RE Roserock
293 Mendal Road, Fort Stockton, TX 79735Plant Summary Information
RE Roserock is ranked #51 out of 191 solar farms in Texas in terms of total annual net electricity generation.
RE Roserock generated 104.4 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | RE Roserock |
---|---|
Utility Name | Southern Power Co |
Location | Pecos County, TX |
Initial Operation Date | November 2016 |
Last Update | May 2025 |
Annual Generation | 372.0 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #1,634 out of 12,312 Power Plants Nationwide | |
Ranked #147 out of 6,191 Solar Power Plants Nationwide | |
Ranked #312 out of 796 Texas Power Plants | |
Ranked #51 out of 191 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
RE Roserock (2014 to 2014) Southern Power Co (2015 to 2024) |
Map of RE Roserock
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RE Roserock.
Monthly Net Generation for RE Roserock
RE Roserock Details
Summary Information | |
---|---|
Plant Name | RE Roserock (59994) |
Plant Address | 293 Mendal Road, Fort Stockton, TX 79735 |
Utility | Southern Power Co (17650) |
Latitude, Longitude | 30.96021, -103.30666 |
Generation Dates on File | Nov 2016 to May 2025 |
Initial Operation Date | November 2016 |
Annual Generation | 372.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG15-43-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | AEP Texas North Company (20404) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator ROSEK Details Operating November 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 160 MW |
Summer Capacity | 157.5 MW |
Winter Capacity | 157.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 212.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
RE Roserock Plant Owners
Owner Name | Address | Ownership |
---|---|---|
RE Roserock | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#137 | Holstein 1 Solar Farm | Wingate, TX | 379.4 GWh |
#138 | Buckthorn Westex | Ft. Stockton, TX | 378.1 GWh |
#139 | Raceway Solar & Storage | Lancaster, CA | 365.8 GWh |
#140 | Madison Fields Solar Project, LLC | Irwin, OH | 376.0 GWh |
#141 | Indiana Crossroads Solar Park | Reynolds, IN | 375.8 GWh |
#142 | Hillcrest Solar | Mt. Orab, OH | 375.1 GWh |
#143 | Imperial Solar Energy Center West | Seeley, CA | 373.6 GWh |
#144 | Maverick Solar, LLC | Desert Center, CA | 372.4 GWh |
#145 | Montague Solar | Arlington, OR | 372.1 GWh |
#146 | Zier Solar | Brackettville, TX | 366.5 GWh |
#148 | Edwards Sanborn E1B | Mojave, CA | 351.3 GWh |
#149 | Orion I Solar Project | Burlington, TX | 367.8 GWh |
#150 | Wright Solar Park | Los Banos, CA | 366.9 GWh |
#151 | Blythe Solar III, LLC Hybrid | Blythe, CA | 352.8 GWh |
#152 | Solar Gen 2 Solar Facility | Calipatria, CA | 364.2 GWh |
#153 | Prairie Wolf Solar LLC | Ashmore Township, IL | 362.8 GWh |
#154 | Lund Hill Solar | Bickleton, WA | 359.6 GWh |
#155 | Fence Post Solar Hybrid Project, LLC | Corsicana, TX | 354.5 GWh |
#156 | Mammoth North Solar | Knox, IN | 357.7 GWh |
#157 | Aragorn Solar Project | Van Horn, TX | 356.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding RE Roserock.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo 6 | Fort Stockton, TX | 238.3 GWh | 61.4 mi |
Barilla Solar | Fort Stockton, TX | 53.7 GWh | 2.6 mi |
Buckthorn Westex | Ft. Stockton, TX | 378.1 GWh | 52.1 mi |
East Pecos Solar | McCamey, TX | 232.4 GWh | 60.8 mi |
Emerald Grove | Crane, TX | 272.2 GWh | 56.8 mi |
Greasewood II LLC | Girvin, TX | 471.9 GWh | 42.6 mi |
Greasewood Solar | Fort Stockton, TX | 239.0 GWh | 48.7 mi |
Hydra | Fort Stockton, TX | 27.6 GWh | 60.3 mi |
Oberon IB | Odessa, TX | 58.3 GWh | 62.1 mi |
Pavo | Fort Stockton, TX | 17.8 GWh | 52.7 mi |
Pearl Solar | Fort Stockton, TX | 104.6 GWh | 61.5 mi |
Permian Basin | Monahans, TX | 464.5 GWh | 47.6 mi |
Sherbino II | Ft. Stockton, TX | 570.6 GWh | 49.2 mi |
SolaireHolman Solar Project | Alpine, TX | 117.9 GWh | 36.3 mi |
Taygete Energy Project LLC | Coyanosa, TX | 460.9 GWh | 17.8 mi |
Taygete II Energy Project | Coyanosa, TX | 457.0 GWh | 18.8 mi |
WAL897 | Fort Stockton, TX | 103.0 MWh | 24.1 mi |
West of the Pecos Solar | TBD, TX | 254.8 GWh | 41 mi |
Woodward Mountain I | Girvin, TX | 168.0 GWh | 52.9 mi |
Woodward Mountain II | Girvin, TX | 168.0 GWh | 52.9 mi |