Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| GEN005 Antibody Fuel Cell | 2016 ESA Project Company, LLC | Oceanside, CA | California Independent System Operator (CISO) | 19.5 GWh | Mar 2019 | Dec 2025 | Natural Gas |
| Genentech-Oceanside Hybrid | Tesla Inc. | Oceanside, CA | California Independent System Operator (CISO) | 6.1 GWh | Mar 2016 | Dec 2025 | Solar |
| Gilead Oceanside Solar Project | Gilead Sciences Inc. | Oceanside, CA | California Independent System Operator (CISO) | 952.0 MWh | Nov 2021 | Dec 2025 | Solar |
| CSD 2- Freedom High | CleanCapital Holdings | Oakley, CA | California Independent System Operator (CISO) | 1.3 GWh | Jul 2013 | Dec 2025 | Solar |
| California PV Energy at ISD WWTP | California PV Energy LLC | Oakley, CA | California Independent System Operator (CISO) | 1.9 GWh | Jul 2014 | Dec 2025 | Solar |
| Oakley Solar Project | Oakley Solar Project LLC | Oakley, CA | California Independent System Operator (CISO) | 2.1 GWh | May 2013 | Dec 2025 | Solar |
| Power Generation Station (PGS) 2 | East Bay Municipal Util Dist - (CA) | Oakland, CA | California Independent System Operator (CISO) | 20.3 GWh | Nov 2011 | Dec 2025 | Other Biomass Gas |
| WWTP Power Generation Station | East Bay Municipal Util Dist - (CA) | Oakland, CA | California Independent System Operator (CISO) | 31.4 GWh | Jul 1985 | Aug 2026 | Other Biomass Gas : 99.0% Distillate Fuel Oil : 1.0% |
| Dynegy Oakland Power Plant | Dynegy Oakland, LLC | Oakland, CA | California Independent System Operator (CISO) | 775.0 MWh | Oct 1978 | Aug 2026 | Jet Fuel |
| Robert O Schulz Solar Farm | South San Joaquin Irr District | Oakdale, CA | California Independent System Operator (CISO) | 3.9 GWh | Apr 2008 | Dec 2025 | Solar |
| Frankenheimer Power Plant | Turlock Irrigation District | Oakdale, CA | California Independent System Operator (CISO) | 11.3 GWh | Feb 1983 | Dec 2025 | Water |
| Waste Mangement Redwood LFGTE | WM Renewable Energy LLC | Novato, CA | California Independent System Operator (CISO) | 21.8 GWh | Apr 2017 | Dec 2025 | Landfill Gas |
| Silveira Ranch Road Solar | Silveira Ranch Road Solar | Novato, CA | California Independent System Operator (CISO) | 5.2 GWh | Feb 2021 | Dec 2025 | Solar |
| Cottonwood Solar, LLC Cottonwood Carport | Onward Energy | Novato, CA | California Independent System Operator (CISO) | 1.1 GWh | Apr 2016 | Dec 2025 | Solar |
| Center Hybrid | Southern California Edison Co | Norwalk, CA | California Independent System Operator (CISO) | 2.0 GWh | Aug 2007 | Dec 2025 | Natural Gas |
| 8500 Balboa PV, LLC | 8500 Balboa PV, LLC | Northridge, CA | Los Angeles Department of Water and Power (LDWP) | 3.3 GWh | Jan 2022 | Dec 2025 | Solar |
| CSU Northridge Plant | California State University, Northridge | Northridge, CA | Los Angeles Department of Water and Power (LDWP) | 1.6 GWh | Nov 2001 | Dec 2025 | Solar |
| Karen Avenue Wind Farm | San Gorgonio Farms Inc | North Palm Springs, CA | California Independent System Operator (CISO) | 26.0 GWh | Dec 1984 | Dec 2025 | Wind |
| San Gorgonio Windplant WPP1993 | FPL Energy Operating Services, Inc. | North Palm Springs, CA | California Independent System Operator (CISO) | 191.9 GWh | Nov 2011 | Dec 2025 | Wind |
| Mountain View III | Avangrid Power LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 80.7 GWh | Nov 2003 | Dec 2025 | Wind |
| Salka Cabazon Wind | Salka Cabazon Wind LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 12.8 GWh | Dec 1998 | Dec 2025 | Wind |
