Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Lindberg FIeld Solar | Lindberg Field Solar I LLC | San Diego, CA | California Independent System Operator (CISO) | 3.0 GWh | Aug 2015 | Dec 2024 | Solar |
| SDCCD - Miramar | CleanCapital Holdings | San Diego, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2011 | Dec 2024 | Solar |
| W Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 23.2 GWh | Jun 2005 | Mar 2026 | Natural Gas |
| Kilroy Solar | Nautilus Solar Solutions | San Diego, CA | California Independent System Operator (CISO) | 6.2 GWh | Dec 2017 | Dec 2024 | Solar |
| Pio Pico Energy Center | Pio Pico Energy Center LLC | San Diego, CA | California Independent System Operator (CISO) | 65.9 GWh | Oct 2016 | Dec 2024 | Natural Gas |
| Larkspur Energy Facility | Diamond Generating Corporation | San Diego, CA | California Independent System Operator (CISO) | 24.4 GWh | Jun 2001 | Dec 2024 | Natural Gas |
| Watkins Manufacturing Co. | Watkins Manufacturing Corporation | San Diego, CA | California Independent System Operator (CISO) | 7.7 GWh | Oct 2001 | Mar 2026 | Natural Gas |
| Border Hybrid Energy Center | CalPeak Power, LLC | San Diego, CA | California Independent System Operator (CISO) | 14.8 GWh | Oct 2001 | Dec 2024 | Natural Gas |
| Otay Mesa Generating Project | Otay Mesa Energy Center LLC | San Diego, CA | California Independent System Operator (CISO) | 1.4 TWh | Sep 2009 | Mar 2026 | Natural Gas |
| MM San Diego-Miramar | MM San Diego Energy-Miramar | San Diego, CA | California Independent System Operator (CISO) | 46.1 GWh | Jun 1997 | Dec 2024 | Landfill Gas : 91.9% Other Biomass Gas : 8.1% |
| Childrens Hospital | DTE San Diego COGEN Inc. | San Diego, CA | California Independent System Operator (CISO) | 25.8 GWh | Mar 2000 | Mar 2026 | Natural Gas : 99.9% |
| Naval Hospital Medical Center | Department of the Navy | San Diego, CA | California Independent System Operator (CISO) | 22.6 GWh | Nov 2003 | Jan 2026 | Natural Gas |
| CP Kelco San Diego Plant | CP Kelco US Inc. | San Diego, CA | California Independent System Operator (CISO) | 73.1 GWh | Sep 1983 | Mar 2026 | Natural Gas |
| Gas Utilization Facility | City of San Diego | San Diego, CA | California Independent System Operator (CISO) | 29.6 GWh | May 1985 | Mar 2026 | Other Biomass Gas |
| Kyocera International Inc.(San Diego) | Kyocera International, Inc | San Diego, CA | California Independent System Operator (CISO) | 9.1 GWh | Aug 2012 | Dec 2024 | Natural Gas |
| ISH Solar Hospital SDMC | SunEdison LLC | San Diego, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2011 | Dec 2024 | Solar |
| Miramar Energy Facility | San Diego Gas & Electric Co | San Diego, CA | California Independent System Operator (CISO) | 6.8 GWh | May 2005 | Mar 2026 | Natural Gas |
| San Diego State University | San Diego State University | San Diego, CA | California Independent System Operator (CISO) | 57.0 GWh | Aug 2002 | Mar 2026 | Natural Gas : 97.3% Solar : 2.7% |
| AT&T - San Diego Trade Street | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 6.4 GWh | Feb 2016 | Dec 2024 | Natural Gas |
| County of San Diego COC Hybrid | Solar Star California LXXVIII, LLC | San Diego, CA | California Independent System Operator (CISO) | 3.1 GWh | Jun 2020 | Dec 2024 | Solar |
| University of San Diego | Bloom Energy 2009 PPA | San Diego, CA | California Independent System Operator (CISO) | 8.2 GWh | Nov 2016 | Dec 2024 | Natural Gas |
