Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| R W Miller | RW Miller Power LLC | Palo Pinto, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 808.5 GWh | Sep 1968 | Feb 2026 | Natural Gas : 99.9% |
| R S Nelson | Entergy Louisiana LLC | Westlake, LA | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 TWh | Jan 1959 | Feb 2026 | Subbituminous Coal : 99.7% |
| R M Schahfer | Northern Indiana Pub Serv Co | Wheatfield, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 TWh | Nov 1976 | Feb 2026 | Bituminous Coal : 94.3% Natural Gas : 5.7% |
| R M Heskett | Montana-Dakota Utilities Co | Mandan, ND | Midcontinent Independent System Operator, Inc. (MISO) | 55.4 GWh | Oct 1954 | Feb 2026 | Natural Gas |
| R E Ginna Nuclear Power Plant | Constellation Nuclear | Ontario, NY | New York Independent System Operator (NYIS) | 5.0 TWh | Jun 1970 | Feb 2026 | Nuclear |
| R D Morrow | Cooperative Energy | Purvis, MS | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 TWh | Mar 1978 | Feb 2026 | Natural Gas |
| R D Green | Big Rivers Electric Corp | Robards, KY | Midcontinent Independent System Operator, Inc. (MISO) | 701.2 GWh | Nov 1979 | Feb 2026 | Natural Gas |
| R C Kirkwood | City & County of San Francisco | Groveland, CA | California Independent System Operator (CISO) | 461.9 GWh | Jan 1967 | Feb 2026 | Water |
| Quittacas Pond Solar | Consolidated Edison Solutions Inc. | Rochester, MA | ISO New England (ISNE) | 5.1 GWh | Nov 2013 | Dec 2024 | Solar |
| Quitman Solar | Quitman Solar, LLC | Quitman, GA | Southern Company Services, Inc. - Trans (SOCO) | 323.0 GWh | Nov 2019 | Feb 2026 | Solar |
| Quitman II Solar | Quitman II Solar, LLC | Quitman, GA | Southern Company Services, Inc. - Trans (SOCO) | 313.1 GWh | Nov 2021 | Feb 2026 | Solar |
| Quinto Solar PV Project | Arevon Energy, Inc. | Gustine, CA | California Independent System Operator (CISO) | 257.0 GWh | Oct 2015 | Dec 2024 | Solar |
| Quinhagak | Alaska Village Elec Coop, Inc | Quinhagak, AK | 2.3 GWh | Nov 1986 | Dec 2024 | Distillate Fuel Oil | |
| Quinebaug Solar | Quinebaug Solar, LLC | Canterbury, CT | ISO New England (ISNE) | 74.1 GWh | Nov 2021 | Feb 2026 | Solar |
| Quinebaug Lower Project | Quinebaug Associates LLC | Brooklyn, CT | ISO New England (ISNE) | 6.4 GWh | Mar 1990 | Dec 2024 | Water |
| Quindaro | City of Kansas City - (KS) | Kansas, KS | Southwest Power Pool (SWPP) | 10.4 GWh | Apr 1965 | Dec 2024 | Distillate Fuel Oil |
| Quincy Solar (NC) | Cypress Creek Renewables | Cumberland, NC | Duke Energy Progress East (CPLE) | 6.8 GWh | Oct 2015 | Dec 2024 | Solar |
| Quincy Solar (CO) | Terraform Arcadia | Watkins, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 3.4 GWh | Aug 2018 | Dec 2024 | Solar |
| Quincy II Solar Garden | AEP Onsite Partners, LLC | Aurora, CO | Public Service Company of Colorado (PSCO) | 3.3 GWh | Apr 2018 | Dec 2024 | Solar |
| Quincy Chute | PUD No 2 of Grant County | Quincy, WA | Public Utility District No. 2 of Grant County, Washington (GCPD) | 30.9 GWh | Sep 1985 | Oct 2024 | Water |
