Redbed Plains Wind Farm
1421 Country Rd 1190, Tuttle, OK 73089Plant Summary Information
Redbed Plains Wind Farm is ranked #50 out of 68 wind farms in Oklahoma in terms of total annual net electricity generation.
Redbed Plains Wind Farm generated 78.3 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Redbed Plains Wind Farm |
|---|---|
| Utility Name | Redbed Plains Wind Farm LLC |
| Location | Grady County, OK |
| Initial Operation Date | July 2017 |
| Last Update | Oct 2025 |
| Annual Generation | 342.5 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,800 out of 12,553 Power Plants Nationwide | |
| Ranked #535 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #75 out of 134 Oklahoma Power Plants | |
| Ranked #50 out of 68 Oklahoma Wind Power Plants | |
| Fuel Types | Wind |
Map of Redbed Plains Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Redbed Plains Wind Farm.
Monthly Net Generation for Redbed Plains Wind Farm
Redbed Plains Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Redbed Plains Wind Farm (61221) |
| Plant Address | 1421 Country Rd 1190, Tuttle, OK 73089 |
| Utility | Redbed Plains Wind Farm LLC (60859) |
| Latitude, Longitude | 35.29076, -97.854 |
| Generation Dates on File | Aug 2017 to Oct 2025 |
| Initial Operation Date | July 2017 |
| Annual Generation | 342.5 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Oklahoma Gas & Electric Co (14063) OK |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator WT1 Details Operating July 2017
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 99.1 MW |
| Summer Capacity | 99.1 MW |
| Winter Capacity | 99.1 MW |
| Minimum Load | 7.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 48 |
| Turbine Details | |
| Number Of Turbines | 48 |
|---|---|
| Predominant Turbine Manufacturer | Gamesa |
| Predominant Turbine Model Number | G114-2.0 |
| Design Wind Speed | 19.5 MPH |
| Wind Quality Class | 1 - High Wind |
| Turbine Hub Height Feet | 93 |
Redbed Plains Wind Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #525 | Fenton Wind Farm | Chandler, MN | 350.1 GWh |
| #526 | Los Vientos Wind 1B | Sebastian, TX | 349.3 GWh |
| #527 | Hopkins Ridge Wind | Dayton, WA | 349.3 GWh |
| #528 | Crescent Wind Park | Hillsdale, MI | 347.8 GWh |
| #529 | Crossroads Wind Farm | Canton, OK | 347.6 GWh |
| #530 | Blue Summit II Wind | Vernon, TX | 346.3 GWh |
| #531 | Cedro Hill Wind LLC | Bruni, TX | 344.5 GWh |
| #532 | Mower County Wind Energy Center | Grand Meadow, MN | 343.3 GWh |
| #533 | Midland Wind | Kewane, IL | 343.2 GWh |
| #534 | Bent Tree Wind Farm Phase 1 | Hartland, MN | 343.0 GWh |
| #536 | Tyler Bluff Wind Project, LLC | Muenster, TX | 342.2 GWh |
| #537 | Mesquite Wind Power LLC | Abilene, TX | 341.7 GWh |
| #538 | Sweetwater Wind 2 LLC | Sweetwater, TX | 340.6 GWh |
| #539 | Bishop Hill II Wind Farm | Cambridge, IL | 339.9 GWh |
| #540 | Cameron Wind 1 LLC | Rio Hondo, TX | 337.6 GWh |
| #541 | Gratiot Farms Wind Project | Carson City, MI | 338.5 GWh |
| #542 | Inadale Wind Farm LLC Hybrid | Roscoe, TX | 335.1 GWh |
| #543 | Papalote Creek I LLC | Taft, TX | 335.8 GWh |
| #544 | Rugby Wind Power Project | Barton, ND | 335.4 GWh |
| #545 | Drift Sand Wind Project LLC | Rush Springs, OK | 335.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Redbed Plains Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Anadarko Plant | Anadarko, OK | 846.7 GWh | 25.6 mi |
| Cana Gas Processing Plant | Calumet, OK | 1.7 GWh | 21.8 mi |
| Canadian Hills Wind | El Rino, OK | 395.9 GWh | 25.3 mi |
| Drift Sand Wind Project LLC | Rush Springs, OK | 335.1 GWh | 32.5 mi |
| Frontier | Oklahoma City, OK | 576.2 GWh | 15.6 mi |
| Hinton | Hinton, OK | 4.9 GWh | 33.1 mi |
| McClain Energy Facility | Newcastle, OK | 1.2 TWh | 14.9 mi |
| Minco Wind I, LLC | Minco, OK | 304.9 GWh | 6.9 mi |
| Minco Wind II, LLC | Minco, OK | 251.0 GWh | 12.5 mi |
| Minco Wind III, LLC | Minco, OK | 362.5 GWh | 19.4 mi |
| Minco Wind IV, LLC | Hinton, OK | 471.3 GWh | 24.2 mi |
| Mustang | Oklahoma City, OK | 471.6 GWh | 16 mi |
| Norman Solar | Norman, OK | 4.5 GWh | 28.2 mi |
| Southwestern | Anadarko, OK | 779.4 GWh | 31 mi |
| Spring Creek Energy Center | Edmond, OK | 187.9 GWh | 33.1 mi |
| Tinker | Oklahoma City, OK | 30.7 GWh | 28.4 mi |
| Tuttle | Tuttle, OK | 4.2 GWh | 1.7 mi |
| WFEC GenCo LLC | Anadarko, OK | 83.7 GWh | 25.4 mi |
| White Rock East Wind Project | Anadarko, OK | 614.3 GWh | 28.8 mi |
| White Rock West Wind Project | Anadarko, OK | 351.0 GWh | 31.9 mi |