| San Diego Community College | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 8.3 GWh | Feb 2020 | Dec 2024 | Natural Gas |
| CA - DGS RFP - RJ Donovan State Prison | Forefront Power, LLC | San Diego, CA | California Independent System Operator (CISO) | 5.1 GWh | Dec 2023 | Dec 2024 | Solar |
| Amazon SAN3 Solar Project | Solar Star Prime 4 LLC | San Diego, CA | California Independent System Operator (CISO) | 6.1 GWh | Apr 2024 | Dec 2024 | Solar |
| Google Bayhill Solar PV and Microgrid | Google, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 1.0 GWh | Mar 2024 | Dec 2024 | Solar |
| Shelter Creek Condominiums Solar | Vista Solar, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 3.5 GWh | Jan 2020 | Dec 2024 | Solar |
| SB Water Reclamation Fuel Cell | San Bernardino Fuel Cell, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 9.4 GWh | May 2021 | Dec 2024 | Other Biomass Gas : 91.7% Natural Gas : 8.3% |
| Colton Solar One, LLC | Colton Solar One, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 3.0 GWh | May 2015 | Dec 2024 | Solar |
| OES Biogas Power | Organic Energy Solutions, Inc. | San Bernardino, CA | California Independent System Operator (CISO) | 4.9 GWh | - | Dec 2024 | Other Biomass Gas |
| Chambers 4 - San Bernardino SNA7 | MN8 Energy LLC | San Bernardino, CA | California Independent System Operator (CISO) | 595.0 MWh | Nov 2018 | Dec 2024 | Solar |
| IGS SBD2 | Greenbacker Renewable Energy Corporation | San Bernardino, CA | Los Angeles Department of Water and Power (LDWP) | 4.8 GWh | Jan 2023 | Dec 2024 | Solar |
| Devil Canyon | California Dept. of Water Resources | San Bernardino, CA | California Independent System Operator (CISO) | 875.6 GWh | Nov 1972 | Mar 2026 | Water |
| Kohls San Bernardino Solar Facility | SunE WF3 KHL A Holdings, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 944.0 MWh | Oct 2007 | Dec 2024 | Solar |
| Salinas River Cogeneration | Salinas River Cogeneration Co | San Ardo, CA | California Independent System Operator (CISO) | 251.4 GWh | Oct 1991 | Mar 2026 | Natural Gas |
| Aera San Ardo Cogen Facility | Aera Energy LLC-San Ardo | San Ardo, CA | California Independent System Operator (CISO) | 17.2 GWh | Jun 1989 | Dec 2024 | Natural Gas |
| TLR000 Hansen Fuel Cell | 2016 ESA Project Company, LLC | Salinas, CA | California Independent System Operator (CISO) | 8.2 GWh | Aug 2018 | Dec 2024 | Natural Gas |
| D'Arrigo Brothers - Phase 4 | CalCom Energy | Salinas, CA | California Independent System Operator (CISO) | 4.3 GWh | Feb 2019 | Dec 2024 | Solar |
| Taylor Farms - Schilling Place | Bloom Energy | Salinas, CA | California Independent System Operator (CISO) | 8.5 GWh | Jun 2019 | Dec 2024 | Natural Gas |
| Beringer | Perpetual Energy Systems | Saint Helena, CA | California Independent System Operator (CISO) | 1.4 GWh | Dec 2008 | Dec 2024 | Solar |
| US GSA - Sacramento | Tesla Inc. | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.0 GWh | Feb 2018 | Dec 2024 | Solar |
| Dept of General Services -FTB | California PV Energy 2, LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 5.1 GWh | Jun 2017 | Dec 2024 | Solar |
| SCDA Solar 1 | SCDA Solar 1, LLC | Sacramento, CA | California Independent System Operator (CISO) | 13.4 GWh | Sep 2017 | Dec 2024 | Solar |
| Sacramento Fairbain Water Treatment Plan | Tesla Inc. | Sacramento, CA | Balancing Authority of Northern California (BANC) | 961.0 MWh | Jan 2013 | Dec 2024 | Solar |
| Strata Roof 1 | Strata Manager, LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 1.5 GWh | Apr 2013 | Dec 2024 | Solar |