| Quilt Block Wind Farm LLC | Quilt Block Wind Farm LLC | Darlington, WI | Midcontinent Independent System Operator, Inc. (MISO) | 371.4 GWh | Aug 2017 | Feb 2026 | Wind |
| Quichapa 3 | Quichapa 3 LLC | Cedar City, UT | PacifiCorp East (PACE) | 7.0 GWh | Nov 2016 | Dec 2024 | Solar |
| Quichapa 2 | Quichapa 2 LLC | Cedar City, UT | PacifiCorp East (PACE) | 5.8 GWh | Nov 2016 | Dec 2024 | Solar |
| Quichapa 1 | Quichapa 1 LLC | Cedar City, UT | PacifiCorp East (PACE) | 6.6 GWh | Nov 2016 | Dec 2024 | Solar |
| Questa Solar Facility | Chevron Technology Ventures | Questa, NM | Public Service Company of New Mexico (PNM) | 804.0 MWh | Dec 2010 | Dec 2024 | Solar |
| Queens Creek | Duke Energy Carolinas, LLC | Topton, NC | Duke Energy Carolinas (DUK) | 3.0 GWh | Dec 1948 | Dec 2024 | Water |
| Queen Creek Solar Farm | Siete Solar LLC | Queen Creek, AZ | Salt River Project Agricultural Improvement and Power District (SRP) | 40.7 GWh | Sep 2012 | Dec 2024 | Solar |
| Queen Anne's County | Tesla Inc. | Centreville, MD | PJM Interconnection, LLC (PJM) | 2.6 GWh | Nov 2013 | Dec 2024 | Solar |
| Quay County | Southwestern Public Service Co | Tucumcari, NM | Southwest Power Pool (SWPP) | 378.0 MWh | Sep 2013 | Dec 2024 | Distillate Fuel Oil |
| Quartz Solar, LLC | Quartz Solar, LLC | Wynne, AR | Midcontinent Independent System Operator, Inc. (MISO) | 299.3 GWh | - | Feb 2026 | Solar |
| Quarter Horse Solar | Quarter Horse Farm LLC | Hampstead, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Oct 2018 | Dec 2024 | Solar |
| Quarry | Nautilus Solar Solutions | North Berwick, ME | ISO New England (ISNE) | 10.4 GWh | Nov 2022 | Dec 2024 | Solar |
| Quantum Choctaw Power LLC | Tennessee Valley Authority | Ackerman, MS | Tennessee Valley Authority (TVA) | 3.9 TWh | May 2006 | Feb 2026 | Natural Gas |
| Quakertown Solar Farm, LLC | NJR Clean Energy Ventures Corporation | Franklin Twp. / Pitts, NJ | PJM Interconnection, LLC (PJM) | 12.8 GWh | Sep 2018 | Dec 2024 | Solar |
| Quakertown PA BTM | American Mun Power-Ohio, Inc | Quakertown, PA | PJM Interconnection, LLC (PJM) | 544.0 MWh | Oct 2023 | Dec 2024 | Distillate Fuel Oil |
| Quaker | CVE US EI8 Quaker LLC | Queensbury, NY | New York Independent System Operator (NYIS) | 125.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Quail Run Energy Center | Quail Run Energy Partners, LP | Odessa, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 3.1 TWh | Apr 2002 | Dec 2024 | Natural Gas |
| Quail Ranch Solar and BESS | Quail Ranch Solar and Battery Energy Storage System | Rio Rancho, NM | Public Service Company of New Mexico (PNM) | 66.3 GWh | - | Feb 2026 | Solar |
| Quail Creek Hydro Plant #1 | Washington Cnty Wtr Consv Dist | Hurricane, UT | PacifiCorp East (PACE) | 8.6 GWh | May 1985 | Jan 2026 | Water |
| Quad Cities Generating Station | Constellation Nuclear | Cordova, IL | PJM Interconnection, LLC (PJM) | 15.3 TWh | Nov 1972 | Feb 2026 | Nuclear |
| Pyron Wind Farm LLC Hybrid | Big Sky Wind, LLC | Hermleigh, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 788.5 GWh | Jan 2009 | Feb 2026 | Wind |
