Red Hawk
11600 South 363 rd Ave., Arlington, AZ 85322Plant Summary Information
Red Hawk is ranked #4 out of 168 power plants in Arizona in terms of total annual net electricity generation.
Red Hawk is comprised of 6 generators and generated 1.8 TWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Red Hawk |
|---|---|
| Utility Name | Arizona Public Service Co |
| Location | Maricopa County, AZ |
| Initial Operation Date | July 2002 |
| Last Update | Sep 2025 |
| Annual Generation | 4.8 TWh |
| Annual Consumption | 37.2 M MMBtu |
| Ranked #231 out of 12,539 Power Plants Nationwide | |
| Ranked #111 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #4 out of 168 Arizona Power Plants | |
| Ranked #2 out of 35 Arizona Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Red Hawk
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Red Hawk.
Monthly Net Generation for Red Hawk
Red Hawk Details
| Summary Information | |
|---|---|
| Plant Name | Red Hawk (55455) |
| Plant Address | 11600 South 363 rd Ave., Arlington, AZ 85322 |
| Utility | Arizona Public Service Co (803) |
| Latitude, Longitude | 33.33456, -112.84064 |
| Generation Dates on File | Feb 2004 to Sep 2025 |
| Initial Operation Date | July 2002 |
| Annual Generation | 4.8 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Salt River Project (SRP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Salt River Project (16572) AZ |
| Grid Voltage | 500.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name |
EL PASO NATURAL GAS COMPANY LLC TRANSWESTERN PIPELINE COMPANY |
| Natural Gas Storage | No |
Generator CT1A Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 187.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 140 MW |
| Winter Capacity | 179 MW |
| Minimum Load | 75 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator CT1B Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 168.3 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 140 MW |
| Winter Capacity | 179 MW |
| Minimum Load | 75 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator CT2A Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 181.6 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 140 MW |
| Winter Capacity | 178 MW |
| Minimum Load | 75 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator CT2B Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 181.6 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 140 MW |
| Winter Capacity | 179 MW |
| Minimum Load | 75 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator ST1 Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 204 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 157 MW |
| Winter Capacity | 178 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator ST2 Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 204 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 157 MW |
| Winter Capacity | 178 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Red Hawk Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #101 | Oneta Energy Center | Broken Arrow, OK | 5.1 TWh |
| #102 | Waterford Power, LLC | Waterford, OH | 5.0 TWh |
| #103 | Pasadena Cogeneration | Pasadena, TX | 5.0 TWh |
| #104 | CPV Valley Energy Center | Wawayanda, NY | 5.0 TWh |
| #105 | Rio Nogales Power Project | Seguin, TX | 5.0 TWh |
| #106 | John S Rainey | Starr, SC | 5.0 TWh |
| #107 | Choctaw County | French Camp, MS | 4.9 TWh |
| #108 | Ironwood LLC | Lebanon, PA | 4.9 TWh |
| #109 | Hill Top Energy Center, LLC | Carmichaels, PA | 4.9 TWh |
| #110 | Tenaska Virginia Generating Station | Scottsville, VA | 4.9 TWh |
| #112 | Redbud Power Plant | Luther, OK | 4.8 TWh |
| #113 | H L Culbreath Bayside Power Station | Tampa, FL | 4.8 TWh |
| #114 | Morgan Energy Center | Decatur, AL | 4.8 TWh |
| #115 | PSEG Linden Generating Station | Linden, NJ | 4.8 TWh |
| #116 | John Sevier | Rogersville, TN | 4.7 TWh |
| #117 | Keys Energy Center | Brandywine, MD | 4.7 TWh |
| #118 | Formosa Utility Venture Ltd | Point Comfort, TX | 4.8 TWh |
| #119 | Taft Cogeneration Facility | Hahnville, LA | 4.7 TWh |
| #120 | Potomac Energy Center, LLC | Leesburg, VA | 4.6 TWh |
| #121 | West Riverside Energy Center | Beloit, WI | 4.6 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Red Hawk.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Agave | Arlington, AZ | 333.8 GWh | 0.7 mi |
| Arlington Valley Energy Facility | Arlington, AZ | 3.4 TWh | 2.9 mi |
| Arlington Valley Solar Energy II | Arlington, AZ | 341.2 GWh | 2.1 mi |
| Badger 1 | Tonopah, AZ | 33.2 GWh | 11.4 mi |
| Buckeye Union HS District 201 | Buckeye, AZ | 6.8 GWh | 16.3 mi |
| Desert Star Hybrid | Buckeye, AZ | 29.2 GWh | 16.7 mi |
| Harquahala 2 | Tonopah, AZ | 494.8 GWh | 17.8 mi |
| Mesquite Generating Station Block 1 | Arlington, AZ | 3.6 TWh | 1.5 mi |
| Mesquite Generating Station Block 2 | Arlington, AZ | 4.1 TWh | 1.5 mi |
| Mesquite Solar 1 | Tonopah, AZ | 401.4 GWh | 3.7 mi |
| Mesquite Solar 2, LLC | Tonopah, AZ | 288.9 GWh | 4.1 mi |
| Mesquite Solar 3, LLC | Tonopah, AZ | 448.5 GWh | 5.6 mi |
| Mesquite Solar 4, LLC | Tonopah, AZ | 147.7 GWh | 4.6 mi |
| Mesquite Solar 5, LLC | Tonopah, AZ | 134.8 GWh | 4.5 mi |
| Palo Verde | Wintersburg, AZ | 32.0 TWh | 3.9 mi |
| Sonoran Solar Energy | Buckeye, AZ | 1.1 TWh | 18.2 mi |
| Sun Streams 2 | Hassayampa, AZ | 327.6 GWh | 1.7 mi |
| Sun Streams 3 | Arlington, AZ | 469.7 GWh | 1.7 mi |
| Sun Streams 4 | Tonopah, AZ | 513.7 GWh | 4 mi |
| Sun Streams, LLC | Arlington, AZ | 405.6 GWh | 1 mi |