RE Bagdad Solar I LLC
Terminus of Airport Road, Bagdad, AZ 86321Plant Summary Information
RE Bagdad Solar I LLC is ranked #48 out of 99 solar farms in Arizona in terms of total annual net electricity generation.
RE Bagdad Solar I LLC generated 8.0 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | RE Bagdad Solar I LLC |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Yavapai County, AZ |
Initial Operation Date | December 2011 |
Last Update | Dec 2022 |
Annual Generation | 30.0 GWh |
Annual Consumption | 108.7 k MMBtu |
Ranked #4,465 out of 11,455 Power Plants Nationwide | |
Ranked #879 out of 5,173 Solar Power Plants Nationwide | |
Ranked #94 out of 151 Arizona Power Plants | |
Ranked #48 out of 99 Arizona Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
RE Bagdad Solar 1 LLC (2013 to 2021) Duke Energy Renewables Services (2022 to 2022) |
Map of RE Bagdad Solar I LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RE Bagdad Solar I LLC.
Monthly Net Generation for RE Bagdad Solar I LLC
RE Bagdad Solar I LLC Details
Summary Information | |
---|---|
Plant Name | RE Bagdad Solar I LLC (57790) |
Plant Address | Terminus of Airport Road Bagdad, AZ 86321 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 34.58583, -113.17722 |
Generation Dates on File | Dec 2011 to Dec 2022 |
Initial Operation Date | December 2011 |
Annual Generation | 30.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF11-51-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Arizona Public Service Company (AZPS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Arizona Public Service Co (803) AZ |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 1 Details Operating December 2011
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 14.9 MW |
Summer Capacity | 14.9 MW |
Winter Capacity | 14.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 16.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
RE Bagdad Solar I LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#869 | Fox Squirrel Solar | OH | 30.8 GWh |
#870 | Lanikuhana Solar LLC | Mililani, HI | 30.7 GWh |
#871 | Huron Solar Station | Huron, CA | 30.7 GWh |
#872 | Grand Ridge Solar Farm | Marseilles, IL | 30.6 GWh |
#873 | Hollyfield | Manquin, VA | 30.6 GWh |
#874 | Two Mile Desert Project | Hertford, NC | 30.6 GWh |
#875 | Latitude Solar Center | Whiteville, TN | 30.6 GWh |
#876 | Boykin PV1 | Wade, NC | 30.5 GWh |
#877 | Gold Meadow Farms | Cranston, RI | 30.2 GWh |
#878 | Jicarilla Solar 1 LLC | Dulce, NM | 27.6 GWh |
#880 | Imperial Valley Solar Company 1 LLC | Niland, CA | 29.9 GWh |
#881 | Beaufort Solar, LLC | Chocowinity, NC | 29.9 GWh |
#882 | Whitehouse Solar Farm | Louisa, VA | 29.7 GWh |
#883 | Woodland Solar Farm | Smithfield, VA | 29.6 GWh |
#884 | North Lancaster Ranch | Lancaster, CA | 29.4 GWh |
#885 | Ellis Solar | Ithaca, NY | 29.4 GWh |
#886 | Giffen Solar Park | Cantua Creek, CA | 29.4 GWh |
#887 | Milo PV - BD Solar 1 LLC | Milo, ME | 29.3 GWh |
#888 | Elk Hill Solar 2 | Peters Township, PA | 29.3 GWh |
#889 | Camilla Solar Plant | Pelham, GA | 29.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding RE Bagdad Solar I LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Badger 1 | Tonopah, AZ | 40.1 GWh | 78 mi |
Black Mountain Generating Station | Golden Valley, AZ | 101.2 GWh | 63.8 mi |
Black Mountain Solar LLC | Golden Valley, AZ | 21.8 GWh | 63.5 mi |
Chino Solar Valley | Chino Valley, AZ | 50.2 GWh | 43.5 mi |
Gray Hawk Solar | Kingman, AZ | 145.4 GWh | 67.5 mi |
Griffith Energy LLC | Golden Valley, AZ | 4.2 TWh | 63.1 mi |
Harquahala Generating Project | Tonopah, AZ | 2.3 TWh | 76.8 mi |
Headgate Rock | Parker, AZ | 60.7 GWh | 69.1 mi |
Jacobson 5 MW Solar | Kingman, AZ | 9.8 GWh | 68.6 mi |
Kingman 1 | Kingman, AZ | 18.4 GWh | 63.6 mi |
La Senita | Kingman, AZ | 1.9 GWh | 65.2 mi |
Lake Pleasant WTP | Peoria, AZ | 15.6 GWh | 75.3 mi |
Mohave Energy - Hybrid | AZ | 2.3 GWh | 82.7 mi |
Northwest Regional | Surprise, AZ | 20.3 GWh | 74.2 mi |
OE_AZ1 | Salome, AZ | 86.5 GWh | 62.2 mi |
Parker Dam | Parker, CA | 404.3 GWh | 58.4 mi |
Perrin Ranch Wind LLC | Williams, AZ | 234.4 GWh | 76.9 mi |
Prescott Airport | Prescott, AZ | 4.1 GWh | 44.4 mi |
Prescott Solar Plant | Prescott, AZ | 23.9 GWh | 42.9 mi |
South Point Energy Center | Mohave Valley, AZ | 3.0 TWh | 79.3 mi |