| Sacramento (SMUD) | Terraform Arcadia | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.0 GWh | Jul 2014 | Dec 2024 | Solar |
| Depot Park Solar System | Depot Park Solar Farm | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.2 GWh | Nov 2010 | Dec 2024 | Solar |
| Renew Solar ABC Sacramento LLC | Greenbacker Renewable Energy Corporation | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.7 GWh | Oct 2020 | Dec 2024 | Solar |
| Carson Ice-Gen Project | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 91.6 GWh | Sep 1995 | Mar 2026 | Natural Gas : 97.5% Other Biomass Gas : 2.5% |
| SCA Cogen 2 | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 518.5 GWh | Feb 1997 | Mar 2026 | Natural Gas |
| SPA Cogen 3 | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 487.0 GWh | Nov 1997 | Mar 2026 | Natural Gas |
| McClellan (CA) | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.4 GWh | Feb 1986 | Dec 2024 | Natural Gas |
| FRV SI Transport Solar LP | FRV SI Transport Solar, L.P. (Sacremento) | Sacramento, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2010 | Dec 2024 | Solar |
| Solar Star California II LLC | Solar Star California II LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.5 GWh | Jul 2012 | Dec 2024 | Solar |
| Department of Justice | Ecoplexus, Inc | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.9 GWh | Mar 2020 | Dec 2024 | Solar |
| CSU Sacramento I | BluePath Solar Sacramento I LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.1 GWh | Jan 2023 | Dec 2024 | Solar |
| Sacramento Point West Medical Offices | KP Sacramento Point West Medical Offices Solar, LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.1 GWh | Oct 2020 | Dec 2024 | Solar |
| Centinela State Prison | Ecoplexus, Inc | Sacramento, CA | Imperial Irrigation District (IID) | 16.7 GWh | Nov 2019 | Dec 2024 | Solar |
| Chambers 4 - Sacramento SMF1 | MN8 Energy LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Aug 2018 | Dec 2024 | Solar |
| Gosselin Hydro Plant | Humboldt Bay Mun Water Dist | Ruth, CA | California Independent System Operator (CISO) | 5.9 GWh | May 1983 | Dec 2024 | Water |
| Roseville Energy Park | City of Roseville - (CA) | Roseville, CA | Balancing Authority of Northern California (BANC) | 367.1 GWh | Oct 2007 | Mar 2026 | Natural Gas |
| Catalina Solar LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 262.2 GWh | Nov 2012 | Dec 2024 | Solar |
| Manzana Wind LLC | Avangrid Power LLC | Rosamond, CA | California Independent System Operator (CISO) | 543.7 GWh | Nov 2012 | Dec 2024 | Wind |
| Pacific Wind LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 311.2 GWh | Jul 2012 | Dec 2024 | Wind |
| RE Gaskell West 2 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 112.8 GWh | Apr 2023 | Mar 2026 | Solar |
| Catalina Solar 2, LLC | Onward Energy | Rosamond, CA | California Independent System Operator (CISO) | 52.8 GWh | Jul 2015 | Dec 2024 | Solar |
| Kingbird A Solar LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 45.8 GWh | Mar 2016 | Dec 2024 | Solar |
| North Rosamond Solar LLC | North Rosamond Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 388.1 GWh | May 2019 | Mar 2026 | Solar |
| RE Astoria | RE Astoria LLC | Rosamond, CA | California Independent System Operator (CISO) | 187.7 GWh | Nov 2016 | Mar 2026 | Solar |
| RE Astoria 2 | RE Astoria 2 LLC | Rosamond, CA | California Independent System Operator (CISO) | 156.9 GWh | Nov 2016 | Mar 2026 | Solar |
