Big Creek 4
Sierra National Forest, North Fork, CA 93643Plant Summary Information
Big Creek 4 is ranked #31 out of 187 hydroelectric power plants in California in terms of total annual net electricity generation.
Big Creek 4 is comprised of 2 generators and generated 66.7 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Big Creek 4 |
---|---|
Utility Name | Southern California Edison Co |
Location | Madera County, CA |
Initial Operation Date | June 1951 |
Last Update | Mar 2025 |
Annual Generation | 356.7 GWh |
Annual Consumption | 1.3 M MMBtu |
Ranked #1,658 out of 11,623 Power Plants Nationwide | |
Ranked #130 out of 1,242 Water Power Plants Nationwide | |
Ranked #134 out of 1,487 California Power Plants | |
Ranked #31 out of 187 California Water Power Plants | |
Fuel Types | Water |
Map of Big Creek 4
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Big Creek 4.
Monthly Net Generation for Big Creek 4
Big Creek 4 Details
Summary Information | |
---|---|
Plant Name | Big Creek 4 (320) |
Plant Address | Sierra National Forest, North Fork, CA 93643 |
Utility | Southern California Edison Co (17609) |
Latitude, Longitude | 37.139, -119.4898 |
Generation Dates on File | Jan 2001 to Mar 2025 |
Initial Operation Date | June 1951 |
Annual Generation | 356.7 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | San Joaquin River |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | No |
Generator 1 Details Operating June 1951
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1951 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 2 Details Operating July 1951
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1951 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Big Creek 4 Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#120 | Box Canyon | Ione, WA | 383.5 GWh |
#121 | Keswick | Redding, CA | 380.3 GWh |
#122 | James B Black | Big Bend, CA | 380.1 GWh |
#123 | Hartwell Lake | Hartwell, GA | 378.9 GWh |
#124 | Don Pedro | La Grange, CA | 377.1 GWh |
#125 | C J Strike | Bruneau, ID | 377.1 GWh |
#126 | Old Hickory | Hendersonville, TN | 368.7 GWh |
#127 | Belden | Belden, CA | 365.1 GWh |
#128 | Douglas Dam | Dandridge, TN | 364.9 GWh |
#129 | Caribou 2 | Belden, CA | 357.9 GWh |
#131 | Smithland Hydroelectric Plant | Smithland, KY | 351.9 GWh |
#132 | Donnells | None, CA | 347.7 GWh |
#133 | Pelton | Madras, OR | 347.5 GWh |
#134 | Pit 3 | Burney, CA | 345.4 GWh |
#135 | Logan Martin Dam | Vincent, AL | 343.5 GWh |
#136 | Dam 2 | Dumas, AR | 342.3 GWh |
#137 | Thermalito | Oroville, CA | 340.4 GWh |
#138 | John H Kerr | Boydton, VA | 340.0 GWh |
#139 | Stanislaus | Vallecito, CA | 334.5 GWh |
#140 | Lucky Peak Power Plant Project | Boise, ID | 331.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Big Creek 4.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
A G Wishon | North Fork, CA | 16.1 GWh | 1.2 mi |
Big Creek 1 | Big Creek, CA | 393.8 GWh | 14.5 mi |
Big Creek 2 | Auberry, CA | 296.2 GWh | 10.9 mi |
Big Creek 2A | Auberry, CA | 325.9 GWh | 10.9 mi |
Big Creek 3 | Auberry, CA | 586.5 GWh | 5.7 mi |
Big Creek 8 | Auberry, CA | 152.9 GWh | 10.1 mi |
Clovis East High School | Clovis, CA | 1.4 GWh | 24.9 mi |
Clovis High School | Clovis, CA | 1.3 GWh | 24.6 mi |
Clovis North High School | Fresno, CA | 1.4 GWh | 21.9 mi |
CSU Fresno Solar Project | Fresno, CA | 1.1 GWh | 26.7 mi |
Friant Hydro Facility | Friant, CA | 106.2 GWh | 15.3 mi |
J S Eastwood | Shaver Lake, CA | 7.3 GWh | 12.9 mi |
Kerckhoff 2 | Auberry, CA | 415.7 GWh | 6 mi |
Kings River PH | Balch Camp, CA | 206.7 GWh | 25.2 mi |
Mammoth Pool | North Fork, CA | 394.2 GWh | 10.1 mi |
Pine Flat | Piedra, CA | 448.7 GWh | 23 mi |
Portal | Lakeshore, CA | 21.2 GWh | 20 mi |
Saint Agnes Medical Center | Fresno, CA | 26.2 GWh | 26 mi |
SCCCD - Clovis Community College | Fresno, CA | 2.0 GWh | 22 mi |
Site 980 65 | Madera, CA | 6.3 GWh | 23.3 mi |