| Phoenix Wind Power LLC | Avangrid Power LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 4.7 GWh | May 1999 | Dec 2025 | Wind |
| Indigo Energy Facility | Diamond Generating Corporation | North Palm Springs, CA | California Independent System Operator (CISO) | 6.2 GWh | Jun 2001 | Dec 2025 | Natural Gas |
| Mesa Wind Power LLC | Mesa Wind Power LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 116.7 GWh | Oct 1984 | Aug 2026 | Wind |
| Garnet Wind Energy Center | Terra-Gen Operating Co-Wind | North Palm Springs, CA | California Independent System Operator (CISO) | 16.8 GWh | May 2009 | Dec 2025 | Wind |
| Mountain View IV | AES Distributed Energy | North Palm Springs, CA | California Independent System Operator (CISO) | 172.7 GWh | Jan 2012 | Dec 2025 | Wind |
| Whitewater Hill Wind Partners | Shell Wind Energy Inc. | North Palm Springs, CA | California Independent System Operator (CISO) | 126.6 GWh | Sep 2002 | Dec 2025 | Wind |
| Dillon Wind LLC | Avangrid Power LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 138.3 GWh | Mar 2008 | Dec 2025 | Wind |
| Mountain View I & II | AES Distributed Energy | North Palm Springs, CA | California Independent System Operator (CISO) | 246.8 GWh | May 2001 | Aug 2026 | Wind |
| San Gorgonio Westwinds II LLC | Terra-Gen Operating Co-Wind | North Palm Springs, CA | California Independent System Operator (CISO) | 122.6 GWh | May 1999 | Dec 2025 | Wind |
| VA Sepulveda Ambulatory Care Center | VA Sepulveda Ambulatory Care Center | North Hills, CA | Los Angeles Department of Water and Power (LDWP) | 3.8 GWh | Sep 2014 | Dec 2025 | Solar |
| A G Wishon | Pacific Gas & Electric Co. | North Fork, CA | California Independent System Operator (CISO) | 24.1 GWh | Aug 1910 | Oct 2025 | Water |
| Mammoth Pool | Southern California Edison Co | North Fork, CA | California Independent System Operator (CISO) | 583.8 GWh | Feb 1960 | Aug 2026 | Water |
| Big Creek 4 | Southern California Edison Co | North Fork, CA | California Independent System Operator (CISO) | 405.3 GWh | May 1951 | Aug 2026 | Water |
| Donnells | Oakdale&South San Joaquin Irrigation D. | None, CA | California Independent System Operator (CISO) | 233.4 GWh | May 1957 | Dec 2025 | Water |
| Beardsley | Oakdale&South San Joaquin Irrigation D. | None, CA | California Independent System Operator (CISO) | 56.4 GWh | Apr 1957 | Dec 2025 | Water |
| Ivanpah 2 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 227.5 GWh | Nov 2013 | Aug 2026 | Solar : 98.7% Natural Gas : 1.3% |
| Ivanpah 1 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 189.8 GWh | Nov 2013 | Aug 2026 | Solar : 95.6% Natural Gas : 4.4% |
| Ivanpah 3 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 178.8 GWh | Nov 2013 | Aug 2026 | Solar : 97.4% Natural Gas : 2.6% |
| Stateline Solar | Southern Power Co | Nipton, CA | California Independent System Operator (CISO) | 640.1 GWh | Nov 2015 | Dec 2025 | Solar |
| Imperial Valley Solar Co (IVSC) 2, LLC | Onward Energy | Niland, CA | Imperial Irrigation District (IID) | 43.9 GWh | May 2015 | Dec 2025 | Solar |
| Wister Solar | Wister Solar | Niland, CA | Imperial Irrigation District (IID) | 33.0 GWh | Jun 2022 | Dec 2025 | Solar |
| Imperial Valley Solar Company 1 LLC | Imperial Irrigation District | Niland, CA | Imperial Irrigation District (IID) | 33.1 GWh | May 2012 | Dec 2025 | Solar |
