Red Cloud
540 N Webster, Red Cloud, NE 68970Plant Summary Information
Red Cloud is ranked #26 out of 45 distillate fuel oil power plants in Nebraska in terms of total annual net electricity generation.
Red Cloud is comprised of 4 generators and generated 9.5 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Red Cloud |
|---|---|
| Utility Name | City of Red Cloud - (NE) |
| Location | Webster County, NE |
| Initial Operation Date | January 1950 |
| Last Update | Dec 2024 |
| Annual Generation | 41.0 MWh |
| Annual Consumption | 487 MMBtu |
| Ranked #12,276 out of 12,539 Power Plants Nationwide | |
| Ranked #955 out of 1,236 Distillate Fuel Oil Power Plants Nationwide | |
| Ranked #107 out of 123 Nebraska Power Plants | |
| Ranked #26 out of 45 Nebraska Distillate Fuel Oil Power Plants | |
| Fuel Types | Distillate Fuel Oil |
Map of Red Cloud
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Red Cloud.
Monthly Net Generation for Red Cloud
Red Cloud Details
| Summary Information | |
|---|---|
| Plant Name | Red Cloud (2299) |
| Plant Address | 540 N Webster, Red Cloud, NE 68970 |
| Utility | City of Red Cloud - (NE) (15773) |
| Latitude, Longitude | 40.09795, -98.51903 |
| Generation Dates on File | Jan 2001 to Dec 2024 |
| Initial Operation Date | January 1950 |
| Annual Generation | 41.0 MWh |
| Fuel Types | Distillate Fuel Oil |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of Red Cloud - (NE) (15773) NE |
| Grid Voltage | 13.80 kV |
| Energy Storage | No |
Generator 2 Details Operating June 1953
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 0.6 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1953 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 3 Details Operating December 1960
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 1.2 MW |
| Winter Capacity | 1.2 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 1960 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 4 Details Operating August 1968
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 1.2 MW |
| Winter Capacity | 1.2 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 1968 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 5 Details Operating September 1973
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 2.2 MW |
| Winter Capacity | 2.2 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 1973 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Red Cloud Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #945 | Emory Decatur Hospital | Decatur, GA | 44.1 MWh |
| #946 | Pender | Pender, NE | 44.0 MWh |
| #947 | Shenandoah | Shenandoah, IA | 44.0 MWh |
| #948 | Alexandria | Alexandria, MN | 43.0 MWh |
| #949 | Wayne IC | Wayne, NE | 43.0 MWh |
| #950 | Powell Valley | Kyles Ford, TN | 43.0 MWh |
| #951 | Encogen | Bellingham, WA | 593.2 GWh |
| #952 | South Hampton | Southampton, NY | 42.0 MWh |
| #953 | Anadarko | Woodsfield, OH | 42.0 MWh |
| #954 | West Point (PA) | West Point, PA | 272.0 GWh |
| #956 | Thomson Reuters Data Center Bldg H | Eagan, MN | 41.0 MWh |
| #957 | Walnut | Turlock, CA | 429.0 MWh |
| #958 | Alliant SBD 9201 Norplex | Postville, IA | 40.2 MWh |
| #959 | Lenox | Lenox, IA | 39.0 MWh |
| #960 | Truman | Truman, MN | 39.0 MWh |
| #961 | Knoxville Industrial | Knoxville, IA | 39.0 MWh |
| #962 | Winston | Lakeland, FL | 39.0 MWh |
| #963 | Shelby, NC | Shelby, NC | 39.0 MWh |
| #964 | University of Michigan | Ann Arbor, MI | 208.5 GWh |
| #965 | MNDOT Standby Generation | St. Paul, MN | 38.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Red Cloud.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Belleville | Belleville, KS | 205.0 MWh | 50.4 mi |
| Beloit | Beloit, KS | 192.0 MWh | 49.2 mi |
| Beloit Solar LLC | Beloit, KS | 4.6 GWh | 49.9 mi |
| CCC Hastings Wind Turbine | Hastings, NE | 6.6 GWh | 34 mi |
| City Light & Water | Blue Hill, NE | 3.0 MWh | 16.3 mi |
| Cottonwood Wind Energy Center | Blue Hill, NE | 383.6 GWh | 11.5 mi |
| Deshler | Deshler, NE | 2.0 MWh | 42.1 mi |
| Deshler Solar | Hebron, NE | 2.3 GWh | 42.9 mi |
| Don Henry | Hastings, NE | 644.0 MWh | 33.9 mi |
| Franklin (NE) | Franklin, NE | 47.0 MWh | 22.8 mi |
| Hastings Community Solar Farm | Hastings, NE | 3.5 GWh | 35.1 mi |
| Hebron | Hebron, NE | 5.2 GWh | 50.1 mi |
| Kearney | Kearney, NE | 416.0 MWh | 51.8 mi |
| Kearney NPPD Solar Project | Kearney, NE | 8.6 GWh | 51.1 mi |
| Little Blue Wind Project, LLC | Blue Hill, NE | 931.4 GWh | 14.2 mi |
| North Denver | Hastings, NE | 9.8 GWh | 35.3 mi |
| Osborne | Osborne, KS | 15.7 MWh | 46.2 mi |
| Platte | Grand Island, NE | 358.8 GWh | 53.1 mi |
| SPPW1, LLC | Upland, NE | 25.2 GWh | 27.6 mi |
| Whelan Energy Center | Hastings, NE | 1.4 TWh | 35.1 mi |