Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Turlock Lake | Turlock Irrigation District | Hickman, CA | Turlock Irrigation District (TIDC) | 7.0 GWh | Jun 1980 | Dec 2024 | Water |
Mojave Siphon | California Dept. of Water Resources | Hesperia, CA | California Independent System Operator (CISO) | 46.2 GWh | Jul 1996 | Dec 2024 | Water |
Hesperia | SunEdison LLC | Hesperia, CA | California Independent System Operator (CISO) | 3.2 GWh | Jul 2014 | Dec 2024 | Solar |
PSREC/SIAD Solar | Plumas Sierra Rural Electric Coop | Herlong, CA | California Independent System Operator (CISO) | 6.2 GWh | Aug 2018 | Dec 2024 | Solar |
Bio-Rad | Vista Solar, Inc. | Hercules, CA | California Independent System Operator (CISO) | 3.2 GWh | Sep 2021 | Dec 2024 | Solar |
Rancho Seco Solar, LLC | Rancho Seco Solar, LLC | Herald, CA | Balancing Authority of Northern California (BANC) | 19.2 GWh | Jul 2016 | Dec 2024 | Solar |
Cosumnes | Sacramento Municipal Util Dist | Herald, CA | Balancing Authority of Northern California (BANC) | 3.9 TWh | Jan 2006 | Apr 2025 | Natural Gas : 98.7% Other Biomass Gas : 1.3% |
Tahquitz High School | AES Distributed Energy | Hemet, CA | California Independent System Operator (CISO) | 1.6 GWh | Aug 2012 | Dec 2024 | Solar |
West Valley High School Solar | AES Distributed Energy | Hemet, CA | California Independent System Operator (CISO) | 1.3 GWh | Aug 2012 | Dec 2024 | Solar |
AP North Lake I, LP | AP North Lake I, LP | Hemet, CA | California Independent System Operator (CISO) | 39.6 GWh | Jul 2015 | Dec 2024 | Solar |
San Joaquin Solar | GASNA 6P, LLC | Helm, CA | California Independent System Operator (CISO) | 24.5 GWh | Sep 2018 | Dec 2024 | Solar |
Stroud Solar Station | Pacific Gas & Electric Co. | Helm, CA | California Independent System Operator (CISO) | 25.0 GWh | Aug 2011 | Oct 2024 | Solar |
Heber Solar | Axium US Solar Holdings LLC | Heber, CA | Imperial Irrigation District (IID) | 24.6 GWh | Apr 2014 | Dec 2024 | Solar |
Heber Geothermal | ORCAL Geothermal, Inc | Heber, CA | Imperial Irrigation District (IID) | 384.9 GWh | May 1985 | Dec 2024 | Geothermal |
Second Imperial Geothermal | ORCAL Geothermal, Inc | Heber, CA | Imperial Irrigation District (IID) | 302.3 GWh | May 1993 | Dec 2024 | Geothermal |
Dissigno Healdsburg FPV, LLC | Palmetto Power Management LLC | Healdsburg, CA | California Independent System Operator (CISO) | 5.9 GWh | Nov 2020 | Dec 2023 | Solar |
AT&T - Hayward | Bloom Energy | Hayward, CA | California Independent System Operator (CISO) | 8.2 GWh | Oct 2016 | Dec 2024 | Natural Gas |
City of Hayward WWTP | City of Hayward | Hayward, CA | California Independent System Operator (CISO) | 11.3 GWh | Oct 2010 | Dec 2024 | Other Biomass Gas : 60.4% Solar : 27.7% Natural Gas : 12.0% |
Russell City Energy Center | Russell City Energy Company LLC | Hayward, CA | California Independent System Operator (CISO) | 1.4 TWh | Jul 2013 | Apr 2025 | Natural Gas |
AT&T - Hawthorne | Bloom Energy | Hawthorne, CA | California Independent System Operator (CISO) | 6.5 GWh | Sep 2016 | Dec 2024 | Natural Gas |
Bidwell Ditch Project | Mega Renewables | Hat Creek, CA | California Independent System Operator (CISO) | 10.7 GWh | Feb 1987 | Dec 2024 | Water |
Kaiser - Harbor City | Bloom Energy | Harbor City, CA | California Independent System Operator (CISO) | 17.9 GWh | Nov 2019 | Dec 2024 | Natural Gas |