| Niland Gas Turbine Plant | Imperial Irrigation District | Niland, CA | Imperial Irrigation District (IID) | 35.0 GWh | May 2008 | Dec 2025 | Natural Gas |
| Hoag Hospital Cogen Plant | Hoag Memorial Presbyterian Hospital | Newport Beach, CA | California Independent System Operator (CISO) | 27.4 GWh | Jun 2006 | Aug 2026 | Natural Gas |
| Frontier Solar LLC | Boralex US Operations LLC | Newman, CA | California Independent System Operator (CISO) | 47.9 GWh | May 2016 | Dec 2025 | Solar |
| Central 40 | Central 40, LLC | Newman, CA | California Independent System Operator (CISO) | 71.7 GWh | Jan 2021 | Aug 2026 | Solar |
| SEPV Cuyama Hybrid | SEPV Cuyama, LLC | New Cuyama, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2023 | Dec 2025 | Solar |
| Deer Creek PH | Nevada Irrigation District | Nevada City, CA | California Independent System Operator (CISO) | 15.2 GWh | Apr 1908 | Dec 2025 | Water |
| Scott Flat | Nevada Irrigation District | Nevada City, CA | California Independent System Operator (CISO) | 3.8 GWh | Jan 1985 | Oct 2025 | Water |
| Bowman | Nevada Irrigation District | Nevada City, CA | California Independent System Operator (CISO) | 14.2 GWh | Aug 1986 | Dec 2025 | Water |
| Kaiser Napa Valley Corporate Dr Fuel Cel | 2016 ESA Project Company, LLC | Napa, CA | California Independent System Operator (CISO) | 39.0 GWh | May 2017 | Dec 2025 | Natural Gas |
| Soscol Ferry Solar | Soscol Ferry Solar | Napa, CA | California Independent System Operator (CISO) | 4.5 GWh | Nov 2020 | Dec 2025 | Solar |
| Muck Valley Hydroelectric | Malacha Hydro Limited Partnership | NA, CA | California Independent System Operator (CISO) | 89.8 GWh | Nov 1988 | Dec 2025 | Water |
| Grizzly | City of Santa Clara - (CA) | N/A, CA | California Independent System Operator (CISO) | 43.3 GWh | Oct 1993 | Dec 2025 | Water |
| RCWD PV Project | MN8 Energy LLC | Murrieta, CA | California Independent System Operator (CISO) | 8.3 GWh | May 2016 | Dec 2025 | Solar |
| Murphys | Utica Water & Power Authority | Murphys, CA | California Independent System Operator (CISO) | 14.8 GWh | Feb 1954 | Dec 2025 | Water |
| Spicer Meadow Project | Northern California Power Agny | Murphys, CA | California Independent System Operator (CISO) | 14.4 GWh | Oct 1989 | Dec 2025 | Water |
| Collierville Powerhouse | Northern California Power Agny | Murphys, CA | California Independent System Operator (CISO) | 418.3 GWh | Oct 1989 | Aug 2026 | Water |
| Box Canyon Dam | Siskiyou Power Authority | Mount Shasta, CA | PacifiCorp West (PACW) | 22.5 GWh | May 1986 | Dec 2025 | Water |
| Dynegy Moss Landing Power Plant Hybrid | Dynegy -Moss Landing LLC | Moss Landing, CA | California Independent System Operator (CISO) | 2.6 TWh | Nov 1967 | Aug 2026 | Natural Gas |
| SunEdison Walgreens Moreno Valley | SunE WG113 Moreno Valley LLC | Moreno Valley, CA | California Independent System Operator (CISO) | 599.0 MWh | Aug 2007 | Dec 2025 | Solar |
| EMWD - Moreno Valley RWRF | SkyHigh 2 Solar | Moreno Valley, CA | California Independent System Operator (CISO) | 5.1 GWh | Jun 2021 | Dec 2025 | Solar |
| CA - Ventura Co CCD - Moorpark College | Forefront Power, LLC | Moorpark, CA | California Independent System Operator (CISO) | 4.5 GWh | Jul 2023 | Dec 2025 | Solar |
| Pit 6 | Pacific Gas & Electric Co. | Montgomery Creek, CA | California Independent System Operator (CISO) | 262.5 GWh | Jul 1965 | Dec 2025 | Water |
