Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Pastoria Solar | Pastoria Solar Energy Company, LLC | Lebec, CA | California Independent System Operator (CISO) | 61.3 GWh | - | Aug 2026 | Solar |
| Zonneveld Oak Grove | Renewable Solar, Inc | Laton, CA | California Independent System Operator (CISO) | 388.0 MWh | May 2024 | Dec 2025 | Solar |
| Lancaster Little Rock | AES Distributed Energy | Landers, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2014 | Dec 2025 | Solar |
| Radiance Solar 4 | Altus Power America Management, LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2013 | Dec 2025 | Solar |
| Radiance Solar 5 | Altus Power America Management, LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.9 GWh | Jun 2013 | Dec 2025 | Solar |
| Lancaster Solar 1 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2014 | Dec 2025 | Solar |
| Lancaster Solar 2 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2014 | Dec 2025 | Solar |
| Antelope Expansion 3A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 40.2 GWh | May 2021 | Dec 2025 | Solar |
| Bayshore Solar A, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 44.4 GWh | Nov 2017 | Dec 2025 | Solar |
| Bayshore Solar C, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 40.6 GWh | Nov 2017 | Dec 2025 | Solar |
| Bayshore Solar B, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 41.7 GWh | Nov 2017 | Dec 2025 | Solar |
| Vinam | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.0 GWh | Jun 2013 | Dec 2025 | Solar |
| Rodeo Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.6 GWh | Apr 2014 | Dec 2025 | Solar |
| Lancaster Dry Farm Ranch B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 10.0 GWh | Oct 2014 | Dec 2025 | Solar |
| Portal Ridge Solar C, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 28.6 GWh | Jan 2017 | Dec 2025 | Solar |
| Portal Ridge Solar B, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 52.7 GWh | Jan 2017 | Dec 2025 | Solar |
| Central Antelope Dry Ranch B LLC | Central Antelope Dry Ranch B, LLC | Lancaster, CA | California Independent System Operator (CISO) | 6.0 GWh | Aug 2017 | Dec 2025 | Solar |
| Summer Solar LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 55.9 GWh | Jun 2016 | Dec 2025 | Solar |
| Antelope Big Sky Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 49.9 GWh | Jul 2016 | Dec 2025 | Solar |
| Foundation CDCR LAC | Foundation CA Fund VIII Manager, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2017 | Dec 2025 | Wind |
| Summer North Solar | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 13.1 GWh | Nov 2014 | Dec 2025 | Solar |
| Green Beanworks B PV | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 6.0 GWh | Nov 2018 | Dec 2025 | Solar |
| Antelope DSR 3 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 55.1 GWh | Aug 2019 | Dec 2025 | Solar |
| Antelope Expansion 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 204.4 GWh | Nov 2018 | Aug 2026 | Solar |
| Summer Solar D2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 2.0 GWh | Jun 2014 | Dec 2025 | Solar |
| Summer Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.3 GWh | May 2014 | Dec 2025 | Solar |
| Summer Solar B2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.1 GWh | May 2014 | Dec 2025 | Solar |
| Gaskell West 1 Solar Facility | Southern Power Co | Lancaster, CA | California Independent System Operator (CISO) | 55.6 GWh | Feb 2018 | Dec 2025 | Solar |
| Summer Solar A2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 2.7 GWh | May 2014 | Dec 2025 | Solar |
| Rodeo Solar D2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.5 GWh | Apr 2014 | Dec 2025 | Solar |
| Division 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 2.5 GWh | May 2014 | Dec 2025 | Solar |
| Division 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.9 GWh | May 2014 | Dec 2025 | Solar |