| Pyrites Plant | Central Rivers Power US, LLC | Pyrites, NY | New York Independent System Operator (NYIS) | 25.3 GWh | Dec 1948 | Dec 2024 | Water |
| Pyramid | Tri-State G & T Assn, Inc | Lordsburg, NM | Public Service Company of New Mexico (PNM) | 269.7 GWh | Feb 2003 | Dec 2024 | Natural Gas : 99.9% |
| PWD Northeast WPCP Biogas Cogen Plant | Philadelphia Water Department | Philadelphia, PA | PJM Interconnection, LLC (PJM) | 31.9 GWh | Nov 2013 | Feb 2026 | Other Biomass Gas : 87.5% Natural Gas : 12.5% |
| PVN Milliken, LLC | PVN Milliken, LLC | Ontario, CA | California Independent System Operator (CISO) | 4.8 GWh | May 2017 | Dec 2024 | Solar |
| Puueo | Hawaii Electric Light Co Inc | Hilo, HI | 2.1 GWh | Nov 1918 | Feb 2026 | Water | |
| Putts Bridge | Central Rivers Power MA, LLC | Ludlow, MA | ISO New England (ISNE) | 16.0 GWh | Dec 1917 | Dec 2024 | Water |
| Putnam Solar 1B | Pivot Energy | Granville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | May 2024 | Dec 2024 | Solar |
| Putnam Solar 1 | Pivot Energy | Granville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Apr 2024 | Dec 2024 | Solar |
| Putnam Erikson 2 | SolAmerica Energy, LLC | Eatonton, GA | Southern Company Services, Inc. - Trans (SOCO) | 5.7 GWh | Oct 2021 | Dec 2024 | Solar |
| Putnam Erickson | Safari Energy, LLC | Eatonton, GA | Southern Company Services, Inc. - Trans (SOCO) | 5.6 GWh | Feb 2020 | Dec 2024 | Solar |
| Purple Lake | Metlakatla Power & Light | Metlakatla, AK | 12.3 GWh | Dec 1955 | Dec 2024 | Water | |
| Purdue University | Purdue University | West Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 98.7 GWh | Dec 1968 | Feb 2026 | Natural Gas : 92.5% Bituminous Coal : 7.5% |
| Purdue CHP | Duke Energy Indiana, LLC | West Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 123.1 GWh | Feb 2022 | Dec 2024 | Natural Gas |
| Puna Geothermal Venture I | Puna Geothermal Venture | Pahoa, HI | 258.9 GWh | Jul 1992 | Dec 2024 | Geothermal | |
| Puna | Hawaii Electric Light Co Inc | Keaau, HI | 105.9 GWh | Jul 1988 | Dec 2024 | Distillate Fuel Oil : 60.3% Residual Fuel Oil : 39.7% | |
| Pumpkin Hill | KEI (Maine) Power Management (II) LLC | Lowell, ME | ISO New England (ISNE) | 3.2 GWh | Feb 1987 | Dec 2024 | Water |
| Pumpjack Solar I | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 46.2 GWh | Dec 2014 | Dec 2024 | Solar |
| Pulpit Hill | LSE Fornax LLC | Amherst, MA | ISO New England (ISNE) | 7.2 GWh | Jun 2019 | Dec 2024 | Solar |
| Pullman Solar, LLC | AES Distributed Energy | Lee Township, MI | Midcontinent Independent System Operator, Inc. (MISO) | 38.0 GWh | Nov 2022 | Dec 2024 | Solar |
| Pulliam | Wisconsin Public Service Corp | Green Bay, WI | Midcontinent Independent System Operator, Inc. (MISO) | 110.7 GWh | Aug 1949 | Feb 2026 | Natural Gas |
| Puller Solar | Dominion Energy Inc. | Topping, VA | PJM Interconnection, LLC (PJM) | 26.1 GWh | Sep 2018 | Dec 2024 | Solar |
| Puente Hills Energy Recovery | Los Angeles County Sanitation | Whittier, CA | California Independent System Operator (CISO) | 147.4 GWh | Sep 1986 | Feb 2026 | Landfill Gas |