| Pit 7 | Pacific Gas & Electric Co. | Montgomery Creek, CA | California Independent System Operator (CISO) | 366.3 GWh | Aug 1965 | Aug 2026 | Water |
| Hatchet Creek Project | Mega Renewables | Montgomery Creek, CA | California Independent System Operator (CISO) | 21.8 GWh | Nov 1986 | Dec 2025 | Water |
| Roaring Creek Water Power | Shasta Hydroelectric Inc | Montgomery Creek, CA | California Independent System Operator (CISO) | 6.0 GWh | Nov 1986 | Dec 2025 | Water |
| Montgomery Creek Hydro | Central Rivers Power US, LLC | Montgomery Creek, CA | California Independent System Operator (CISO) | 9.2 GWh | Dec 1986 | Dec 2025 | Water |
| GreenStruxure BBU004, LLC | ClearGen LLC | Montebello, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2023 | Dec 2025 | Solar |
| Edwards Sanborn E1A | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 311.8 GWh | Jul 2022 | Aug 2026 | Solar |
| Edwards Sanborn S3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 80.0 GWh | Feb 2022 | Aug 2026 | Solar |
| Edwards Sanborn S1 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 94.0 GWh | Feb 2022 | Aug 2026 | Solar |
| Edwards Sanborn 1C | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 339.3 GWh | Oct 2025 | Aug 2026 | Solar |
| Bellefield Solar and Energy Storage Farm | 50LW 8me LLC | Mojave, CA | California Independent System Operator (CISO) | 840.2 GWh | Nov 2025 | Aug 2026 | Solar |
| Oasis Alta | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 49.3 GWh | Mar 2021 | Dec 2025 | Wind |
| Edwards Sanborn E2 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 289.4 GWh | Nov 2021 | Aug 2026 | Solar |
| Edwards Sanborn E3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 57.7 GWh | Nov 2021 | Aug 2026 | Solar |
| Edwards Sanborn S4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 93.5 GWh | Oct 2022 | Aug 2026 | Solar |
| Edwards Sanborn E4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 329.4 GWh | Nov 2022 | Aug 2026 | Solar |
| Edwards Sanborn E5 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 151.4 GWh | Nov 2022 | Aug 2026 | Solar |
| CalPortland Company Mojave Wind | CalPortland Company | Mojave, CA | California Independent System Operator (CISO) | 24.4 GWh | Oct 2024 | Dec 2025 | Wind |
| Edwards Sanborn E1B | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 347.9 GWh | Oct 2022 | Aug 2026 | Solar |
| Alta Wind Energy Center V | Alta Wind V, LLC | Mojave, CA | California Independent System Operator (CISO) | 253.7 GWh | Mar 2011 | Dec 2025 | Wind |
| Pinyon Pine II | Pinyon Pines Wind II, LLC | Mojave, CA | California Independent System Operator (CISO) | 204.3 GWh | Oct 2012 | Dec 2025 | Wind |
| Alta Wind Energy Center IV | Alta Wind IV, LLC | Mojave, CA | California Independent System Operator (CISO) | 167.5 GWh | Mar 2011 | Dec 2025 | Wind |
| Alta Wind Energy Center III | Alta Wind III, LLC | Mojave, CA | California Independent System Operator (CISO) | 318.3 GWh | Jan 2011 | Dec 2025 | Wind |
| Pinyon Pine I | Pinyon Pines Wind I, LLC | Mojave, CA | California Independent System Operator (CISO) | 283.1 GWh | Oct 2012 | Dec 2025 | Wind |
| Alta Wind VIII | Nextera Energy Resources | Mojave, CA | California Independent System Operator (CISO) | 219.2 GWh | Dec 2011 | Dec 2025 | Wind |
| Alta Wind Energy Center II | Alta Wind II, LLC | Mojave, CA | California Independent System Operator (CISO) | 318.3 GWh | Dec 2010 | Dec 2025 | Wind |
