Red Hawk
11600 South 363 rd Ave., Arlington, AZ 85322Plant Summary Information
Red Hawk is ranked #3 out of 177 power plants in Arizona in terms of total annual net electricity generation.
Red Hawk is comprised of 6 generators and generated 1.1 TWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Red Hawk |
|---|---|
| Utility Name | Arizona Public Service Co |
| Location | Maricopa County, AZ |
| Initial Operation Date | July 2002 |
| Last Update | Jun 2026 |
| Annual Generation | 5.1 TWh |
| Annual Consumption | 39.2 M MMBtu |
| Ranked #212 out of 13,094 Power Plants Nationwide | |
| Ranked #98 out of 2,208 Natural Gas Power Plants Nationwide | |
| Ranked #3 out of 177 Arizona Power Plants | |
| Ranked #1 out of 35 Arizona Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Red Hawk
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Red Hawk.
Monthly Net Generation for Red Hawk
Monthly Plant Fuel Consumption for Red Hawk
Red Hawk Details
| Summary Information | |
|---|---|
| Plant Name | Red Hawk (55455) |
| Plant Address | 11600 South 363 rd Ave., Arlington, AZ 85322 |
| Utility | Arizona Public Service Co (803) |
| Latitude, Longitude | 33.33456, -112.84064 |
| Generation Dates on File | Feb 2004 to Jun 2026 |
| Initial Operation Date | July 2002 |
| Annual Generation | 5.1 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Salt River Project (SRP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Salt River Project (16572) AZ |
| Grid Voltage | 500.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name |
EL PASO NATURAL GAS COMPANY LLC TRANSWESTERN PIPELINE COMPANY |
| Natural Gas Storage | No |
Generator CT1A Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 187.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 178 MW |
| Winter Capacity | 178 MW |
| Minimum Load | 75 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator CT1B Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 168.3 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 178 MW |
| Winter Capacity | 178 MW |
| Minimum Load | 75 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator CT2A Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 181.6 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 178 MW |
| Winter Capacity | 178 MW |
| Minimum Load | 75 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator CT2B Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 181.6 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 178 MW |
| Winter Capacity | 178 MW |
| Minimum Load | 75 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator ST1 Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 204 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 157 MW |
| Winter Capacity | 178 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator ST2 Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 204 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 157 MW |
| Winter Capacity | 178 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Red Hawk Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #88 | Plaquemine Cogeneration Plant | Plaquemine, LA | 5.5 TWh |
| #89 | Kendall County Generation Facility | Minooka, IL | 5.4 TWh |
| #90 | Central Alabama Generating Station | Billingsley, AL | 5.3 TWh |
| #91 | CPV Fairview Energy Center | Johnstown, PA | 5.3 TWh |
| #92 | Guadalupe Generating Station | Marion, TX | 5.3 TWh |
| #93 | Doswell Energy Center | Ashland, VA | 5.4 TWh |
| #94 | Fayette Energy Facility | Masontown, PA | 5.3 TWh |
| #95 | Allen | Memphis, TN | 5.1 TWh |
| #96 | John S Rainey | Starr, SC | 5.1 TWh |
| #97 | Batesville Generation Facility | Batesville, MS | 5.1 TWh |
| #99 | Choctaw County | French Camp, MS | 5.1 TWh |
| #100 | Cane Run | Louisville, KY | 5.1 TWh |
| #101 | Rowan | Salisbury, NC | 5.1 TWh |
| #102 | Wolf Hollow II | Granbury, TX | 5.0 TWh |
| #103 | Cottonwood Energy Company LP | Deweyville, TX | 5.0 TWh |
| #104 | Brandy Branch | Baldwin, FL | 5.0 TWh |
| #105 | Pasadena Cogeneration | Pasadena, TX | 5.0 TWh |
| #106 | Port Everglades | Ft. Lauderdale, FL | 5.0 TWh |
| #107 | E B Harris Electric Generating Plant | Autaugaville, AL | 4.9 TWh |
| #108 | Santan | Gilbert, AZ | 4.9 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Red Hawk.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Agave | Arlington, AZ | 303.6 GWh | 0.7 mi |
| Arlington Valley Energy Facility | Arlington, AZ | 3.2 TWh | 2.9 mi |
| Arlington Valley Solar Energy I | Arlington, AZ | 106.2 GWh | 2.5 mi |
| Arlington Valley Solar Energy II | Arlington, AZ | 336.0 GWh | 2.1 mi |
| Badger 1 | Tonopah, AZ | 29.6 GWh | 11.4 mi |
| Buckeye Union HS District 201 | Buckeye, AZ | 6.8 GWh | 16.3 mi |
| Mesquite Generating Station Block 1 | Arlington, AZ | 3.0 TWh | 1.5 mi |
| Mesquite Generating Station Block 2 | Arlington, AZ | 3.8 TWh | 1.5 mi |
| Mesquite Solar 1 | Tonopah, AZ | 392.2 GWh | 3.7 mi |
| Mesquite Solar 2, LLC | Tonopah, AZ | 253.7 GWh | 4.1 mi |
| Mesquite Solar 3, LLC | Tonopah, AZ | 443.8 GWh | 5.6 mi |
| Mesquite Solar 4, LLC | Tonopah, AZ | 140.8 GWh | 4.6 mi |
| Mesquite Solar 5, LLC | Tonopah, AZ | 124.9 GWh | 4.5 mi |
| Palo Verde | Wintersburg, AZ | 31.2 TWh | 3.9 mi |
| Papago PV | Tonopah, AZ | 123.5 GWh | 15.6 mi |
| Sun Pond | Tonopah, AZ | 70.0 GWh | 3.4 mi |
| Sun Streams 2 | Hassayampa, AZ | 307.8 GWh | 1.7 mi |
| Sun Streams 3 | Arlington, AZ | 413.1 GWh | 1.7 mi |
| Sun Streams 4 | Tonopah, AZ | 739.5 GWh | 4 mi |
| Sun Streams, LLC | Arlington, AZ | 369.0 GWh | 1 mi |