| Division 3 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.1 GWh | May 2014 | Dec 2025 | Solar |
| Kettering Solar 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Nov 2025 | Solar |
| Kettering Solar 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.5 GWh | May 2014 | Nov 2025 | Solar |
| Horn | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.7 GWh | Sep 2013 | Dec 2025 | Solar |
| Western Antelope Blue Sky Ranch A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 43.0 GWh | Oct 2014 | Dec 2025 | Solar |
| Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 12.6 GWh | May 2021 | Dec 2025 | Solar |
| Ma | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 1.8 GWh | Sep 2013 | Dec 2025 | Solar |
| Elevation Solar C | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 105.0 GWh | Nov 2016 | Aug 2026 | Solar |
| Antelope Expansion 1B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 46.6 GWh | Oct 2022 | Dec 2025 | Solar |
| US-TOPCO (Soccer Center) | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2016 | Dec 2025 | Solar |
| AVS Lancaster 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 5.6 GWh | Nov 2016 | Dec 2025 | Solar |
| TA-High Desert LLC | TA-High Desert LLC | Lancaster, CA | California Independent System Operator (CISO) | 57.9 GWh | Feb 2013 | Dec 2025 | Solar |
| Lancaster WAD B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 7.2 GWh | Mar 2017 | Dec 2025 | Solar |
| TA-Acacia, LLC | Onward Energy | Lancaster, CA | California Independent System Operator (CISO) | 48.3 GWh | Oct 2014 | Dec 2025 | Solar |
| Solverde 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 195.0 GWh | Nov 2016 | Aug 2026 | Solar |
| Lancaster Baptist Church | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2011 | Dec 2025 | Solar |
| Lancaster | Clean Focus Yield, LLC | Lancaster, CA | California Independent System Operator (CISO) | 7.6 GWh | Oct 2018 | Dec 2025 | Solar |
| Antelope DSR 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 114.3 GWh | Nov 2016 | Aug 2026 | Solar |
| Antelope DSR 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 14.0 GWh | Nov 2016 | Dec 2025 | Solar |
| Western Antelope Dry Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 26.2 GWh | Nov 2016 | Dec 2025 | Solar |
| San Pablo Raceway | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 192.5 GWh | Jul 2019 | Aug 2026 | Solar |
| Sierra Solar Greenworks | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 41.2 GWh | Oct 2015 | Dec 2025 | Solar |
| North Lancaster Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 38.6 GWh | Nov 2016 | Dec 2025 | Solar |
| Morgan Lancaster 1 | Terraform Arcadia | Lancaster, CA | California Independent System Operator (CISO) | 818.0 MWh | Aug 2015 | Dec 2025 | Solar |
| Central Antelope Dry Ranch C | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 38.9 GWh | Apr 2016 | Dec 2025 | Solar |
| Western Antelope Blue Sky B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 52.2 GWh | Nov 2016 | Dec 2025 | Solar |
| AV Solar Ranch One | AV Solar Ranch 1 LLC | Lancaster, CA | California Independent System Operator (CISO) | 553.5 GWh | Jul 2014 | Aug 2026 | Solar |
| Alpine Solar | Alpine BESS LLC | Lancaster, CA | California Independent System Operator (CISO) | 114.1 GWh | Jan 2013 | Dec 2025 | Solar |
| Estrella Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 155.3 GWh | Nov 2023 | Aug 2026 | Solar |
| SEPV Sierra | SEPV Sierra, LLC | Lancaster, CA | California Independent System Operator (CISO) | 5.4 GWh | Mar 2020 | Dec 2025 | Solar |
| CSP Los Angeles | Ecoplexus, Inc | Lancaster, CA | California Independent System Operator (CISO) | 5.7 GWh | Sep 2022 | Dec 2025 | Solar |
| Raceway Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 351.4 GWh | Apr 2024 | Aug 2026 | Solar |
