RE Roserock
293 Mendal Road, Fort Stockton, TX 79735Plant Summary Information
RE Roserock is ranked #96 out of 255 solar farms in Texas in terms of total annual net electricity generation.
RE Roserock generated 107.3 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | RE Roserock |
|---|---|
| Utility Name | Southern Power Co |
| Location | Pecos County, TX |
| Initial Operation Date | November 2016 |
| Last Update | Aug 2026 |
| Annual Generation | 367.4 GWh |
| Annual Consumption | 1.4 M MMBtu |
| Ranked #1,781 out of 13,301 Power Plants Nationwide | |
| Ranked #251 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #377 out of 861 Texas Power Plants | |
| Ranked #96 out of 255 Texas Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
RE Roserock (2014 to 2014) Southern Power Co (2015 to 2025) |
Map of RE Roserock
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RE Roserock.
Monthly Net Generation for RE Roserock
Monthly Plant Fuel Consumption for RE Roserock
RE Roserock Details
| Summary Information | |
|---|---|
| Plant Name | RE Roserock (59994) |
| Plant Address | 293 Mendal Road, Fort Stockton, TX 79735 |
| Utility | Southern Power Co (17650) |
| Latitude, Longitude | 30.96021, -103.30666 |
| Generation Dates on File | Nov 2016 to Aug 2026 |
| Initial Operation Date | November 2016 |
| Annual Generation | 367.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG15-43-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | AEP Texas North Company (20404) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator ROSEK Details Operating November 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 160 MW |
| Summer Capacity | 157.5 MW |
| Winter Capacity | 157.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2016 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 212.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
RE Roserock Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| RE Roserock | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #241 | Solar Gen 2 Solar Facility | Calipatria, CA | 376.7 GWh |
| #242 | Cavalry Solar Hybrid | Monon, IN | 359.8 GWh |
| #243 | Scarlet II Hybrid | Cantua Creek, CA | 350.9 GWh |
| #244 | Swift Air Solar I | Goldsmith, TX | 373.0 GWh |
| #245 | Mustang Two | Lemoore, CA | 372.7 GWh |
| #246 | Markum Solar Farm | Valley Mills, TX | 372.2 GWh |
| #247 | Forgeview Solar | Blytheville, AR | 371.2 GWh |
| #248 | Lund Hill Solar | Bickleton, WA | 368.7 GWh |
| #249 | Prairie Wolf Solar LLC | North Ashmore, IL | 368.0 GWh |
| #250 | SR Russellville | Olmstead, KY | 367.8 GWh |
| #252 | Indiana Crossroads Solar Park | Reynolds, IN | 366.4 GWh |
| #253 | Edwards Sanborn E1B | Mojave, CA | 347.9 GWh |
| #254 | Darien Solar | Darien, WI | 361.6 GWh |
| #255 | Raceway Solar & Storage | Lancaster, CA | 351.4 GWh |
| #256 | Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 335.0 GWh |
| #257 | Rambler | San Angelo, TX | 359.4 GWh |
| #258 | Imperial Solar Energy Center West | Seeley, CA | 357.0 GWh |
| #259 | Blythe Solar III, LLC Hybrid | Blythe, CA | 342.0 GWh |
| #260 | Stillhouse Solar | Rogers, TX | 356.2 GWh |
| #261 | Hillcrest Solar | Mt. Orab, OH | 355.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding RE Roserock.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alamo 6 | Fort Stockton, TX | 206.6 GWh | 61.4 mi |
| Barilla Solar | Fort Stockton, TX | 52.9 GWh | 2.6 mi |
| Buckthorn Westex | Ft. Stockton, TX | 319.3 GWh | 52.1 mi |
| Crane Solar Project | Crane, TX | 387.3 GWh | 62.3 mi |
| East Pecos Solar | McCamey, TX | 238.0 GWh | 60.8 mi |
| Emerald Grove | Crane, TX | 225.6 GWh | 56.8 mi |
| Greasewood II LLC | Girvin, TX | 839.2 GWh | 42.6 mi |
| Greasewood Solar | Fort Stockton, TX | 448.2 GWh | 48.7 mi |
| Oberon IB | Odessa, TX | 46.3 GWh | 62.1 mi |
| Pearl Solar | Fort Stockton, TX | 86.1 GWh | 61.5 mi |
| Permian Basin | Monahans, TX | 669.5 GWh | 47.6 mi |
| RE Maplewood | McCamey, TX | 529.6 GWh | 62.2 mi |
| Sherbino II | Ft. Stockton, TX | 538.8 GWh | 49.2 mi |
| SolaireHolman Solar Project | Alpine, TX | 77.0 GWh | 36.3 mi |
| Taygete Energy Project LLC | Coyanosa, TX | 501.3 GWh | 17.8 mi |
| Taygete II Energy Project | Coyanosa, TX | 463.1 GWh | 18.8 mi |
| WAL897 | Fort Stockton, TX | 83.0 MWh | 24.1 mi |
| West of the Pecos Solar | TBD, TX | 207.7 GWh | 41 mi |
| Woodward Mountain I | Girvin, TX | 147.6 GWh | 52.9 mi |
| Woodward Mountain II | Girvin, TX | 132.5 GWh | 52.9 mi |