Danell Bros Inc | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 5.8 GWh | Aug 2021 | Dec 2023 | Solar |
Verwey-Hanford Dairy Digester #2 | Hanford Renewable Energy LLC | Hanford, CA | California Independent System Operator (CISO) | 5.9 GWh | Jun 2019 | Dec 2024 | Other Biomass Gas |
Hanford 1 and 2 | Arevon Energy, Inc. | Hanford, CA | California Independent System Operator (CISO) | 5.0 GWh | Jul 2014 | Dec 2024 | Solar |
Still Water Power | Still Water Power LLC | Hanford, CA | California Independent System Operator (CISO) | 674.0 MWh | Apr 2020 | Dec 2024 | Other Biomass Gas |
Dover Dairy | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 2.7 GWh | Apr 2022 | Dec 2023 | Solar |
Verwey-Hanford Dairy Digester #3 | Hanford Renewable Energy LLC | Hanford, CA | California Independent System Operator (CISO) | 5.4 GWh | Jun 2019 | Dec 2024 | Other Biomass Gas |
Verwey-Hanford Dairy Digester #1 | AlsoEnergy | Hanford, CA | California Independent System Operator (CISO) | 901.6 MWh | Sep 2016 | Dec 2024 | Other Biomass Gas |
Dixie Creek Dairy Solar | Bravo REC Management LLC | Hanford, CA | California Independent System Operator (CISO) | 3.0 GWh | Jun 2024 | Dec 2024 | Solar |
River Ranch Dairy | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 6.9 GWh | May 2024 | Dec 2024 | Solar |
Lone Oak | Bravo REC Management LLC | Hanford, CA | California Independent System Operator (CISO) | 5.7 GWh | Feb 2023 | Dec 2024 | Solar |
Guernsey Solar Station | Pacific Gas & Electric Co. | Hanford, CA | California Independent System Operator (CISO) | 22.7 GWh | Jul 2013 | Dec 2024 | Solar |
Hanford Energy Park Peaker | MRP San Joaquin Energy LLC. | Hanford, CA | California Independent System Operator (CISO) | 6.4 GWh | Aug 2001 | Apr 2025 | Natural Gas |
Ameresco Ox Mountain | AMERESCO Ox Mountain Energy LLC | Half Moon Bay, CA | California Independent System Operator (CISO) | 82.0 GWh | Nov 2008 | Apr 2025 | Landfill Gas |
Quinto Solar PV Project | Arevon Energy, Inc. | Gustine, CA | California Independent System Operator (CISO) | 257.0 GWh | Oct 2015 | Dec 2024 | Solar |
Dion R Holm | City & County of San Francisco | Groveland, CA | California Independent System Operator (CISO) | 492.3 GWh | Jul 1960 | Apr 2025 | Water |
R C Kirkwood | City & County of San Francisco | Groveland, CA | California Independent System Operator (CISO) | 412.1 GWh | Jan 1967 | Apr 2025 | Water |
Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 4.0 GWh | Mar 2013 | Dec 2023 | Solar |
Gridley Main | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2013 | Dec 2024 | Solar |
Foundation Scheid Vineyards | Foundation CA Fund VIII Manager, LLC | Greenfield, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2017 | Dec 2024 | Wind |
Narrows PH | Yuba County Water Agency | Grass Valley, CA | California Independent System Operator (CISO) | 80.8 GWh | Nov 1942 | Dec 2024 | Water |
W E Warne | California Dept. of Water Resources | Gorman, CA | California Independent System Operator (CISO) | 171.5 GWh | Oct 1982 | Dec 2024 | Water |
Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 8.7 GWh | Apr 2013 | Dec 2024 | Landfill Gas |
Foundation Mann Packing | Foundation CA Fund IX Manager, LLC | Gonzales, CA | California Independent System Operator (CISO) | 5.6 GWh | Mar 2019 | Dec 2024 | Wind |
Taylor Farms | Foundation HA Energy Generation, LLC | Gonzales, CA | California Independent System Operator (CISO) | 3.9 GWh | Oct 2014 | Dec 2024 | Wind |