| Pueblo Airport Generating Station | Black Hills Service Company LLC | Pueblo, CO | Public Service Company of Colorado (PSCO) | 1.6 TWh | Dec 2011 | Feb 2026 | Natural Gas |
| PSREC/SIAD Solar | Plumas Sierra Rural Electric Coop | Herlong, CA | California Independent System Operator (CISO) | 6.2 GWh | Aug 2018 | Dec 2024 | Solar |
| PSEG Sewaren Generating Station | Sewaren Generating Station | Sewaren, NJ | PJM Interconnection, LLC (PJM) | 2.3 TWh | Oct 1948 | Feb 2026 | Natural Gas : 97.5% Distillate Fuel Oil : 2.5% |
| PSEG Salem Generating Station | PSEG Nuclear LLC | Hancocks Bridge, NJ | PJM Interconnection, LLC (PJM) | 18.8 TWh | May 1971 | Feb 2026 | Nuclear |
| PSEG Linden Generating Station | Linden Combined Cycle | Linden, NJ | PJM Interconnection, LLC (PJM) | 4.5 TWh | May 1995 | Feb 2026 | Natural Gas : 98.3% Distillate Fuel Oil : 1.7% |
| PSEG Kearny Generating Station | Kearny Generating Station | Kearny, NJ | PJM Interconnection, LLC (PJM) | 141.1 GWh | Apr 1967 | Dec 2024 | Natural Gas |
| PSEG Hope Creek Generating Station | PSEG Nuclear LLC | Hancocks Bridge, NJ | PJM Interconnection, LLC (PJM) | 9.0 TWh | Nov 1986 | Feb 2026 | Nuclear |
| PSEG Hackettstown | PSEG Solar Hackettstown LLC | Hackettstown, NJ | PJM Interconnection, LLC (PJM) | 2.2 GWh | Aug 2009 | Sep 2024 | Solar |
| PSEG Burlington Generating Station | Burlington Generating Station | Burlington, NJ | PJM Interconnection, LLC (PJM) | 49.9 GWh | May 1967 | Dec 2024 | Natural Gas : 99.8% |
| PS ST-8 Engine No 1 | City of Columbus - (OH) | Columbus, OH | PJM Interconnection, LLC (PJM) | 3.0 MWh | Dec 2007 | Dec 2023 | Distillate Fuel Oil |
| Pryor Mountain Wind | PacifiCorp | Bridger, MT | PacifiCorp East (PACE) | 748.6 GWh | Mar 2021 | Feb 2026 | Wind |
| Prudential 80 Livingston Roseland Solar | Prudential Drive Investors, LLC | Roseland, NJ | PJM Interconnection, LLC (PJM) | 2.6 GWh | Nov 2013 | Dec 2024 | Solar |
| Prudential 55 Livingston Roseland Solar | Prudential Drive Investors, LLC | Roseland, NJ | PJM Interconnection, LLC (PJM) | 1.0 GWh | Dec 2012 | Sep 2024 | Solar |
| Proxima | Proxima Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 463.5 GWh | Mar 2024 | Feb 2026 | Solar |
| Provo Power Plant | Utah Municipal Power Agency | Provo, UT | PacifiCorp East (PACE) | 4.9 GWh | Dec 2017 | Dec 2024 | Natural Gas |
| Providence Solar | Providence Solar Center, LLC | Madison, TN | Tennessee Valley Authority (TVA) | 30.9 GWh | Sep 2017 | Feb 2026 | Solar |
| Providence Heights Wind LLC | Avangrid Power LLC | Tiskilwa, IL | PJM Interconnection, LLC (PJM) | 141.2 GWh | Jul 2008 | Dec 2024 | Wind |
| Prospero Solar II | Prospero Solar II, LLC (Longroad) | Andrews, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 659.8 GWh | Jul 2021 | Feb 2026 | Solar |
| Prospero Solar | Prospero Energy Project, LLC (Longroad) | Andrews, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 739.4 GWh | May 2020 | Feb 2026 | Solar |
| Prosperity Wind | Prosperity Wind, LLC | Deland, IL | Midcontinent Independent System Operator, Inc. (MISO) | 833.2 GWh | - | Feb 2026 | Wind |
| Prosperity Solar Farm CSG | Empire District Electric Co | Joplin, MO | Southwest Power Pool (SWPP) | 3.9 GWh | Feb 2021 | Dec 2024 | Solar |
