Big Creek 4
Sierra National Forest, North Fork, CA 93643Plant Summary Information
Big Creek 4 is ranked #32 out of 209 hydroelectric power plants in California in terms of total annual net electricity generation.
Big Creek 4 is comprised of 2 generators and generated 80.3 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Big Creek 4 |
|---|---|
| Utility Name | Southern California Edison Co |
| Location | Madera County, CA |
| Initial Operation Date | June 1951 |
| Last Update | Sep 2025 |
| Annual Generation | 322.1 GWh |
| Annual Consumption | 1.2 M MMBtu |
| Ranked #1,880 out of 12,539 Power Plants Nationwide | |
| Ranked #146 out of 1,332 Water Power Plants Nationwide | |
| Ranked #157 out of 1,600 California Power Plants | |
| Ranked #32 out of 209 California Water Power Plants | |
| Fuel Types | Water |
Map of Big Creek 4
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Big Creek 4.
Monthly Net Generation for Big Creek 4
Big Creek 4 Details
| Summary Information | |
|---|---|
| Plant Name | Big Creek 4 (320) |
| Plant Address | Sierra National Forest, North Fork, CA 93643 |
| Utility | Southern California Edison Co (17609) |
| Latitude, Longitude | 37.139, -119.4898 |
| Generation Dates on File | Jan 2001 to Sep 2025 |
| Initial Operation Date | June 1951 |
| Annual Generation | 322.1 GWh |
| Fuel Types | Water |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | San Joaquin River |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 220.00 kV |
| Energy Storage | No |
Generator 1 Details Operating June 1951
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 1951 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
Generator 2 Details Operating July 1951
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 1951 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
Big Creek 4 Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #136 | Pit 3 | Burney, CA | 332.8 GWh |
| #137 | Snettisham | Juneau, AK | 332.7 GWh |
| #138 | Bliss (ID) | Bliss, ID | 332.6 GWh |
| #139 | Pine Flat | Piedra, CA | 331.2 GWh |
| #140 | Rainbow (MT) | Great Falls, MT | 329.0 GWh |
| #141 | Ralston | Foresthill, CA | 328.1 GWh |
| #142 | Chelan | Wenatchee, WA | 328.0 GWh |
| #143 | Smithland Hydroelectric Plant | Smithland, KY | 328.0 GWh |
| #144 | Lower Baker | Concrete, WA | 326.7 GWh |
| #145 | Curtis Palmer Hydroelectric | Corinth, NY | 326.5 GWh |
| #147 | Judge F Carr | French Gulch, CA | 319.4 GWh |
| #148 | Upper Baker | Concrete, WA | 317.8 GWh |
| #149 | Stanislaus | Vallecito, CA | 315.8 GWh |
| #150 | Ozark | Ozark, AR | 314.7 GWh |
| #151 | Poe | Storrie, CA | 312.5 GWh |
| #152 | Morrow Point | Montrose, CO | 309.8 GWh |
| #153 | Thermalito | Oroville, CA | 308.5 GWh |
| #154 | Martin Dam | Dadeville, AL | 305.9 GWh |
| #155 | Cabot | Montague, MA | 304.2 GWh |
| #156 | Markland | Florence, IN | 298.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Big Creek 4.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| A G Wishon | North Fork, CA | 21.6 GWh | 1.2 mi |
| Big Creek 1 | Big Creek, CA | 405.3 GWh | 14.5 mi |
| Big Creek 2 | Auberry, CA | 355.2 GWh | 10.9 mi |
| Big Creek 2A | Auberry, CA | 211.3 GWh | 10.9 mi |
| Big Creek 3 | Auberry, CA | 598.2 GWh | 5.7 mi |
| Big Creek 8 | Auberry, CA | 173.8 GWh | 10.1 mi |
| Clovis East High School | Clovis, CA | 1.5 GWh | 24.9 mi |
| Clovis High School | Clovis, CA | 826.0 MWh | 24.6 mi |
| Clovis North High School | Fresno, CA | 1.5 GWh | 21.9 mi |
| Friant Hydro Facility | Friant, CA | 59.8 GWh | 15.3 mi |
| J S Eastwood | Shaver Lake, CA | 83.7 GWh | 12.9 mi |
| Kerckhoff 2 | Auberry, CA | 370.5 GWh | 6 mi |
| Kings River PH | Balch Camp, CA | 106.9 GWh | 25.2 mi |
| Kings River Syphon | Sanger, CA | 325.0 MWh | 26 mi |
| Mammoth Pool | North Fork, CA | 383.3 GWh | 10.1 mi |
| Pine Flat | Piedra, CA | 331.2 GWh | 23 mi |
| Portal | Lakeshore, CA | 18.7 GWh | 20 mi |
| Saint Agnes Medical Center | Fresno, CA | 33.0 GWh | 26 mi |
| SCCCD - Clovis Community College | Fresno, CA | 2.0 GWh | 22 mi |
| Site 980 65 | Madera, CA | 4.9 GWh | 23.3 mi |