| Portal | Southern California Edison Co | Lakeshore, CA | California Independent System Operator (CISO) | 26.2 GWh | Nov 1956 | Dec 2025 | Water |
| Slate Creek | Central Rivers Power US, LLC | Lakehead, CA | PacifiCorp West (PACW) | 12.2 GWh | Apr 1990 | Dec 2025 | Water |
| MM Lopez Energy | MM Lopez Energy LLC | Lake View Terrace, CA | California Independent System Operator (CISO) | 25.8 GWh | Nov 1998 | Dec 2025 | Landfill Gas |
| Isabella Hydro Project | Isabella Partners | Lake Isabella, CA | California Independent System Operator (CISO) | 32.1 GWh | Nov 1990 | Dec 2025 | Water |
| Lake Elsinore Canopies - Lakeside HS | Standard Solar | Lake Elsinore, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2022 | Dec 2025 | Solar |
| Gilead Sciences La Verne Rooftop Solar | Gilead Sciences, Inc. - La Verne | La Verne, CA | California Independent System Operator (CISO) | 2.5 GWh | Jun 2021 | Dec 2025 | Solar |
| Weymouth Solar Plant | Metropolitan Water District of S CA | La Verne, CA | California Independent System Operator (CISO) | 3.3 GWh | May 2016 | Dec 2025 | Solar |
| Staples La Mirada, CA | SunE WF3-ST Holdings, LLC | La Mirada, CA | California Independent System Operator (CISO) | 1.5 GWh | Feb 2009 | Dec 2025 | Solar |
| Biola University Hybrid | Biola University | La Mirada, CA | California Independent System Operator (CISO) | 13.6 GWh | Mar 1990 | Aug 2026 | Natural Gas |
| Grossmont Hospital | Sharp Grossmont Hospital | La Mesa, CA | California Independent System Operator (CISO) | 29.2 GWh | Jul 1983 | Dec 2025 | Natural Gas |
| PFMG Solar Grossmont Helix LLC | Altus Power America Management, LLC | La Mesa, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2018 | Dec 2025 | Solar |
| Univ of California San Diego Solar | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2008 | Dec 2025 | Solar |
| University of California San Diego Hybri | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 225.8 GWh | Jun 2001 | Aug 2026 | Natural Gas |
| Kroger La Habra | Ralph's Grocery Company | La Habra, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 2020 | Dec 2024 | Solar |
| Upper Dawson | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 8.9 GWh | Oct 1983 | Dec 2025 | Water |
| La Grange | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 6.6 GWh | Nov 1924 | Dec 2025 | Water |
| Don Pedro | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 288.3 GWh | Apr 1971 | Aug 2026 | Water |
| Kingsburg Cogen | KES Kingsburg LP | Kingsburg, CA | California Independent System Operator (CISO) | 8.4 GWh | Nov 1990 | Sep 2025 | Natural Gas |
| Kingsburg Solar | Altus Power America Management, LLC | Kingsburg, CA | California Independent System Operator (CISO) | 6.3 GWh | Nov 2013 | Dec 2025 | Solar |
| Blackjack Solar | South County Packing | King City, CA | California Independent System Operator (CISO) | 9.0 GWh | Nov 2020 | Dec 2025 | Solar |
| King City Power Plant | Calpine King City Cogen LLC | King City, CA | California Independent System Operator (CISO) | 33.9 GWh | Jan 1989 | Aug 2026 | Natural Gas |
| King City Peaking | Calpine Corp-King City | King City, CA | California Independent System Operator (CISO) | 5.4 GWh | Mar 2002 | Dec 2025 | Natural Gas |
| Community Solar Utica 1, LLC | AETS OpCo Holdings LLC | Kettleman, CA | California Independent System Operator (CISO) | 2.3 GWh | Feb 2025 | Dec 2025 | Solar |
| Kettleman Solar -Centaurus | Boralex US Operations LLC | Kettleman City, CA | California Independent System Operator (CISO) | 42.9 GWh | Jun 2015 | Dec 2025 | Solar |
| Kern River 3 | Southern California Edison Co | Kernville, CA | California Independent System Operator (CISO) | 142.6 GWh | Feb 1921 | Dec 2025 | Water |
| CA Jurupa Valley 3251 De Forest Circle | Catalyze Mira Loma 3251 De Forest Circle Microgrid LLC | Jurupa Valley, CA | California Independent System Operator (CISO) | 8.5 GWh | Mar 2024 | Dec 2025 | Solar |