| Prosperity Energy Storage Facility Hybri | Public Service Co of NM | Albuquerque, NM | Public Service Company of New Mexico (PNM) | 297.0 MWh | Aug 2011 | Feb 2026 | Solar |
| Prospector Windfarm (Burnt River) | Prospector | Huntington, OR | Idaho Power Company (IPCO) | 18.4 GWh | Feb 2017 | Dec 2024 | Wind |
| Prospect Municipal | American Mun Power-Ohio, Inc | Prospect, OH | PJM Interconnection, LLC (PJM) | 98.0 MWh | Jan 1998 | Dec 2024 | Distillate Fuel Oil |
| Prospect 4 | PacifiCorp | Prospect, OR | PacifiCorp West (PACW) | 417.0 MWh | Oct 1944 | Dec 2024 | Water |
| Prospect 2 | PacifiCorp | Prospect, OR | PacifiCorp West (PACW) | 193.1 GWh | Dec 1927 | Dec 2024 | Water |
| Prospect 1 | PacifiCorp | Prospect, OR | PacifiCorp West (PACW) | 2.2 GWh | Dec 1911 | Jun 2024 | Water |
| Prospect | Erie Boulevard Hydropower LP | Prospect, NY | New York Independent System Operator (NYIS) | 69.1 GWh | Dec 1958 | Dec 2024 | Water |
| Prophet CSG | Prophet Solar, LLC | Rock Falls, IL | PJM Interconnection, LLC (PJM) | 4.8 GWh | Sep 2021 | Aug 2024 | Solar |
| Prologis L.P | Powerflex | Tracy, CA | California Independent System Operator (CISO) | 5.8 GWh | Jul 2018 | Dec 2024 | Solar |
| Progress Solar III, LLC | Oppidum Renewables USA, LLC | Maxton, NC | Duke Energy Progress East (CPLE) | 5.8 GWh | Oct 2012 | Dec 2024 | Solar |
| Progress Solar II, LLC | Oppidum Renewables USA, LLC | Fairmont, NC | Duke Energy Progress East (CPLE) | 5.2 GWh | Oct 2012 | Dec 2024 | Solar |
| Progress Solar 1, LLC | Oppidum Renewables USA, LLC | Bunn, NC | Duke Energy Progress East (CPLE) | 3.7 GWh | Sep 2012 | Dec 2024 | Solar |
| Progress Manis I | USF Surry, LLC | Laurinburg, NC | Duke Energy Progress East (CPLE) | 2.0 GWh | Mar 2012 | Dec 2024 | Solar |
| Progress Drive Generation Station | City of Shelby - (OH) | Shelby, OH | PJM Interconnection, LLC (PJM) | 103.0 MWh | Jun 2016 | Dec 2024 | Distillate Fuel Oil |
| Proctor | Green Mountain Power Corp | Proctor, VT | ISO New England (ISNE) | 31.2 GWh | Jul 1905 | Dec 2024 | Water |
| Procter & Gamble Mehoopany Mill | Procter & Gamble Ppr Prdts Co | Mehoopany, PA | PJM Interconnection, LLC (PJM) | 612.1 GWh | Sep 1984 | Dec 2024 | Natural Gas |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 184 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,677 | 13,090.02 GWh |
| Colorado | # 31 | 294 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 290 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 268 | 9,944.77 GWh |
| Minnesota | # 28 | 763 | 4,707.75 GWh |
| Mississippi | # 23 | 56 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 124 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 949 | 10,653.43 GWh |
| North Carolina | # 7 | 903 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 141 | 6,415.64 GWh |
| Oregon | # 21 | 270 | 6,135.97 GWh |
| Pennsylvania | # 2 | 251 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 236 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 239 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |