Redbud Power Plant
20922 Triple X Road, Luther, OK 73054Plant Summary Information
Redbud Power Plant is ranked #5 out of 136 power plants in Oklahoma in terms of total annual net electricity generation.
Redbud Power Plant is comprised of 8 generators and generated 618.0 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Redbud Power Plant |
|---|---|
| Utility Name | Oklahoma Gas & Electric Co |
| Location | Oklahoma County, OK |
| Initial Operation Date | May 2004 |
| Last Update | Dec 2025 |
| Annual Generation | 4.3 TWh |
| Annual Consumption | 35.1 M MMBtu |
| Ranked #260 out of 12,613 Power Plants Nationwide | |
| Ranked #131 out of 2,246 Natural Gas Power Plants Nationwide | |
| Ranked #5 out of 136 Oklahoma Power Plants | |
| Ranked #4 out of 37 Oklahoma Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Redbud Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Redbud Power Plant.
Monthly Net Generation for Redbud Power Plant
Monthly Plant Fuel Consumption for Redbud Power Plant
Redbud Power Plant Details
| Summary Information | |
|---|---|
| Plant Name | Redbud Power Plant (55463) |
| Plant Address | 20922 Triple X Road, Luther, OK 73054 |
| Utility | Oklahoma Gas & Electric Co (14063) |
| Latitude, Longitude | 35.6856, -97.2264 |
| Generation Dates on File | Jul 2004 to Dec 2025 |
| Initial Operation Date | May 2004 |
| Annual Generation | 4.3 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Oklahoma Gas & Electric Co (14063) OK |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | ONEOK GAS TRANSPORTATION |
| Natural Gas Storage | No |
Generator CT01 Details Operating May 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | G112 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | OKGEREDBUD1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | OKGEREDBUD1 |
| Nameplate Capacity | 198.9 MW |
| Nameplate Power Factor | 0.85 |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2004 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator CT02 Details Operating May 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | G113 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | OKGEREDBUD2 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | OKGEREDBUD2 |
| Nameplate Capacity | 198.9 MW |
| Nameplate Power Factor | 0.85 |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2004 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator CT03 Details Operating May 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | G114 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | OKGEREDBUD3 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | OKGEREDBUD3 |
| Nameplate Capacity | 198.9 MW |
| Nameplate Power Factor | 0.85 |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2004 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator CT04 Details Operating May 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | G115 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | OKGEREDBUD4 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | OKGEREDBUD4 |
| Nameplate Capacity | 198.9 MW |
| Nameplate Power Factor | 0.85 |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2004 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator ST01 Details Operating May 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | G112 |
| Ownership | Jointly Owned |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | OKGEREDBUD1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | OKGEREDBUD1 |
| Nameplate Capacity | 159.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 307 MW |
| Winter Capacity | 307 MW |
| Minimum Load | 150 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2004 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator ST02 Details Operating May 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | G113 |
| Ownership | Jointly Owned |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | OKGEREDBUD2 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | OKGEREDBUD2 |
| Nameplate Capacity | 159.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 301 MW |
| Winter Capacity | 301 MW |
| Minimum Load | 150 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2004 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator ST03 Details Operating May 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | G114 |
| Ownership | Jointly Owned |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | OKGEREDBUD3 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | OKGEREDBUD3 |
| Nameplate Capacity | 159.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 302 MW |
| Winter Capacity | 302 MW |
| Minimum Load | 150 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2004 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator ST04 Details Operating May 2004
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | G115 |
| Ownership | Jointly Owned |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | OKGEREDBUD4 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | OKGEREDBUD4 |
| Nameplate Capacity | 159.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 304 MW |
| Winter Capacity | 304 MW |
| Minimum Load | 150 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2004 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Redbud Power Plant Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Grand River Dam Authority | P.O. Box 609, Chouteau, OK 74337 | Generator CT01 | 36.00% |
| Oklahoma Gas & Electric Co | P O Box 321, Oklahoma City, OK 73101 | Generator CT01 | 51.00% |
| Oklahoma Municipal Power Authority | P O Box 1960, Edmond, OK 73083 | Generator CT01 | 13.00% |
| Grand River Dam Authority | P.O. Box 609, Chouteau, OK 74337 | Generator CT02 | 36.00% |
| Oklahoma Gas & Electric Co | P O Box 321, Oklahoma City, OK 73101 | Generator CT02 | 51.00% |
| Oklahoma Municipal Power Authority | P O Box 1960, Edmond, OK 73083 | Generator CT02 | 13.00% |
| Grand River Dam Authority | P.O. Box 609, Chouteau, OK 74337 | Generator CT03 | 36.00% |
| Oklahoma Gas & Electric Co | P O Box 321, Oklahoma City, OK 73101 | Generator CT03 | 51.00% |
| Oklahoma Municipal Power Authority | P O Box 1960, Edmond, OK 73083 | Generator CT03 | 13.00% |
| Grand River Dam Authority | P.O. Box 609, Chouteau, OK 74337 | Generator CT04 | 36.00% |
| Oklahoma Gas & Electric Co | P O Box 321, Oklahoma City, OK 73101 | Generator CT04 | 51.00% |
| Oklahoma Municipal Power Authority | P O Box 1960, Edmond, OK 73083 | Generator CT04 | 13.00% |
| Grand River Dam Authority | P.O. Box 609, Chouteau, OK 74337 | Generator ST01 | 36.00% |
| Oklahoma Gas & Electric Co | P O Box 321, Oklahoma City, OK 73101 | Generator ST01 | 51.00% |
| Oklahoma Municipal Power Authority | P O Box 1960, Edmond, OK 73083 | Generator ST01 | 13.00% |
| Grand River Dam Authority | P.O. Box 609, Chouteau, OK 74337 | Generator ST02 | 36.00% |
| Oklahoma Gas & Electric Co | P O Box 321, Oklahoma City, OK 73101 | Generator ST02 | 51.00% |
| Oklahoma Municipal Power Authority | P O Box 1960, Edmond, OK 73083 | Generator ST02 | 13.00% |
| Grand River Dam Authority | P.O. Box 609, Chouteau, OK 74337 | Generator ST03 | 36.00% |
| Oklahoma Gas & Electric Co | P O Box 321, Oklahoma City, OK 73101 | Generator ST03 | 51.00% |
| Oklahoma Municipal Power Authority | P O Box 1960, Edmond, OK 73083 | Generator ST03 | 13.00% |
| Grand River Dam Authority | P.O. Box 609, Chouteau, OK 74337 | Generator ST04 | 36.00% |
| Oklahoma Gas & Electric Co | P O Box 321, Oklahoma City, OK 73101 | Generator ST04 | 51.00% |
| Oklahoma Municipal Power Authority | P O Box 1960, Edmond, OK 73083 | Generator ST04 | 13.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #121 | Cottonwood Energy Company LP | Deweyville, TX | 4.6 TWh |
| #122 | Fayette Energy Facility | Masontown, PA | 4.6 TWh |
| #123 | Port Everglades | Ft. Lauderdale, FL | 4.5 TWh |
| #124 | Choctaw County | French Camp, MS | 4.5 TWh |
| #125 | Lower Mount Bethel Energy | Bangor, PA | 4.5 TWh |
| #126 | PSEG Linden Generating Station | Linden, NJ | 4.4 TWh |
| #127 | Allegheny Energy Units 3 4 & 5 | Springdale, PA | 4.4 TWh |
| #128 | Keys Energy Center | Brandywine, MD | 4.4 TWh |
| #129 | West Riverside Energy Center | Beloit, WI | 4.4 TWh |
| #130 | Lowman Energy Center | Leroy, AL | 4.3 TWh |
| #132 | West Phoenix | Phoenix, AZ | 4.3 TWh |
| #133 | Polk | Mulberry, FL | 4.3 TWh |
| #134 | ExxonMobil Beaumont Refinery | Beaumont, TX | 4.4 TWh |
| #135 | Quantum Choctaw Power LLC | Ackerman, MS | 4.3 TWh |
| #136 | Hill Top Energy Center, LLC | Carmichaels, PA | 4.3 TWh |
| #137 | Dresden Energy Facility | Dresden, OH | 4.2 TWh |
| #138 | Rio Nogales Power Project | Seguin, TX | 4.1 TWh |
| #139 | Delta Energy Center | Pittsburg, CA | 4.1 TWh |
| #140 | Fort St Vrain | Platteville, CO | 4.1 TWh |
| #141 | Ontelaunee Energy Center | Reading, PA | 4.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Redbud Power Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Armadillo Flats Wind Project, LLC | Enid, OK | 750.1 GWh | 46.6 mi |
| Canadian Hills Wind | El Rino, OK | 446.0 GWh | 45 mi |
| Covington Solar Farm | Covington, OK | 18.6 GWh | 48.1 mi |
| Cushing | Cushing, OK | 230.0 MWh | 32.5 mi |
| Frontier | Oklahoma City, OK | 525.1 GWh | 29 mi |
| Horizon Hill Wind Project | Crescent, OK | 624.3 GWh | 29.2 mi |
| Horseshoe Lake | Harrah, OK | 614.9 GWh | 12.5 mi |
| Kingfisher | Kingfisher, OK | 173.0 MWh | 41.1 mi |
| Kingfisher Wind LLC | Kingfisher, OK | 956.4 GWh | 32.7 mi |
| McClain Energy Facility | Newcastle, OK | 1.4 TWh | 33.7 mi |
| Mustang | Oklahoma City, OK | 491.4 GWh | 29.3 mi |
| Norman Solar | Norman, OK | 4.5 GWh | 32.6 mi |
| Red Dirt Wind Project | Hennessy, OK | 777.6 GWh | 40.2 mi |
| Redbed Plains Wind Farm | Tuttle, OK | 358.8 GWh | 44.6 mi |
| Spring Creek Energy Center | Edmond, OK | 187.9 GWh | 24.4 mi |
| Stillwater Energy Center | Stillwater, OK | 138.8 GWh | 34.6 mi |
| Tinker | Oklahoma City, OK | 30.7 GWh | 20.5 mi |
| Tuttle | Tuttle, OK | 3.9 GWh | 45.3 mi |
| Wagon Wheel Wind | OK | 181.2 GWh | 37.7 mi |
| Willow Creek Wind (OK) | Morrison, OK | 126.8 GWh | 39.2 mi |