| Kingbird B Solar, LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 55.8 GWh | Mar 2016 | Dec 2024 | Solar |
| Solar Star 1 | Solar Star California XIX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 893.5 GWh | Feb 2014 | Mar 2026 | Solar |
| RE Gaskell West 5 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 49.3 GWh | Apr 2023 | Dec 2024 | Solar |
| RE Rosamond Two LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 48.3 GWh | Dec 2013 | Dec 2024 | Solar |
| RE Gaskell West 4 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 50.0 GWh | Apr 2023 | Dec 2024 | Solar |
| RE Gaskell West 3 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 49.3 GWh | Apr 2023 | Dec 2024 | Solar |
| RE Rosamond One LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 52.3 GWh | Dec 2013 | Dec 2024 | Solar |
| Golden Field Solar III, LLC | Golden Fields Solar III, LLC | Rosamond, CA | California Independent System Operator (CISO) | 538.9 GWh | Nov 2020 | Mar 2026 | Solar : 99.4% |
| RE Garland | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 483.5 GWh | Oct 2016 | Dec 2024 | Solar |
| Camino Solar Hybrid | Avangrid Power LLC | Rosamond, CA | California Independent System Operator (CISO) | 132.8 GWh | - | Mar 2026 | Solar |
| Valentine Solar, LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 282.7 GWh | Oct 2019 | Mar 2026 | Solar |
| Solar Star 2 | Solar Star California XX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 723.9 GWh | Feb 2014 | Mar 2026 | Solar |
| Solar Star California, XLI, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 142.3 GWh | Nov 2016 | Mar 2026 | Solar |
| Golden Fields Solar I, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 138.6 GWh | Nov 2016 | Mar 2026 | Solar |
| RE Garland A | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 58.2 GWh | Aug 2016 | Dec 2024 | Solar |
| Willow Spring Solar, LLC | Willow Spring Solar LLC | Rosamond, CA | California Independent System Operator (CISO) | 239.9 GWh | Dec 2018 | Mar 2026 | Solar |
| Chaparral Springs | Leeward Asset Management, LLC | Rosamond, CA | California Independent System Operator (CISO) | 395.0 GWh | - | Mar 2026 | Solar |
| Rosamond South 1 | Golden Fields Solar IV, LLC | Rosamond, CA | California Independent System Operator (CISO) | 243.8 GWh | - | Mar 2026 | Solar |
| BigBeau Solar, LLC | Big Beau Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 340.2 GWh | Jan 2022 | Mar 2026 | Solar |
| Rabbitbrush Solar, LLC | Leeward Asset Management, LLC | Rosamond, CA | California Independent System Operator (CISO) | 250.2 GWh | Sep 2022 | Mar 2026 | Solar |
| City of Rosamond (CA) | Standard Solar | Rosamond, CA | California Independent System Operator (CISO) | 2.7 GWh | Apr 2023 | Dec 2024 | Solar |
| P66 Rodeo Solar | P66 Rodeo Solar | Rodeo, CA | California Independent System Operator (CISO) | 52.7 GWh | Mar 2023 | Mar 2026 | Solar |
| Roseville Power Plant #2 | City of Roseville - (CA) | Rocklin, CA | Balancing Authority of Northern California (BANC) | 6.9 GWh | Mar 1986 | Dec 2024 | Natural Gas |
| Springs Generating Station | City of Riverside - (CA) | Riverside, CA | California Independent System Operator (CISO) | 825.0 MWh | Jun 2002 | Dec 2024 | Natural Gas |
| Riverside Energy Resource Center | City of Riverside - (CA) | Riverside, CA | California Independent System Operator (CISO) | 71.9 GWh | May 2006 | Dec 2024 | Natural Gas |