| Alta Wind Energy Center I | Alta Wind I, LLC | Mojave, CA | California Independent System Operator (CISO) | 399.8 GWh | Dec 2010 | Dec 2025 | Wind |
| TPC Windfarms LLC | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 42.1 GWh | Nov 1986 | Dec 2025 | Wind |
| Oasis Wind | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 221.1 GWh | Nov 2004 | Dec 2025 | Wind |
| Mojave 16/17/18 | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 66.3 GWh | Nov 1989 | Dec 2025 | Wind |
| Oak Creek Energy Systems I | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 57.3 GWh | May 1982 | Dec 2025 | Wind |
| Rising Tree Wind Farm | Rising Tree Wind Farm LLC | Mojave, CA | California Independent System Operator (CISO) | 250.4 GWh | Dec 2014 | Dec 2025 | Wind |
| Ridgetop Energy LLC | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 24.5 GWh | Dec 1983 | Dec 2025 | Wind |
| Difwind Farms Ltd VI | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 12.6 GWh | Dec 1986 | Dec 2025 | Wind |
| Cameron Ridge LLC | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 148.0 GWh | Nov 1984 | Dec 2025 | Wind |
| Mustang Hills LLC | Mustang Hills, LLC (Longroad) | Mojave, CA | California Independent System Operator (CISO) | 267.1 GWh | Apr 2012 | Dec 2025 | Wind |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 28.8 GWh |
| Tehama County, CA | # 51 | 7 | 45.8 GWh |
| Napa County, CA | # 50 | 11 | 51.2 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.7 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 80.3 GWh |
| San Mateo County, CA | # 46 | 11 | 133.1 GWh |
| Yolo County, CA | # 45 | 15 | 196.6 GWh |
| Nevada County, CA | # 44 | 12 | 225.7 GWh |
| San Benito County, CA | # 43 | 6 | 266.2 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 292.9 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 450.0 GWh |
| Trinity County, CA | # 38 | 5 | 480.6 GWh |
| Merced County, CA | # 37 | 33 | 493.1 GWh |
| Calaveras County, CA | # 36 | 6 | 524.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 608.6 GWh |
| Ventura County, CA | # 33 | 33 | 719.4 GWh |
| Lake County, CA | # 32 | 10 | 892.8 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 29 | 1.2 TWh |
| Yuba County, CA | # 29 | 5 | 1.5 TWh |
| El Dorado County, CA | # 28 | 15 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| San Joaquin County, CA | # 27 | 53 | 1.6 TWh |
| Tulare County, CA | # 26 | 72 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.8 TWh |
| Placer County, CA | # 24 | 26 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Orange County, CA | # 21 | 59 | 2.6 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.7 TWh |
| Alameda County, CA | # 19 | 52 | 2.8 TWh |
| Tuolumne County, CA | # 18 | 23 | 2.9 TWh |
| Monterey County, CA | # 17 | 29 | 3.0 TWh |
| Solano County, CA | # 16 | 41 | 3.0 TWh |
| Santa Clara County, CA | # 15 | 76 | 3.4 TWh |
| Butte County, CA | # 14 | 25 | 3.5 TWh |
| Kings County, CA | # 13 | 59 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.0 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 68 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.0 TWh |
| Fresno County, CA | # 8 | 128 | 7.8 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 212 | 11.8 TWh |
| Contra Costa County, CA | # 5 | 59 | 11.8 TWh |
| Riverside County, CA | # 4 | 165 | 14.0 TWh |
| Los Angeles County, CA | # 3 | 325 | 17.3 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Kern County, CA | # 1 | 333 | 35.3 TWh |