Red Cloud
540 N Webster, Red Cloud, NE 68970Plant Summary Information
Red Cloud is ranked #21 out of 42 distillate fuel oil power plants in Nebraska in terms of total annual net electricity generation.
Red Cloud is comprised of 4 generators and generated 9.3 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Red Cloud |
|---|---|
| Utility Name | City of Red Cloud - (NE) |
| Location | Webster County, NE |
| Initial Operation Date | January 1950 |
| Last Update | Dec 2025 |
| Annual Generation | 37.0 MWh |
| Annual Consumption | 413 MMBtu |
| Ranked #12,871 out of 13,081 Power Plants Nationwide | |
| Ranked #997 out of 1,233 Distillate Fuel Oil Power Plants Nationwide | |
| Ranked #105 out of 120 Nebraska Power Plants | |
| Ranked #21 out of 42 Nebraska Distillate Fuel Oil Power Plants | |
| Fuel Types | Distillate Fuel Oil |
Map of Red Cloud
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Red Cloud.
Monthly Net Generation for Red Cloud
Monthly Plant Fuel Consumption for Red Cloud
Red Cloud Details
| Summary Information | |
|---|---|
| Plant Name | Red Cloud (2299) |
| Plant Address | 540 N Webster, Red Cloud, NE 68970 |
| Utility | City of Red Cloud - (NE) (15773) |
| Latitude, Longitude | 40.09795, -98.51903 |
| Generation Dates on File | Jan 2001 to Dec 2025 |
| Initial Operation Date | January 1950 |
| Annual Generation | 37.0 MWh |
| Fuel Types | Distillate Fuel Oil |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of Red Cloud - (NE) (15773) NE |
| Grid Voltage | 13.80 kV |
| Energy Storage | No |
Generator 2 Details Operating June 1953
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 0.6 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1953 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 3 Details Operating December 1960
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 1.2 MW |
| Winter Capacity | 1.2 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 1960 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 4 Details Operating August 1968
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 1.2 MW |
| Winter Capacity | 1.2 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 1968 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 5 Details Operating September 1973
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 2.2 MW |
| Winter Capacity | 2.2 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 1973 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Red Cloud Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #987 | Newman (PA) | Philadelphia, PA | 10.3 GWh |
| #988 | CG PS Victoria WWTP, LLC | Victoria, TX | 40.0 MWh |
| #989 | Butler Municipal Power Plant | Butler, MO | 39.0 MWh |
| #990 | Alliant SBD0201 Ingredion | Cedar Rapids, IA | 38.2 MWh |
| #991 | MU Combined Heat and Power Plant | Columbia, MO | 200.1 GWh |
| #992 | Carleton College | Northfield, MN | 8.0 GWh |
| #993 | Coggon | Coggon, IA | 38.0 MWh |
| #994 | St. Mary's Hospital For Children | Bayside, NY | 38.0 MWh |
| #995 | David City | David City, NE | 38.0 MWh |
| #996 | Flint River Operations | Oglethorpe, GA | 440.4 GWh |
| #998 | High Point, POLO | High Point, NC | 37.0 MWh |
| #999 | Jonesboro City Water & Light Plant | Jonesboro, AR | 56.6 GWh |
| #1000 | Girard | Girard, KS | 41.0 MWh |
| #1001 | Janesville | Janesville, MN | 35.0 MWh |
| #1002 | Berlin | Berlin, MD | 59.0 MWh |
| #1003 | Unionville | Unionville, MO | 34.0 MWh |
| #1004 | Halstad | Halstad, MN | 34.0 MWh |
| #1005 | West Group Data Center | Eagan, MN | 34.0 MWh |
| #1006 | Thomson Reuters Campus Bldg A-D | Eagan, MN | 34.0 MWh |
| #1007 | Laverne Diesel Generating Plant | Laverne, OK | 34.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Red Cloud.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Belleville | Belleville, KS | 513.0 MWh | 50.4 mi |
| Beloit | Beloit, KS | 47.0 MWh | 49.2 mi |
| Beloit Solar LLC | Beloit, KS | 4.1 GWh | 49.9 mi |
| CCC Hastings Wind Turbine | Hastings, NE | 6.8 GWh | 34 mi |
| City Light & Water | Blue Hill, NE | 3.0 MWh | 16.3 mi |
| Cottonwood Wind Energy Center | Blue Hill, NE | 366.6 GWh | 11.5 mi |
| Deshler | Deshler, NE | 2.0 MWh | 42.1 mi |
| Deshler Solar | Hebron, NE | 2.4 GWh | 42.9 mi |
| Don Henry | Hastings, NE | 452.0 MWh | 33.9 mi |
| Franklin (NE) | Franklin, NE | 60.0 MWh | 22.8 mi |
| Hastings Community Solar Farm | Hastings, NE | 3.4 GWh | 35.1 mi |
| Hebron | Hebron, NE | 2.5 GWh | 50.1 mi |
| Kearney | Kearney, NE | 375.0 MWh | 51.8 mi |
| Kearney NPPD Solar Project | Kearney, NE | 7.8 GWh | 51.1 mi |
| Little Blue Wind Project, LLC | Blue Hill, NE | 894.3 GWh | 14.2 mi |
| North Denver | Hastings, NE | 9.7 GWh | 35.3 mi |
| Osborne | Osborne, KS | 30.4 MWh | 46.2 mi |
| Platte | Grand Island, NE | 395.7 GWh | 53.1 mi |
| SPPW1, LLC | Upland, NE | 24.5 GWh | 27.6 mi |
| Whelan Energy Center | Hastings, NE | 1.3 TWh | 35.1 mi |