RE Solar, LLC
TBD, Redfield, SD 57469Plant Summary Information
RE Solar, LLC is ranked #43 out of 50 power plants in South Dakota in terms of total annual net electricity generation.
RE Solar, LLC generated 2.5 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | RE Solar, LLC |
|---|---|
| Utility Name | Redfield Energy, LLC |
| Location | Spink County, SD |
| Initial Operation Date | December 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 11.9 GWh |
| Annual Consumption | 40.6 k MMBtu |
| Ranked #5,975 out of 13,081 Power Plants Nationwide | |
| Ranked #1,831 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #43 out of 50 South Dakota Power Plants | |
| Ranked #3 out of 4 South Dakota Solar Power Plants | |
| Fuel Types | Solar |
Map of RE Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RE Solar, LLC.
Monthly Net Generation for RE Solar, LLC
Monthly Plant Fuel Consumption for RE Solar, LLC
RE Solar, LLC Details
| Summary Information | |
|---|---|
| Plant Name | RE Solar, LLC (69686) |
| Plant Address | TBD, Redfield, SD 57469 |
| Utility | Redfield Energy, LLC (67590) |
| Latitude, Longitude | 44.92385, -98.50219 |
| Generation Dates on File | Jan 2025 to Dec 2025 |
| Initial Operation Date | December 2024 |
| Annual Generation | 11.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Ethyl Alcohol Manufacturing (325193) |
| Sector | Industrial Non-CHP (6) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | NorthWestern Energy - (SD) (13809) SD |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
Generator SOLAR Details Operating December 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 8.3 MW |
| Summer Capacity | 8.3 MW |
| Winter Capacity | 8.3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2024 |
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 11.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 11.6 MW |
| Virtual Net Metering Agreement | No |
RE Solar, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1821 | Imeson Solar | Jscksonville, FL | 12.0 GWh |
| #1822 | People's | Fitzhugh, OK | 12.0 GWh |
| #1823 | Byron Highway Solar | Byron, CA | 12.0 GWh |
| #1824 | Bonduel Solar WI, LLC | Bonduel, WI | 12.0 GWh |
| #1825 | Spartan PV 1, LLC | East Lansing, MI | 12.0 GWh |
| #1826 | UC Davis South Campus | Davis, CA | 11.9 GWh |
| #1827 | Kinsley Landfill Solar | Sewell, NJ | 11.9 GWh |
| #1828 | Wright Kirby 1-5 CSG | Monticello, MN | 11.9 GWh |
| #1829 | Frenchtown III Solar | Frenchtown, NJ | 11.9 GWh |
| #1830 | Columbia Solar Energy, LLC | Pittsburg, CA | 11.9 GWh |
| #1832 | Rock Solid | Howell, NJ | 11.9 GWh |
| #1833 | Jackson Solar WI, LLC | Cedarburg, WI | 11.8 GWh |
| #1834 | Union Bridge Solar | Union Bridge, MD | 11.8 GWh |
| #1835 | Genentech Vacaville Meter #1 | Vacaville, CA | 11.7 GWh |
| #1836 | Raritan Solar - 53 Highway | Raritan Township, NJ | 11.6 GWh |
| #1837 | Whiskey Solar | Cumberland, NC | 11.6 GWh |
| #1838 | Springfield Solar Project | Springfield Twp., NJ | 11.6 GWh |
| #1839 | Giffen | TBD, CA | 11.6 GWh |
| #1840 | RE McKenzie 1 LLC | Galt, CA | 11.6 GWh |
| #1841 | RE McKenzie 2 LLC | Galt, CA | 11.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding RE Solar, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Aberdeen CT | Aberdeen, SD | 56.2 GWh | 35 mi |
| Big Bend Dam | Chamberlain, SD | 745.8 GWh | 76.9 mi |
| Bob Glanzer Generating Station | Huron, SD | 104.1 GWh | 41.6 mi |
| Crocker Wind Farm | Conde, SD | 774.8 GWh | 34.2 mi |
| Crowned Ridge Wind II Energy Center | Watertown, SD | 847.4 GWh | 77.1 mi |
| Dakota Range III Wind Project | Summit, SD | 594.1 GWh | 72.2 mi |
| Dakota Range Wind | Marvin, SD | 983.7 GWh | 75.1 mi |
| Day County Wind LLC | Conde, SD | 430.4 GWh | 35.4 mi |
| Groton Generation Station | Groton, SD | 220.7 GWh | 36.8 mi |
| Lake Preston | Lake Preston, SD | 135.0 MWh | 67.3 mi |
| North Bend Wind Project, LLC | Highmore, SD | 853.6 GWh | 68.3 mi |
| Oak Tree Energy | Clark, SD | 65.8 GWh | 37.2 mi |
| Prairie Winds SD1 | Crow Lake, SD | 358.1 GWh | 73.1 mi |
| Rolling Thunder Wind Farm Hybrid | Miller, SD | 84.2 GWh | 43.7 mi |
| South Dakota Wind Energy Cente | Highmore, SD | 83.3 GWh | 55.4 mi |
| Sweetland Wind Farm, LLC | St. Lawrence, SD | 830.5 GWh | 39.9 mi |
| Tatanka Wind Power LLC | Ashley, ND | 411.2 GWh | 74.7 mi |
| Triple H Wind Project | Highmore, SD | 1.0 TWh | 65.1 mi |
| Watertown Power Plant | Watertown, SD | 1.7 GWh | 68.2 mi |
| Wessington Springs | Wessington Springs, SD | 223.7 GWh | 63.8 mi |