power Co | Rothschild, WI | Midcontinent Independent System Operator, Inc. (MISO) | 152.8 GWh | Oct 2013 | Dec 2024 | Wood/Wood Waste Solids : 97.4% Natural Gas : 2.6% |
| Echo Wind Park | DTE Electric Company | Elkton, MI | Midcontinent Independent System Operator, Inc. (MISO) | 573.1 GWh | Dec 2013 | Nov 2025 | Wind |
| Windwalkers LLC | Consolidated Edison Development Inc. | Kensett, IA | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 GWh | Aug 2011 | Oct 2024 | Wind |
| Heritage Garden Wind Farm I LLC | DTE Sustainable Generation | Garden, MI | Midcontinent Independent System Operator, Inc. (MISO) | 74.9 GWh | Aug 2012 | Dec 2024 | Wind |
| NCAH Central Utility Plant | National Centers for Animal Health | Ames, IA | Midcontinent Independent System Operator, Inc. (MISO) | 994.0 MWh | May 1996 | Nov 2025 | Natural Gas : 90.0% Distillate Fuel Oil : 10.0% |
| Bishop Hill II Wind Farm | Bishop Hill Energy II, LLC | Cambridge, IL | Midcontinent Independent System Operator, Inc. (MISO) | 339.9 GWh | Sep 2012 | Dec 2024 | Wind |
| Slayton Solar | Ecos Energy LLC | Slayton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2012 | Dec 2024 | Solar |
| Laurel Wind Farm | MidAmerican Energy Co | Laurel, IA | Midcontinent Independent System Operator, Inc. (MISO) | 463.1 GWh | Nov 2011 | Dec 2024 | Wind |
| PCA, Filer City Mill | PCA, Filer City Mill | Filer City, MI | Midcontinent Independent System Operator, Inc. (MISO) | 90.3 GWh | Dec 1949 | Nov 2025 | Natural Gas |
| Anchor Wind, LLC | Acciona Energy USA Global, LLC | Mechanicsville, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.9 GWh | Sep 2012 | May 2024 | Wind |
| Community Wind South | Greenbacker Renewable Energy Corporation | Rushmore, MN | Midcontinent Independent System Operator, Inc. (MISO) | 132.3 GWh | Nov 2012 | Dec 2024 | Wind |
| M. G. Emmett J. Bean Federal Center | U.S. General Services Administration | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 519.0 MWh | Mar 2011 | Dec 2024 | Solar |
| Marshalltown Generating Station | Interstate Power and Light Co | Marshalltown, IA | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 TWh | Mar 2017 | Nov 2025 | Natural Gas : 99.9% |
| Roeder Family Wind Farm LLC | Consolidated Edison Development Inc. | Manly, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Aug 2011 | Dec 2024 | Wind |
| Western Michigan University Power Plant | Western Michigan University | Kalamazoo, MI | Midcontinent Independent System Operator, Inc. (MISO) | 70.4 GWh | Jul 1997 | Dec 2024 | Natural Gas |
| Otter Creek Ethanol Poet - Ashton | Otter Creek Ethanol LLC - Poet Ashton | Ashton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 44.9 GWh | Feb 2004 | Nov 2025 | Natural Gas |
| SABIC Innovative Plastics Mt. Vernon | SABIC IP Mt. Vernon, LLC | Mount Vernon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 469.9 GWh | May 1996 | Nov 2025 | Natural Gas |
| Tuscola Bay Wind | Tuscola Bay Wind LLC | Reese, MI | Midcontinent Independent System Operator, Inc. (MISO) | 359.0 GWh | Nov 2012 | Nov 2025 | Wind |
| Battle Creek Mill | RockTenn-Battle Creek Mill | Battle Creek, MI | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Dec 1950 | Dec 2024 | Natural Gas |
| International Paper Red River Mill | Red River Mill Intl Paper Company | Campti, LA | Midcontinent Independent System Operator, Inc. (MISO) | 370.6 GWh | Nov 2008 | Dec 2023 | Black Liquor : 64.7% Wood/Wood Waste Solids : 22.1% Natural Gas : 13.2% |
