Ivanpah 2
100302 Yates Well Road, Nipton, CA 92364Plant Summary Information
Ivanpah 2 is ranked #93 out of 885 solar farms in California in terms of total annual net electricity generation.
Ivanpah 2 generated 77.5 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Ivanpah 2 |
|---|---|
| Utility Name | NRG Energy Services |
| Location | San Bernardino County, CA |
| Initial Operation Date | December 2013 |
| Last Update | May 2026 |
| Annual Generation | 236.1 GWh |
| Annual Consumption | 3.1 M MMBtu |
| Ranked #2,337 out of 13,081 Power Plants Nationwide | |
| Ranked #409 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #233 out of 1,606 California Power Plants | |
| Ranked #93 out of 885 California Solar Power Plants | |
| Fuel Types | Solar : 96.8% Natural Gas : 3.2% |
Map of Ivanpah 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ivanpah 2.
Monthly Net Generation for Ivanpah 2
Monthly Plant Fuel Consumption for Ivanpah 2
Ivanpah 2 Details
| Summary Information | |
|---|---|
| Plant Name | Ivanpah 2 (57073) |
| Plant Address | 100302 Yates Well Road, Nipton, CA 92364 |
| Utility | NRG Energy Services (57499) |
| Latitude, Longitude | 35.55611, -115.46861 |
| Generation Dates on File | Jan 2014 to May 2026 |
| Initial Operation Date | December 2013 |
| Annual Generation | 236.1 GWh |
| Fuel Types | Solar : 96.8% Natural Gas : 3.2% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Wells |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | KERN RIVER GAS TRANSMISSION CO |
| Natural Gas Storage | No |
| Liquefied Natural Gas Storage | No |
Generator ST1 Details Operating December 2013
| Technology | Solar Thermal without Energy Storage |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 133.4 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 133.4 MW |
| Winter Capacity | 133.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2013 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar / Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
| Solar Details | |
| Lenses Mirrors | Yes |
|---|---|
| Dual Axis Tracking | Yes |
| Power Tower | Yes |
Ivanpah 2 Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Solar Partners I LLC | 1999 Harrsion StSte 2150, Oakland, CA 94612 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #399 | RE Mustang LLC | Lemoore, CA | 220.8 GWh |
| #400 | Galloway 2 Solar Farm | Paint Rock, TX | 231.9 GWh |
| #401 | Oak Trail Solar, LLC | Moyock, NC | 231.7 GWh |
| #402 | OCI Alamo 7 LLC | Haskell, TX | 231.6 GWh |
| #403 | Enterprise Solar, LLC | Newcastle, UT | 231.2 GWh |
| #404 | SR Clay, LLC | Fort Gaines, GA | 230.9 GWh |
| #405 | Dodson Creek Solar, LLC | Hillsboro, OH | 230.5 GWh |
| #406 | New Madrid Solar, LLC | Marston, MO | 229.7 GWh |
| #407 | Dressor Plains Solar, LLC | Herrick, IL | 228.9 GWh |
| #408 | Three Peaks Power | Cedar City, UT | 228.7 GWh |
| #410 | Sauk Solar Park | Union City, MI | 228.5 GWh |
| #411 | Felina | Fabens, TX | 228.2 GWh |
| #412 | Prairie Mist Solar | Montrose, AR | 228.2 GWh |
| #413 | Roadrunner Solar and BESS | Cochise, AZ | 219.3 GWh |
| #414 | Assembly Solar II LLC | Lennon, MI | 226.3 GWh |
| #415 | Albemarle Beach Solar | Roper, NC | 225.7 GWh |
| #416 | East Pecos Solar | McCamey, TX | 225.1 GWh |
| #417 | Prairie State Solar Project | Swanwick Township, IL | 224.3 GWh |
| #418 | West of the Pecos Solar | TBD, TX | 224.0 GWh |
| #419 | Ross County Solar, LLC | Greenfield, OH | 223.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ivanpah 2.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Boulder Solar II, LLC | Boulder City, NV | 104.0 GWh | 35.8 mi |
| Boulder Solar Power, LLC | Boulder City, NV | 276.9 GWh | 33.9 mi |
| CM10 | Boulder City, NV | 18.4 GWh | 31.1 mi |
| CM48 | Boulder City, NV | 89.7 GWh | 30.9 mi |
| Copper Mountain Solar 2 | Boulder City, NV | 726.0 GWh | 32.5 mi |
| Copper Mountain Solar 4, LLC | Boulder City, NV | 248.3 GWh | 31.8 mi |
| Copper Mountain Solar 5, LLC | Boulder City, NV | 695.5 GWh | 31.7 mi |
| Desert Star Energy Center | Boulder City, NV | 328.9 GWh | 31.1 mi |
| Goodsprings Waste Heat Recovery | Jean, NV | 8.7 GWh | 17.8 mi |
| Higgins Generating Station | Primm, NV | 1.7 TWh | 7.5 mi |
| IGS LAS1 | Henderson, NV | 2.1 GWh | 33.7 mi |
| Ivanpah 1 | Nipton, CA | 197.1 GWh | 1.8 mi |
| Ivanpah 3 | Nipton, CA | 211.3 GWh | 1.9 mi |
| Nevada Solar One | Boulder City, NV | 96.5 GWh | 32.1 mi |
| Searchlight Solar | Searchlight, NV | 40.7 GWh | 30.4 mi |
| Silver State Solar Power North | Primm, NV | 114.0 GWh | 17.7 mi |
| Silver State Solar Power South | Primm Valley, NV | 632.7 GWh | 9.8 mi |
| Stateline Solar | Nipton, CA | 640.1 GWh | 4.9 mi |
| Techren Solar I LLC | Boulder, NV | 222.9 GWh | 34.4 mi |
| Techren Solar III LLC | Boulder, NV | 53.2 GWh | 34.3 mi |