| SSI West Riverside Landfill LLC | Standard Solar | Riverside, CA | Los Angeles Department of Water and Power (LDWP) | 4.3 GWh | Oct 2020 | Dec 2024 | Solar |
| Broadway 2 - UC Riverside | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 2.3 GWh | Aug 2014 | Dec 2024 | Solar |
| Park Meridian #1 | Altus Power America Management, LLC | Riverside, CA | California Independent System Operator (CISO) | 2.5 GWh | Feb 2015 | Dec 2024 | Solar |
| UC Riverside Lots 30 & 32 | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2017 | Dec 2024 | Solar |
| Riverside RWQCP Fuel Cell | Riverside Fuel Cell, LLC | Riverside, CA | California Independent System Operator (CISO) | 8.5 GWh | Jul 2016 | Dec 2024 | Other Biomass Gas : 83.8% Natural Gas : 16.2% |
| Tequesquite Landfill Solar PV Project | Solar Star California XXXI, LLC | Riverside, CA | California Independent System Operator (CISO) | 12.7 GWh | Sep 2015 | Dec 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on March 2026 generation numbers.| County | State Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Sierra County, CA | # 55 | 3 | 11.9 GWh |
| Mendocino County, CA | # 54 | 5 | 12.3 GWh |
| Glenn County, CA | # 53 | 2 | 18.7 GWh |
| Marin County, CA | # 52 | 3 | 19.0 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Tehama County, CA | # 50 | 7 | 59.3 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| San Francisco County, CA | # 48 | 10 | 82.1 GWh |
| Siskiyou County, CA | # 47 | 8 | 89.8 GWh |
| San Mateo County, CA | # 46 | 11 | 134.3 GWh |
| Yolo County, CA | # 45 | 15 | 210.6 GWh |
| Nevada County, CA | # 44 | 12 | 219.1 GWh |
| San Benito County, CA | # 43 | 6 | 271.3 GWh |
| Mariposa County, CA | # 42 | 2 | 299.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 316.4 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Humboldt County, CA | # 39 | 10 | 450.9 GWh |
| Trinity County, CA | # 38 | 5 | 514.3 GWh |
| Merced County, CA | # 37 | 31 | 549.1 GWh |
| Calaveras County, CA | # 36 | 6 | 555.5 GWh |
| Amador County, CA | # 35 | 8 | 621.1 GWh |
| Ventura County, CA | # 34 | 32 | 743.6 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Lake County, CA | # 32 | 10 | 908.4 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| Yuba County, CA | # 29 | 5 | 1.5 TWh |
| Tulare County, CA | # 28 | 69 | 1.6 TWh |
| County | State Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| San Joaquin County, CA | # 27 | 47 | 1.6 TWh |
| El Dorado County, CA | # 26 | 15 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Plumas County, CA | # 23 | 13 | 2.0 TWh |
| Colusa County, CA | # 22 | 3 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.4 TWh |
| Orange County, CA | # 20 | 59 | 2.6 TWh |
| Stanislaus County, CA | # 19 | 25 | 2.7 TWh |
| Alameda County, CA | # 18 | 47 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 3.0 TWh |
| Solano County, CA | # 16 | 40 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 75 | 3.5 TWh |
| Kings County, CA | # 13 | 57 | 4.2 TWh |
| San Diego County, CA | # 12 | 151 | 4.4 TWh |
| Sonoma County, CA | # 11 | 26 | 5.1 TWh |
| Sacramento County, CA | # 10 | 65 | 5.7 TWh |
| Shasta County, CA | # 9 | 46 | 7.3 TWh |
| Fresno County, CA | # 8 | 119 | 7.6 TWh |
| Imperial County, CA | # 7 | 84 | 9.5 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.0 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.0 TWh |
| Riverside County, CA | # 4 | 159 | 14.8 TWh |
| Los Angeles County, CA | # 3 | 308 | 17.0 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 19.7 TWh |
| Kern County, CA | # 1 | 313 | 35.2 TWh |