Alta Wind Energy Center III
14047 90th Street West, Mojave, CA 93501Plant Summary Information
Alta Wind Energy Center III is ranked #14 out of 110 wind farms in California in terms of total annual net electricity generation.
Alta Wind Energy Center III generated 48.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Alta Wind Energy Center III |
---|---|
Utility Name | Alta Wind III, LLC |
Location | Kern County, CA |
Initial Operation Date | February 2011 |
Last Update | Dec 2023 |
Annual Generation | 302.6 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,909 out of 12,312 Power Plants Nationwide | |
Ranked #578 out of 1,355 Wind Power Plants Nationwide | |
Ranked #169 out of 1,568 California Power Plants | |
Ranked #14 out of 110 California Wind Power Plants | |
Fuel Types | Wind |
Previous Operators |
Terra-Gen Operating Co LLC (2013 to 2016) NRG Yield LLC (2017 to 2020) Alta Wind Energy Center III (2021 to 2023) Alta Wind III, LLC (2024 to 2024) |
Map of Alta Wind Energy Center III
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Alta Wind Energy Center III.
Monthly Net Generation for Alta Wind Energy Center III
Alta Wind Energy Center III Details
Summary Information | |
---|---|
Plant Name | Alta Wind Energy Center III (57292) |
Plant Address | 14047 90th Street West, Mojave, CA 93501 |
Utility | Alta Wind III, LLC (64621) |
Latitude, Longitude | 35.02389, -118.29528 |
Generation Dates on File | Feb 2011 to Dec 2023 |
Initial Operation Date | February 2011 |
Annual Generation | 302.6 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 10-45-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | No |
Generator AW03 Details Operating February 2011
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 150 MW |
Summer Capacity | 150 MW |
Winter Capacity | 150 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 50 |
Turbine Details | |
Number Of Turbines | 50 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V90-3.0 |
Design Wind Speed | 22.4 MPH |
Wind Quality Class | 1 - High Wind |
Turbine Hub Height Feet | 262 |
Alta Wind Energy Center III Plant Owners
Owner Name | Address | Ownership |
---|---|---|
NRG Renew | 4900 N Scottsdale Road, Scottsdale, AZ 85251 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#568 | Anacacho Wind Farm, LLC | Brackettville, TX | 316.0 GWh |
#569 | Post Wind Farm LP | Fluvanna, TX | 314.8 GWh |
#570 | Pacific Wind LLC | Rosamond, CA | 311.2 GWh |
#571 | Prairie Winds ND1 | Minot, ND | 310.6 GWh |
#572 | Black Oak Wind Farm | Sauk Centre, MN | 308.7 GWh |
#573 | Loraine Windpark Project LLC | Loraine, TX | 307.8 GWh |
#574 | Tuscola Wind II LLC | Reese, MI | 307.3 GWh |
#575 | Pinyon Pine I | Mojave, CA | 306.6 GWh |
#576 | Minco Wind I, LLC | Minco, OK | 304.9 GWh |
#577 | Marshall Wind Farm | Frankfort, KS | 304.8 GWh |
#579 | Beethoven Wind | Tripp, SD | 302.6 GWh |
#580 | Buffalo Gap 3 Wind Farm | Nolan, TX | 302.2 GWh |
#581 | Clearwater Wind III | Miles City, MT | 302.0 GWh |
#582 | Crane Creek Wind Energy Center | Riceville, IA | 302.0 GWh |
#583 | Mustang Hills LLC | Mojave, CA | 301.5 GWh |
#584 | Number Three Wind Project | Lowville, NY | 301.0 GWh |
#585 | Turkey Track Wind Energy LLC | Blackwell, TX | 300.7 GWh |
#586 | New Creek Wind | New Creek, WV | 300.4 GWh |
#587 | Crossroads Wind Farm | Canton, OK | 299.8 GWh |
#588 | Alta Wind Energy Center II | Mojave, CA | 299.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Alta Wind Energy Center III.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alta Wind Energy Center I | Mojave, CA | 361.0 GWh | 3.4 mi |
Alta Wind Energy Center II | Mojave, CA | 299.7 GWh | 0 mi |
Alta Wind Energy Center IV | Mojave, CA | 147.8 GWh | 3.2 mi |
Alta Wind Energy Center V | Mojave, CA | 288.4 GWh | 3.2 mi |
Alta Wind VIII | Mojave, CA | 222.0 GWh | 3.4 mi |
Brookfield Tehachapi 1 | Mojave, CA | 276.9 GWh | 3.2 mi |
Coram Energy LLC (4.5MW) | Tehachapi, CA | 246.4 GWh | 2.5 mi |
Coram Energy LLC (ECT) | Tehachapi, CA | 17.6 GWh | 3.5 mi |
Mojave 16/17/18 | Mojave, CA | 73.9 GWh | 2.3 mi |
Mojave 3/4/5 | Mojave, CA | 132.8 GWh | 2.8 mi |
Mustang Hills LLC | Mojave, CA | 301.5 GWh | 0.5 mi |
Oak Creek Energy Systems I | Mojave, CA | 54.5 GWh | 1.7 mi |
Oasis Alta | Mojave, CA | 57.0 GWh | 2.4 mi |
Oasis Wind | Mojave, CA | 238.4 GWh | 2.6 mi |
Ridgetop Energy LLC | Mojave, CA | 27.0 GWh | 3.4 mi |
SEPV Mojave West | Mojave, CA | 53.5 GWh | 0.7 mi |
TPC Windfarms LLC | Mojave, CA | 46.5 GWh | 2.8 mi |
Voyager Wind I | Mojave, CA | 406.4 GWh | 1.7 mi |
Voyager Wind III | Mojave, CA | 146.0 GWh | 3.1 mi |
Windhub Solar A LLC | Mojave, CA | 46.6 GWh | 0.5 mi |