| The Andersons Albion Ethanol LLC | The Andersons Albion Ethanol LLC | Albion, MI | Midcontinent Independent System Operator, Inc. (MISO) | 63.4 GWh | Jul 2006 | Dec 2024 | Natural Gas |
| Lake Charles Plant | Rain CII Carbon LLC | Sulphur, LA | Midcontinent Independent System Operator, Inc. (MISO) | 114.8 GWh | Nov 2012 | Oct 2025 | Waste Heat |
| POET Biorefining Lake Crystal | POET Biorefining Lake Crystal | Lake Crystal, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.9 GWh | Mar 2005 | Nov 2025 | Natural Gas : 84.2% Distillate Fuel Oil : 15.8% |
| Cargill Salt Hersey | Cargill Salt Hersey | Hersey, MI | Midcontinent Independent System Operator, Inc. (MISO) | 318.2 MWh | Aug 1998 | Dec 2023 | Natural Gas |
| MSC Sebewaing | Michigan Sugar Company | Sebewaing, MI | Midcontinent Independent System Operator, Inc. (MISO) | 493.7 MWh | Sep 1979 | Nov 2025 | Bituminous Coal : 66.2% Natural Gas : 33.8% |
| Cashton Greens Wind Farm | Cashton Greens Wind Farm LLC | Cashton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 10.7 GWh | Apr 2012 | Dec 2024 | Wind |
| Bos Dairy, LLC | Bos Dairy, LLC | Fair Oaks, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 GWh | Dec 2004 | Dec 2024 | Natural Gas |
Summary of Power Plants By State
Figures are based on November 2025 generation numbers.| State | Rank | Active Plants | Nov 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 11,511.20 GWh |
| Alaska | # 48 | 144 | 528.08 GWh |
| Arizona | # 13 | 184 | 8,245.57 GWh |
| Arkansas | # 24 | 116 | 5,216.59 GWh |
| California | # 4 | 1,736 | 15,288.71 GWh |
| Colorado | # 29 | 302 | 4,252.83 GWh |
| Connecticut | # 34 | 166 | 3,697.17 GWh |
| Delaware | # 49 | 33 | 425.33 GWh |
| District of Columbia | # 51 | 16 | 14.43 GWh |
| Florida | # 2 | 323 | 18,667.27 GWh |
| Georgia | # 8 | 262 | 11,183.00 GWh |
| Hawaii | # 47 | 73 | 801.36 GWh |
| Idaho | # 43 | 146 | 1,663.41 GWh |
| Illinois | # 5 | 384 | 14,942.91 GWh |
| Indiana | # 15 | 211 | 7,722.21 GWh |
| Iowa | # 19 | 293 | 6,283.14 GWh |
| Kansas | # 32 | 187 | 4,136.03 GWh |
| Kentucky | # 21 | 60 | 5,370.35 GWh |
| Louisiana | # 12 | 86 | 8,259.66 GWh |
| Maine | # 45 | 216 | 1,300.62 GWh |
| Maryland | # 40 | 203 | 2,568.19 GWh |
| Massachusetts | # 41 | 648 | 1,975.71 GWh |
| Michigan | # 9 | 273 | 10,785.64 GWh |
| Minnesota | # 28 | 765 | 4,723.22 GWh |
| Mississippi | # 23 | 57 | 5,274.88 GWh |
| Missouri | # 22 | 128 | 5,368.91 GWh |
| State | Rank | Active Plants | Nov 2025 Generation |
|---|---|---|---|
| Montana | # 39 | 71 | 2,609.34 GWh |
| Nebraska | # 35 | 129 | 3,447.15 GWh |
| Nevada | # 38 | 114 | 3,066.88 GWh |
| New Hampshire | # 44 | 60 | 1,466.90 GWh |
| New Jersey | # 27 | 393 | 4,952.95 GWh |
| New Mexico | # 36 | 144 | 3,313.38 GWh |
| New York | # 10 | 956 | 10,414.21 GWh |
| North Carolina | # 11 | 909 | 9,927.17 GWh |
| North Dakota | # 33 | 61 | 3,714.56 GWh |
| Ohio | # 6 | 198 | 11,688.48 GWh |
| Oklahoma | # 18 | 143 | 6,525.64 GWh |
| Oregon | # 20 | 275 | 5,407.05 GWh |
| Pennsylvania | # 3 | 256 | 17,277.29 GWh |
| Rhode Island | # 46 | 100 | 833.56 GWh |
| South Carolina | # 16 | 208 | 7,560.03 GWh |
| South Dakota | # 42 | 52 | 1,785.37 GWh |
| Tennessee | # 26 | 88 | 5,030.87 GWh |
| Texas | # 1 | 955 | 43,514.30 GWh |
| Utah | # 37 | 125 | 3,174.08 GWh |
| Vermont | # 50 | 117 | 164.43 GWh |
| Virginia | # 17 | 239 | 7,087.47 GWh |
| Washington | # 14 | 137 | 7,966.23 GWh |
| West Virginia | # 31 | 39 | 4,211.99 GWh |
| Wisconsin | # 25 | 250 | 5,195.24 GWh |
| Wyoming | # 30 | 71 | 4,237.64 GWh |