Santa Barbara ReSource Center | County of Santa Barbara | Goleta, CA | California Independent System Operator (CISO) | 5.4 GWh | May 2022 | Dec 2024 | Other Biomass Gas |
Ellwood | Ellwood Power, LLC | Goleta, CA | California Independent System Operator (CISO) | 2.5 GWh | Jul 1974 | Dec 2024 | Natural Gas |
Grayson | City of Glendale - (CA) | Glendale, CA | Los Angeles Department of Water and Power (LDWP) | 50.4 GWh | Nov 1953 | Apr 2025 | Natural Gas |
Gilroy Peaking Energy Center | Calpine Gilroy Cogen LP | Gilroy, CA | California Independent System Operator (CISO) | 23.3 GWh | Oct 2001 | Dec 2024 | Natural Gas |
Gilroy Power Plant | Calpine Gilroy Cogen LP | Gilroy, CA | California Independent System Operator (CISO) | 44.2 GWh | Sep 1987 | Dec 2024 | Natural Gas |
AT&T - Gardena | Bloom Energy | Gardena, CA | California Independent System Operator (CISO) | 7.8 GWh | May 2013 | Dec 2024 | Natural Gas |
RE McKenzie 1 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2024 | Solar |
RE McKenzie 2 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2024 | Solar |
SMUD at Fleshman | Sacramento PV Energy, LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 5.0 GWh | Nov 2011 | Dec 2024 | Solar |
SMUD at Van Conett | Sacramento PV Energy, LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 1.3 GWh | Nov 2011 | Dec 2023 | Solar |
RE McKenzie 3 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2024 | Solar |
RE McKenzie 4 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2024 | Solar |
RE McKenzie 5 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2024 | Solar |
RE McKenzie 6 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2024 | Solar |
CSUF Trigeneration | California State University at Fullerton | Fullerton, CA | California Independent System Operator (CISO) | 38.0 GWh | Sep 2010 | Apr 2025 | Natural Gas : 82.1% Solar : 17.9% |
CSUF State College | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2016 | Dec 2024 | Solar |
CSUF Nutwood Solar | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2016 | Dec 2024 | Solar |
Friant Hydro Facility | Friant Power Authority | Friant, CA | California Independent System Operator (CISO) | 59.8 GWh | Mar 1985 | Dec 2024 | Water |
CSU Fresno Solar Project | MMA Fresno Power LP | Fresno, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2007 | Dec 2024 | Solar |
Gap Pacific Distribution Center | MN8 Energy LLC | Fresno, CA | California Independent System Operator (CISO) | 5.4 GWh | Sep 2008 | Dec 2024 | Solar |
Saint Agnes Medical Center | Saint Agnes Medical Center | Fresno, CA | California Independent System Operator (CISO) | 26.9 GWh | Apr 2001 | Apr 2025 | Natural Gas |
Malaga Power LLC | CalPeak Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 14.1 GWh | Aug 2005 | Apr 2025 | Natural Gas |
Rio Bravo Fresno | Rio Bravo Fresno | Fresno, CA | California Independent System Operator (CISO) | 108.4 GWh | Jun 1988 | Oct 2024 | Wood/Wood Waste Solids : 94.7% Natural Gas : 5.3% |
La Joya Del Sol | CVI CleanCapital Solar 1 LLC | Fresno, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2012 | Dec 2024 | Solar |
SCCCD - Clovis Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2018 | Dec 2024 | Solar |
Fresno Sunnyside High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2020 | Dec 2023 | Solar |
