RE Roserock
293 Mendal Road, Fort Stockton, TX 79735Plant Summary Information
RE Roserock is ranked #66 out of 215 solar farms in Texas in terms of total annual net electricity generation.
RE Roserock generated 80.1 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | RE Roserock |
|---|---|
| Utility Name | Southern Power Co |
| Location | Pecos County, TX |
| Initial Operation Date | November 2016 |
| Last Update | Dec 2025 |
| Annual Generation | 378.0 GWh |
| Annual Consumption | 1.4 M MMBtu |
| Ranked #1,668 out of 12,613 Power Plants Nationwide | |
| Ranked #184 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #326 out of 816 Texas Power Plants | |
| Ranked #66 out of 215 Texas Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
RE Roserock (2014 to 2014) Southern Power Co (2015 to 2024) |
Map of RE Roserock
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RE Roserock.
Monthly Net Generation for RE Roserock
Monthly Plant Fuel Consumption for RE Roserock
RE Roserock Details
| Summary Information | |
|---|---|
| Plant Name | RE Roserock (59994) |
| Plant Address | 293 Mendal Road, Fort Stockton, TX 79735 |
| Utility | Southern Power Co (17650) |
| Latitude, Longitude | 30.96021, -103.30666 |
| Generation Dates on File | Nov 2016 to Dec 2025 |
| Initial Operation Date | November 2016 |
| Annual Generation | 378.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG15-43-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | AEP Texas North Company (20404) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator ROSEK Details Operating November 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 160 MW |
| Summer Capacity | 157.5 MW |
| Winter Capacity | 157.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2016 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 212.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
RE Roserock Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| RE Roserock | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #174 | Yellow Pine II | Enterprise, NV | 373.6 GWh |
| #175 | Yellow Pine Solar | Enterprise, NV | 376.3 GWh |
| #176 | Shakes Solar | Carrizo Springs, TX | 387.2 GWh |
| #177 | Cavalry Solar Hybrid | Monon, IN | 373.6 GWh |
| #178 | Castle Gap Solar Hybrid | McCarney, TX | 384.2 GWh |
| #179 | Madison Fields Solar Project, LLC | Irwin, OH | 381.0 GWh |
| #180 | Prairie Wolf Solar LLC | Ashmore Township, IL | 379.6 GWh |
| #181 | Montague Solar | Arlington, OR | 379.2 GWh |
| #182 | Indiana Crossroads Solar Park | Reynolds, IN | 378.9 GWh |
| #183 | Dry Lake Solar Energy Center | Moapa, NV | 362.3 GWh |
| #185 | Rambler | San Angelo, TX | 376.9 GWh |
| #186 | Raceway Solar & Storage | Lancaster, CA | 368.1 GWh |
| #187 | Big Star Solar, LLC (Hybrid) | Rosanky, TX | 372.1 GWh |
| #188 | Grant County | Town of Potosi, WI | 376.2 GWh |
| #189 | Imperial Solar Energy Center West | Seeley, CA | 373.6 GWh |
| #190 | Edwards Sanborn E1B | Mojave, CA | 354.7 GWh |
| #191 | Long Lake Solar, LLC | West Helena, AR | 371.4 GWh |
| #192 | Zier Solar | Brackettville, TX | 364.4 GWh |
| #193 | Blythe Solar III, LLC Hybrid | Blythe, CA | 354.6 GWh |
| #194 | Maverick Solar, LLC | Desert Center, CA | 369.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding RE Roserock.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alamo 6 | Fort Stockton, TX | 226.3 GWh | 61.4 mi |
| Barilla Solar | Fort Stockton, TX | 53.7 GWh | 2.6 mi |
| Buckthorn Westex | Ft. Stockton, TX | 356.6 GWh | 52.1 mi |
| Crane Solar Project | Crane, TX | 405.5 GWh | 62.3 mi |
| East Pecos Solar | McCamey, TX | 219.4 GWh | 60.8 mi |
| Emerald Grove | Crane, TX | 256.3 GWh | 56.8 mi |
| Greasewood II LLC | Girvin, TX | 796.9 GWh | 42.6 mi |
| Greasewood Solar | Fort Stockton, TX | 408.3 GWh | 48.7 mi |
| Oberon IB | Odessa, TX | 61.9 GWh | 62.1 mi |
| Pearl Solar | Fort Stockton, TX | 97.4 GWh | 61.5 mi |
| Permian Basin | Monahans, TX | 464.5 GWh | 47.6 mi |
| RE Maplewood | McCamey, TX | 526.4 GWh | 62.2 mi |
| Sherbino II | Ft. Stockton, TX | 570.6 GWh | 49.2 mi |
| SolaireHolman Solar Project | Alpine, TX | 106.0 GWh | 36.3 mi |
| Taygete Energy Project LLC | Coyanosa, TX | 547.5 GWh | 17.8 mi |
| Taygete II Energy Project | Coyanosa, TX | 455.8 GWh | 18.8 mi |
| WAL897 | Fort Stockton, TX | 103.0 MWh | 24.1 mi |
| West of the Pecos Solar | TBD, TX | 244.8 GWh | 41 mi |
| Woodward Mountain I | Girvin, TX | 168.0 GWh | 52.9 mi |
| Woodward Mountain II | Girvin, TX | 168.0 GWh | 52.9 mi |