Red Tailed Hawk Solar LLC
6600 CR 421 RD, Pierce, TX 77467Plant Summary Information
Red Tailed Hawk Solar LLC is ranked #48 out of 188 solar farms in Texas in terms of total annual net electricity generation.
Red Tailed Hawk Solar LLC generated 139.5 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Red Tailed Hawk Solar LLC |
---|---|
Utility Name | Acciona Energy USA Global, LLC |
Location | Wharton County, TX |
Initial Operation Date | September 2024 |
Last Update | Mar 2025 |
Annual Generation | 360.9 GWh |
Annual Consumption | 1.2 M MMBtu |
Ranked #1,660 out of 12,288 Power Plants Nationwide | |
Ranked #139 out of 6,174 Solar Power Plants Nationwide | |
Ranked #315 out of 788 Texas Power Plants | |
Ranked #48 out of 188 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Red Tailed Hawk Solar LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Red Tailed Hawk Solar LLC.
Monthly Net Generation for Red Tailed Hawk Solar LLC
Red Tailed Hawk Solar LLC Details
Summary Information | |
---|---|
Plant Name | Red Tailed Hawk Solar LLC (66157) |
Plant Address | 6600 CR 421 RD, Pierce, TX 77467 |
Utility | Acciona Energy USA Global, LLC (57416) |
Latitude, Longitude | 29.15923, -96.14157 |
Generation Dates on File | Sep 2024 to Mar 2025 |
Initial Operation Date | September 2024 |
Annual Generation | 360.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating September 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 350 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 350 MW |
Winter Capacity | 350 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Bifacial | Yes |
Azimuth Angle | 90 |
DC Net Capacity | 458 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Red Tailed Hawk Solar LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#129 | Proxima | Crows Landing, CA | 355.1 GWh |
#130 | Maverick Solar, LLC | Desert Center, CA | 375.5 GWh |
#131 | RE Roserock | Fort Stockton, TX | 373.8 GWh |
#132 | Imperial Solar Energy Center West | Seeley, CA | 373.6 GWh |
#133 | Indiana Crossroads Solar Park | Reynolds, IN | 371.7 GWh |
#134 | Scarlet Solar (CA) | Fresno, CA | 364.8 GWh |
#135 | Prairie Wolf Solar LLC | Ashmore Township, IL | 367.9 GWh |
#136 | Edwards Sanborn E1B | Mojave, CA | 348.6 GWh |
#137 | Blythe Solar III, LLC Hybrid | Blythe, CA | 353.1 GWh |
#138 | Solar Gen 2 Solar Facility | Calipatria, CA | 364.2 GWh |
#140 | Zier Solar | Brackettville, TX | 354.4 GWh |
#141 | Copper Mountain Solar 2 | Boulder City, NV | 356.1 GWh |
#142 | Calhoun Solar | Battle Creek, MI | 356.0 GWh |
#143 | BigBeau Solar, LLC | Rosamond, CA | 353.1 GWh |
#144 | Wright Solar Park | Los Banos, CA | 354.3 GWh |
#145 | Dry Lake Solar Energy Center | Moapa, NV | 339.1 GWh |
#146 | Camilla Solar Energy Project | Camilla, GA | 353.8 GWh |
#147 | Lund Hill Solar | Bickleton, WA | 352.8 GWh |
#148 | Centinela Solar Energy | Calexico, CA | 352.7 GWh |
#149 | Newport Solar Project | Newport, AR | 352.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Red Tailed Hawk Solar LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aktina Solar | El Campo, TX | 913.9 GWh | 8.5 mi |
Bernard Creek Solar | Hungerford, TX | 438.8 GWh | 20.7 mi |
Brazoria County Solar Project (Danciger) | Damon, TX | 395.4 GWh | 23 mi |
Brazoria West | Damon, TX | 405.3 GWh | 29 mi |
Bronson | Beasley, TX | 9.6 GWh | 28.1 mi |
Cascade Solar (TX) | Wharton, TX | 17.3 GWh | 7.8 mi |
Colorado Bend Energy Center | Wharton, TX | 2.1 TWh | 9.9 mi |
Colorado Bend II | Wharton, TX | 6.8 TWh | 10.1 mi |
Cutlass Solar II | Richmond, TX | 289.5 GWh | 27 mi |
Fighting Jays Solar Project | Needville, TX | 282.9 GWh | 27.5 mi |
Fort Bend Solar LLC | East Bernard, TX | 449.3 GWh | 29.4 mi |
Ganado Solar | Gail, TX | 326.8 GWh | 23.6 mi |
HEB00292 | Bay City, TX | 246.0 MWh | 16.5 mi |
Newgulf Cogen | NewGulf, TX | 12.7 GWh | 16.3 mi |
Old 300 Solar Center, LLC | Needville, TX | 841.4 GWh | 22.5 mi |
Peyton Creek Wind Farm LLC | Bay City, TX | 344.8 GWh | 27.6 mi |
Second Division Solar | West Columbia, TX | 44.2 GWh | 24.1 mi |
South Texas Project | Wadsworth, TX | 19.7 TWh | 25.8 mi |
Sweeny Cogen Facility | Old Ocean, TX | 3.2 TWh | 24.7 mi |
Wagyu | Damon, TX | 207.7 GWh | 29.7 mi |