Scarlet Solar (CA) | EDP Renewables North America LLC | Fresno, CA | California Independent System Operator (CISO) | 401.4 GWh | May 2024 | Apr 2025 | Solar |
CA - Fresno County - Juvenile Hall | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 552.0 MWh | Feb 2022 | Dec 2024 | Solar |
POM Juice Solar | Wonderful Renewable Energy, LLC. | Fresno, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2021 | Dec 2024 | Solar |
Fresno Bullard High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.2 GWh | Feb 2020 | Dec 2023 | Solar |
Fresno Hoover High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.1 GWh | Feb 2020 | Dec 2023 | Solar : 99.3% Electricity used for energy storage : 0.7% |
Clovis North High School | Tesla Inc. | Fresno, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2017 | Dec 2024 | Solar |
SCCCD - Fresno Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 3.8 GWh | Sep 2018 | Dec 2023 | Solar |
OK Produce Fresno Carport | OK Produce | Fresno, CA | California Independent System Operator (CISO) | 3.6 GWh | Dec 2018 | Dec 2024 | Solar |
RE Adams East, LLC | Onward Energy | Fresno, CA | California Independent System Operator (CISO) | 39.3 GWh | Nov 2014 | Dec 2024 | Solar |
JD Foods - JD Foods | Barrier Solar Inc | Fresno, CA | California Independent System Operator (CISO) | 455.0 MWh | Sep 2020 | Dec 2024 | Solar |
Fresno Community Solar | Fresno Community Solar Developers, LLC | Fresno, CA | California Independent System Operator (CISO) | 15.4 GWh | May 2024 | Dec 2024 | Solar |
Union Valley | Sacramento Municipal Util Dist | Fresh Pond, CA | Balancing Authority of Northern California (BANC) | 76.5 GWh | Sep 1963 | Dec 2024 | Water |
Jones Fork | Sacramento Municipal Util Dist | Fresh Pond, CA | Balancing Authority of Northern California (BANC) | 8.6 GWh | May 1985 | Dec 2024 | Water |
Loon Lake | Sacramento Municipal Util Dist | Fresh Pond, CA | Balancing Authority of Northern California (BANC) | 63.2 GWh | Aug 1971 | Dec 2024 | Water |
Robbs Peak | Sacramento Municipal Util Dist | Fresh Pond, CA | Balancing Authority of Northern California (BANC) | 37.0 GWh | Sep 1965 | Sep 2024 | Water |
Judge F Carr | U S Bureau of Reclamation | French Gulch, CA | Balancing Authority of Northern California (BANC) | 260.9 GWh | Apr 1963 | Apr 2025 | Water |
Life Technologies - Fremont | Bloom Energy | Fremont, CA | California Independent System Operator (CISO) | 10.0 GWh | Nov 2020 | Dec 2024 | Natural Gas |
Fremont - Kato Rd | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2016 | Dec 2023 | Solar |
Fremont CA AutoFactory | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 480.0 MWh | Feb 2022 | Dec 2024 | Solar |
National Raisin | National Raisin | Fowler, CA | California Independent System Operator (CISO) | 4.8 GWh | May 2015 | Dec 2024 | Solar |
Plant No 1 Orange County | Orange County Sanitation Dist | Fountain Valley, CA | California Independent System Operator (CISO) | 40.3 GWh | May 1993 | Dec 2024 | Other Biomass Gas : 80.1% Natural Gas : 19.9% |
Gilead Foster City Solar Project | Gilead Sciences Inc. Foster City | Foster City, CA | California Independent System Operator (CISO) | 1.9 GWh | Mar 2021 | Dec 2024 | Solar |
French Meadows | Placer County Water Agency | Foresthill, CA | California Independent System Operator (CISO) | 50.8 GWh | Sep 1966 | Dec 2024 | Water |