| Dulles | Golden Springs Development Company LLC | Jurupa Valley, CA | California Independent System Operator (CISO) | 1.6 GWh | Aug 2016 | Dec 2025 | Solar |
| Rush Creek | Southern California Edison Co | June lake, CA | California Independent System Operator (CISO) | 30.0 GWh | Sep 1916 | Dec 2025 | Water |
| Cascade Solar | Cascade Solar LLC | Joshua Tree, CA | California Independent System Operator (CISO) | 51.4 GWh | Dec 2013 | Dec 2025 | Solar |
| Sonora 1 | CleanCapital Holdings | Jamestown, CA | California Independent System Operator (CISO) | 858.0 MWh | Nov 2013 | Dec 2025 | Solar |
| New Melones | U S Bureau of Reclamation | Jamestown, CA | Balancing Authority of Northern California (BANC) | 402.1 GWh | May 1979 | Aug 2026 | Water |
| Pacific-Ultrapower Chinese Station | IHI Power Services Corp | Jamestown, CA | California Independent System Operator (CISO) | 99.5 GWh | Sep 1986 | Aug 2026 | Wood/Wood Waste Solids : 98.4% Gaseous Propane : 1.6% |
| Tulloch | Oakdale&South San Joaquin Irrigation D. | Jamestown, CA | California Independent System Operator (CISO) | 103.2 GWh | May 1958 | Dec 2025 | Water |
| Jacumba Solar Farm | Invenergy Services LLC | Jacumba, CA | California Independent System Operator (CISO) | 46.3 GWh | Jun 2017 | Dec 2025 | Solar |
| Electra | Pacific Gas & Electric Co. | Jackson, CA | California Independent System Operator (CISO) | 259.7 GWh | May 1948 | Aug 2026 | Water |
| UCI Facilities Management Central Plant | University of California Irvine | Irvine, CA | California Independent System Operator (CISO) | 113.6 GWh | Jun 2007 | Aug 2026 | Natural Gas |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 28.8 GWh |
| Tehama County, CA | # 51 | 7 | 45.8 GWh |
| Napa County, CA | # 50 | 11 | 51.2 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.7 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 80.3 GWh |
| San Mateo County, CA | # 46 | 11 | 133.1 GWh |
| Yolo County, CA | # 45 | 15 | 196.6 GWh |
| Nevada County, CA | # 44 | 12 | 225.7 GWh |
| San Benito County, CA | # 43 | 6 | 266.2 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 292.9 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 450.0 GWh |
| Trinity County, CA | # 38 | 5 | 480.6 GWh |
| Merced County, CA | # 37 | 33 | 493.1 GWh |
| Calaveras County, CA | # 36 | 6 | 524.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 608.6 GWh |
| Ventura County, CA | # 33 | 33 | 719.4 GWh |
| Lake County, CA | # 32 | 10 | 892.8 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 29 | 1.2 TWh |
| Yuba County, CA | # 29 | 5 | 1.5 TWh |
| El Dorado County, CA | # 28 | 15 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| San Joaquin County, CA | # 27 | 53 | 1.6 TWh |
| Tulare County, CA | # 26 | 72 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.8 TWh |
| Placer County, CA | # 24 | 26 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Orange County, CA | # 21 | 59 | 2.6 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.7 TWh |
| Alameda County, CA | # 19 | 52 | 2.8 TWh |
| Tuolumne County, CA | # 18 | 23 | 2.9 TWh |
| Monterey County, CA | # 17 | 29 | 3.0 TWh |
| Solano County, CA | # 16 | 41 | 3.0 TWh |
| Santa Clara County, CA | # 15 | 76 | 3.4 TWh |
| Butte County, CA | # 14 | 25 | 3.5 TWh |
| Kings County, CA | # 13 | 59 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.0 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 68 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.0 TWh |
| Fresno County, CA | # 8 | 128 | 7.8 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 212 | 11.8 TWh |
| Contra Costa County, CA | # 5 | 59 | 11.8 TWh |
| Riverside County, CA | # 4 | 165 | 14.0 TWh |
| Los Angeles County, CA | # 3 | 325 | 17.3 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Kern County, CA | # 1 | 333 | 35.3 TWh |