RED-Rochester, LLC
Unnamed Road, Rochester, NY 14652Plant Summary Information
RED-Rochester, LLC is ranked #37 out of 944 power plants in New York in terms of total annual net electricity generation.
RED-Rochester, LLC is comprised of 7 generators and generated 93.4 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | RED-Rochester, LLC |
|---|---|
| Utility Name | RED-Rochester, LLC |
| Location | Monroe County, NY |
| Initial Operation Date | August 1954 |
| Last Update | Sep 2025 |
| Annual Generation | 338.4 GWh |
| Annual Consumption | 7.8 M MMBtu |
| Ranked #1,811 out of 12,539 Power Plants Nationwide | |
| Ranked #627 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #37 out of 944 New York Power Plants | |
| Ranked #26 out of 115 New York Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of RED-Rochester, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RED-Rochester, LLC.
Monthly Net Generation for RED-Rochester, LLC
RED-Rochester, LLC Details
| Summary Information | |
|---|---|
| Plant Name | RED-Rochester, LLC (10025) |
| Plant Address | Unnamed Road, Rochester, NY 14652 |
| Utility | RED-Rochester, LLC (5624) |
| Latitude, Longitude | 43.1989, -77.6319 |
| Generation Dates on File | Jan 2001 to Sep 2025 |
| Initial Operation Date | August 1954 |
| Annual Generation | 338.4 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | Yes |
| FERC Cogeneration Docket Number | 84-467-000 |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | New York Independent System Operator (NYIS) |
| NAICS Code | Miscellaneous Manufacturing (339) |
| Sector | Industrial CHP (7) |
| Water Source | Lake Ontario |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Rochester Gas & Electric Corp (16183) NY |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | ROCHESTER GAS AND ELEC CORP |
| Natural Gas Storage | No |
Generator KPR1 Details Operating June 1957
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 1957 |
| Combined Heat & Power | No |
| Sector Name | Industrial CHP (7) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator 41TG Details Operating May 1964
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 25.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 25.6 MW |
| Winter Capacity | 25.6 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 1964 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | B |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | RFO / NG |
|---|---|
Generator 42TG Details Operating August 1967
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 25.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 25.6 MW |
| Winter Capacity | 25.6 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 1967 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | B |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | RFO / NG |
|---|---|
Generator 17TG Details Operating December 1968
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 15 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 15 MW |
| Winter Capacity | 15 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 1968 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | B |
| Energy Source | Natural Gas / Distillate Fuel Oil / Residual Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | RFO / NG |
|---|---|
Generator 43TG Details Operating April 1969
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 25.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 25.6 MW |
| Winter Capacity | 25.6 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 1969 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | B |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | RFO / NG |
|---|---|
Generator 44TG Details Operating August 1987
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 25.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 25.6 MW |
| Winter Capacity | 25.6 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 1987 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | B |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | DFO / NG |
|---|---|
Generator 75TG Details Operating April 2015
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 2.2 MW |
| Winter Capacity | 2.2 MW |
| Minimum Load | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2015 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | B |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil / Residual Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
RED-Rochester, LLC Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Dean Baughman Industrial Services | 5704 Industrial Road, Fort Wayne, IN 46825 | Generator 12TG | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #617 | Sundance | Casa Grande, AZ | 354.8 GWh |
| #618 | Turtle Creek | Springfield, NE | 381.2 GWh |
| #619 | Woodsdale | Trenton, OH | 359.0 GWh |
| #620 | Valley (WI) | Milwaukee, WI | 353.5 GWh |
| #621 | Humboldt Bay | Eureka, CA | 354.2 GWh |
| #622 | HO Clarke Generating | Houston, TX | 351.7 GWh |
| #623 | Afton Generating Station | La Mesa, NM | 349.1 GWh |
| #624 | Henry County | New Castle, IN | 344.7 GWh |
| #625 | Nevada Cogen Associates 2 Black Mountain | Las Vegas, NV | 341.3 GWh |
| #626 | Wabash Valley Power IGCC | Terre Haute, IN | 339.7 GWh |
| #628 | Red Gate Power Plant | Edinburg, TX | 332.2 GWh |
| #629 | Plant 31 Paper Mill | West Monroe, LA | 523.0 GWh |
| #630 | Pearsall | Pearsall, TX | 329.9 GWh |
| #631 | Richland (OH) | Defiance, OH | 327.3 GWh |
| #632 | Malburg | Vernon, CA | 326.4 GWh |
| #633 | Arapahoe Combustion Turbine Project | Denver, CO | 325.0 GWh |
| #634 | Geismar | Geismar, LA | 514.1 GWh |
| #635 | Nevada Cogen Assoc#1 GarnetVly | Las Vegas, NV | 323.2 GWh |
| #636 | Knox Lee | Longview, TX | 321.3 GWh |
| #637 | Georgia-Pacific Muskogee | Muskogee, OK | 378.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding RED-Rochester, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Burritt Rd Community Solar Farm | Parma, NY | 3.3 GWh | 8.5 mi |
| City of Rochester Solar | Rochester, NY | 2.8 GWh | 2.8 mi |
| DG Moorman Creek | Hilton, NY | 4.3 GWh | 13.2 mi |
| Genesee - CCR Solar | Hilton, NY | 7.0 GWh | 10.9 mi |
| Harbec Energy | Ontario, NY | 598.0 MWh | 13.6 mi |
| Henrietta Solar | West Henrietta, NY | 7.5 GWh | 12.9 mi |
| High Acres Gas Recovery | Fairport, NY | 70.0 GWh | 15 mi |
| Monroe County Sites A & B | Webster, NY | 2.5 GWh | 12.2 mi |
| Monroe County Sites C, D, & E | Hilton, NY | 6.4 GWh | 9.9 mi |
| Ridgeway 1 | Rochester, NY | 9.4 GWh | 5.6 mi |
| Ridgeway 2 | Rochester, NY | 4.5 GWh | 5.6 mi |
| RIT Henrietta Solar 1, LLC | Rochester, NY | 2.4 GWh | 8.7 mi |
| Rochester 26 | Rochester, NY | 5.0 GWh | 3.4 mi |
| SCS Penfield One 010750 Penfield, LLC | Penfield, NY | 8.3 GWh | 13.5 mi |
| University of Rochester | Rochester, NY | 24.7 GWh | 5.2 mi |
| Washington St Community Solar Farm #1 | Ogden, NY | 3.2 GWh | 10.9 mi |
| Washington St Community Solar Farm #3 | Ogden, NY | 3.7 GWh | 10.8 mi |
| Washington St Community Solar Farm #4 | Ogden, NY | 2.3 GWh | 11.1 mi |
| Wheatland 2A Solar | Scottsville, NY | 7.9 GWh | 15.1 mi |
| Whittier | Ogden, NY | 2.4 GWh | 12 mi |