Middle Fork | Placer County Water Agency | Foresthill, CA | California Independent System Operator (CISO) | 454.4 GWh | Sep 1966 | Apr 2025 | Water |
Oxbow (CA) | Placer County Water Agency | Foresthill, CA | California Independent System Operator (CISO) | 29.2 GWh | Sep 1966 | Sep 2024 | Water |
Ralston | Placer County Water Agency | Foresthill, CA | California Independent System Operator (CISO) | 328.1 GWh | Sep 1966 | Dec 2024 | Water |
Forbestown | South Feather Water and Power Agency | Forbestown, CA | California Independent System Operator (CISO) | 128.5 GWh | Sep 1963 | Dec 2024 | Water |
Sly Creek | South Feather Water and Power Agency | Forbestown, CA | California Independent System Operator (CISO) | 30.9 GWh | Jun 1983 | Dec 2024 | Water |
Browse Power Plants By California Counties
Figures are based on December 2024 generation numbers.County | State Rank | Active Plants | Dec 2024 Generation |
---|---|---|---|
Mendocino County, CA | # 55 | 5 | 12.3 GWh |
Glenn County, CA | # 54 | 2 | 18.7 GWh |
Marin County, CA | # 53 | 3 | 19.0 GWh |
Sierra County, CA | # 52 | 3 | 31.1 GWh |
Napa County, CA | # 51 | 9 | 49.2 GWh |
Santa Cruz County, CA | # 50 | 6 | 56.2 GWh |
Tehama County, CA | # 49 | 7 | 59.7 GWh |
San Francisco County, CA | # 48 | 10 | 85.0 GWh |
San Mateo County, CA | # 47 | 10 | 133.4 GWh |
Nevada County, CA | # 46 | 12 | 207.0 GWh |
Yolo County, CA | # 45 | 15 | 222.2 GWh |
Siskiyou County, CA | # 44 | 8 | 242.5 GWh |
Mariposa County, CA | # 43 | 2 | 299.7 GWh |
Santa Barbara County, CA | # 42 | 18 | 327.1 GWh |
San Benito County, CA | # 41 | 6 | 332.7 GWh |
Lassen County, CA | # 40 | 9 | 341.0 GWh |
Merced County, CA | # 39 | 30 | 418.2 GWh |
Humboldt County, CA | # 38 | 10 | 480.9 GWh |
Trinity County, CA | # 37 | 5 | 573.8 GWh |
Calaveras County, CA | # 36 | 6 | 613.6 GWh |
Amador County, CA | # 35 | 8 | 666.5 GWh |
Mono County, CA | # 34 | 9 | 785.9 GWh |
Ventura County, CA | # 33 | 32 | 828.4 GWh |
Lake County, CA | # 32 | 10 | 921.2 GWh |
Madera County, CA | # 31 | 28 | 994.0 GWh |
Tulare County, CA | # 30 | 68 | 1.0 TWh |
Inyo County, CA | # 29 | 23 | 1.2 TWh |
El Dorado County, CA | # 28 | 15 | 1.5 TWh |
County | State Rank | Active Plants | Dec 2024 Generation |
---|---|---|---|
Yuba County, CA | # 27 | 5 | 1.7 TWh |
Sutter County, CA | # 26 | 8 | 1.8 TWh |
Plumas County, CA | # 25 | 13 | 2.0 TWh |
Placer County, CA | # 24 | 23 | 2.1 TWh |
San Joaquin County, CA | # 23 | 45 | 2.3 TWh |
Alameda County, CA | # 22 | 46 | 2.4 TWh |
Stanislaus County, CA | # 21 | 25 | 2.6 TWh |
Colusa County, CA | # 20 | 3 | 2.9 TWh |
Tuolumne County, CA | # 19 | 23 | 3.0 TWh |
Solano County, CA | # 18 | 40 | 3.0 TWh |
Orange County, CA | # 17 | 59 | 3.2 TWh |
Monterey County, CA | # 16 | 29 | 3.7 TWh |
Butte County, CA | # 15 | 25 | 3.8 TWh |
Kings County, CA | # 14 | 57 | 4.1 TWh |
Santa Clara County, CA | # 13 | 74 | 4.4 TWh |
San Diego County, CA | # 12 | 150 | 5.0 TWh |
Sonoma County, CA | # 11 | 26 | 5.2 TWh |
Sacramento County, CA | # 10 | 64 | 6.4 TWh |
Shasta County, CA | # 9 | 46 | 7.2 TWh |
Fresno County, CA | # 8 | 109 | 8.1 TWh |
Imperial County, CA | # 7 | 84 | 9.7 TWh |
Contra Costa County, CA | # 6 | 56 | 13.4 TWh |
San Bernardino County, CA | # 5 | 203 | 13.4 TWh |
Riverside County, CA | # 4 | 159 | 14.3 TWh |
San Luis Obispo County, CA | # 3 | 22 | 20.6 TWh |
Los Angeles County, CA | # 2 | 307 | 20.7 TWh |
Kern County, CA | # 1 | 311 | 34.0 TWh |