Red Horse 2

5529 N. Muleshoe Rd., Willcox, AZ 85643

Plant Summary Information

Red Horse 2 is ranked #24 out of 110 solar farms in Arizona in terms of total annual net electricity generation.

Red Horse 2 generated 43.3 GWh during the 3-month period between December 2024 to March 2025.

Plant NameRed Horse 2
Utility NameRed Horse 2
LocationCochise County, AZ
Initial Operation DateAugust 2015
Last Update Mar 2025
Annual Generation 193.9 GWh
Annual Consumption 721.3 k MMBtu
Ranked #2,408 out of 12,288 Power Plants Nationwide
Ranked #532 out of 6,174 Solar Power Plants Nationwide
Ranked #52 out of 163 Arizona Power Plants
Ranked #24 out of 110 Arizona Solar Power Plants
Fuel Types Solar : 70.1% Wind : 29.9%

Map of Red Horse 2

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Red Horse 2.

Create Your Account Today

Monthly Net Generation for Red Horse 2

30k30k24k24k18k18k12k12k6k6k0020162016201720172018201820192019202020202021202120222022202320232024202420252025
Download SVG
Download PNG
Download CSV

Red Horse 2 Details

Summary Information
Plant NameRed Horse 2 (58833)
Plant Address5529 N. Muleshoe Rd., Willcox, AZ 85643
UtilityRed Horse 2 (59146)
Latitude, Longitude32.28611, -110.08806
Generation Dates on FileAug 2015 to Mar 2025
Initial Operation DateAugust 2015
Annual Generation 193.9 GWh
Fuel Types Solar : 70.1% Wind : 29.9%
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusYes
FERC Exempt Wholesale Generator Docket Number15-1066-001
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityTucson Electric Power Company (TEPC)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerTucson Electric Power Co (24211) AZ
Grid Voltage 345.00 kV
Energy StorageNo

Generator RH2S Details Operating August 2015

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity51 MW
Summer Capacity51 MW
Winter Capacity51 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateAugust 2015
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
Azimuth Angle90
DC Net Capacity75.9 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Generator RH2W Details Operating August 2015

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipSingle Owner
Nameplate Capacity30 MW
Summer Capacity30 MW
Winter Capacity30 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateAugust 2015
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWind
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Turbines/Hydrokinetic Buoys15
Multiple FuelsNo
Turbine Details
Number Of Turbines15
Predominant Turbine ManufacturerVestas
Predominant Turbine Model NumberV110-2.0
Design Wind Speed14.3 MPH
Wind Quality Class3 - Low Wind
Turbine Hub Height Feet262.5

Red Horse 2 Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#522Lakeside Solar CenterOkeechobee, FL138.6 GWh
#523Blackwater River Solar Energy CenterMilton, FL138.6 GWh
#524Crooked RunWillard, NC137.9 GWh
#525Rodeo Solar CenterArcadia, FL137.7 GWh
#526Lake Mabel Solar and Battery StorageLake Wales, FL136.8 GWh
#527Citrus Solar Energy Center HybridArcadia, FL136.5 GWh
#528Greensville County Solar Project, LLCSkippers, VA136.5 GWh
#529Wheatridge HybridMorrow, OR711.9 GWh
#530Hammock SolarLabelle, FL136.3 GWh
#531Innovative Solar 46Hope Mills, NC136.1 GWh
#533Rutherford FarmForest City, NC135.9 GWh
#534Interstate Solar Energy CenterFt. Pierce, FL135.8 GWh
#535Trailside Solar CenterElkton, FL135.4 GWh
#536SR McKellarDenmark, TN135.3 GWh
#537Blackwater SolarBickley, GA135.1 GWh
#538Discovery Solar CenterMerrit Island, FL135.1 GWh
#539Dunns Bridge II SolarSan Pierre, IN133.7 GWh
#540Magnolia Springs Solar CenterGreen Cove Springs, FL134.3 GWh
#541Platteview Solar LLCAshland, NE134.0 GWh
#542Egret Solar CenterGlen St. Mary, FL134.0 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Red Horse 2.

Plant NamePlant LocationAnnual GenerationDistance
Actus Lend Lease DMAFBTucson, AZ2.5 GWh45.9 mi
Amazon TUS2Tucson, AZ5.5 GWh45.2 mi
Apache Solar ICochise, AZ55.5 GWh19 mi
Apache StationCochise, AZ2.3 TWh19.3 mi
Cogenra - TEPTucson, AZ1.9 GWh44.3 mi
Davis Monthan AFB (AZ) West AirfieldTucson, AZ30.2 GWh48.1 mi
FRB Solar FarmTucson, AZ4.1 GWh44.8 mi
Gato Montes Solar, LLCTucson, AZ7.4 GWh44.6 mi
H Wilson Sundt Generating StationTucson, AZ1.9 TWh48.5 mi
Iron Horse Battery Storage HybridTucson, AZ3.7 GWh44.7 mi
Pima Community CollegeTucson, AZ2.1 GWh43.4 mi
Prairie FireTucson, AZ7.8 GWh44.4 mi
Raptor RidgeTucson, AZ33.8 GWh47.2 mi
Red Horse IIIWilcox, AZ52.2 GWh10.6 mi
Sulphur SpringsCochise, AZ51.5 GWh18.3 mi
Tech Park SolarTucson, AZ11.8 GWh44.5 mi
TJX TucsonTucson, AZ2.2 GWh49.5 mi
UASTP ITucson, AZ1.6 GWh44.2 mi
University of Arizona - Biosphere 2Oracle, AZ53.0 MWh48.9 mi
Valencia SolarTucson, AZ24.6 GWh46.6 mi