Red Mesa Solar Project
tbd, Red Mesa, UT 84534Plant Summary Information
Red Mesa Solar Project is ranked #35 out of 124 power plants in Utah in terms of total annual net electricity generation.
Red Mesa Solar Project generated 31.8 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Red Mesa Solar Project |
|---|---|
| Utility Name | NTUA Generation - Utah, LLC |
| Location | San Juan County, UT |
| Initial Operation Date | April 2023 |
| Last Update | Feb 2026 |
| Annual Generation | 185.2 GWh |
| Annual Consumption | 679.1 k MMBtu |
| Ranked #2,619 out of 12,637 Power Plants Nationwide | |
| Ranked #486 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #35 out of 124 Utah Power Plants | |
| Ranked #20 out of 56 Utah Solar Power Plants | |
| Fuel Types | Solar |
Map of Red Mesa Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Red Mesa Solar Project.
Monthly Net Generation for Red Mesa Solar Project
Monthly Plant Fuel Consumption for Red Mesa Solar Project
Red Mesa Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Red Mesa Solar Project (66404) |
| Plant Address | tbd, Red Mesa, UT 84534 |
| Utility | NTUA Generation - Utah, LLC (65488) |
| Latitude, Longitude | 37.12081, -109.41151 |
| Generation Dates on File | Apr 2023 to Feb 2026 |
| Initial Operation Date | April 2023 |
| Annual Generation | 185.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Navajo Tribal Utility Authority (13314) UT |
| Grid Voltage | 24.90 kV / 69.00 kV |
| Energy Storage | No |
Generator PV Details Operating April 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 72 MW |
| Summer Capacity | 72 MW |
| Winter Capacity | 72 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2023 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| DC Net Capacity | 93.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Red Mesa Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #476 | Harmony Florida Solar II | Kissimmee, FL | 186.5 GWh |
| #477 | Maplewood Solar | Climax, VA | 186.5 GWh |
| #478 | SR Ailey | Ailey, GA | 186.5 GWh |
| #479 | Georges Lake | TBD, FL | 186.5 GWh |
| #480 | OCI Alamo 5 LLC | Uvalde, TX | 186.4 GWh |
| #481 | Three Corners Solar | Unity, ME | 186.1 GWh |
| #482 | Desert Harvest II LLC | Desert Center, CA | 182.8 GWh |
| #483 | Graphite Solar I | Wellington, UT | 185.5 GWh |
| #484 | Spring Grove I | Spring Grove, VA | 185.5 GWh |
| #485 | County Line Renewable Energy Center | High Springs, FL | 185.5 GWh |
| #487 | Parliament Solar | TX | 184.5 GWh |
| #488 | FPL Shirer Branch Solar Energy Center | Clarksville, FL | 181.0 GWh |
| #489 | Hildreth Solar Power Plant | O'Brien, FL | 184.1 GWh |
| #490 | Taylor Creek Solar | Orlando, FL | 183.5 GWh |
| #491 | Charlie Creek Solar Power Plant | Wauchula, FL | 183.1 GWh |
| #492 | Lancaster Solar GA | Arlington, GA | 182.2 GWh |
| #493 | Luna Valley | Mendota, CA | 182.1 GWh |
| #494 | Long Creek | TBD, FL | 182.1 GWh |
| #495 | RE Astoria | Rosamond, CA | 182.0 GWh |
| #496 | Harmony Solar (FL) | St. Cloud, FL | 181.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Red Mesa Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ames Hydro | Ophir, CO | 6.6 GWh | 98.3 mi |
| Bluffview | Farmington, NM | 411.1 GWh | 71.7 mi |
| City of Gallup Solar | Gallup, NM | 9.0 GWh | 115.9 mi |
| Cortez Solar 1, LLC | Cortez, CO | 5.4 GWh | 51.5 mi |
| Cortez Solar 2, LLC | Cortez, CO | 9.5 GWh | 47.3 mi |
| Cortez Solar 3, LLC | Cortez, CO | 4.5 GWh | 47.5 mi |
| Dolores Canyon Solar | Cahone, CO | 54.5 GWh | 54.1 mi |
| Four Corners | Fruitland, NM | 9.3 TWh | 59.4 mi |
| Kayenta Solar Project | Kayenta, AZ | 120.6 GWh | 52.9 mi |
| Latigo Wind Park | Monticello, UT | 146.7 GWh | 53 mi |
| LPEA Sunnyside Solar 1 Facility | Durango, CO | 4.6 GWh | 85.5 mi |
| McPhee | Cortez, CO | 6.1 GWh | 55.7 mi |
| Navajo Dam | Farmington, NM | 72.0 GWh | 101.6 mi |
| San Juan Solar I | Kirtland, NM | 487.8 GWh | 61.6 mi |
| SMPA Solar 1 Community Solar | Bedrock, CO | 1.7 GWh | 86.6 mi |
| Tacoma | Durango, CO | 4.3 GWh | 93.7 mi |
| Towaoc | Cortez, CO | 9.8 GWh | 50.7 mi |
| Tri-County Water Hydropower Project | Ridgway, CO | 16.5 GWh | 118.9 mi |
| Vallecito Hydroelectric | Bayfield, CO | 19.1 GWh | 102.4 mi |
| Williams Ignacio Natural Gas Plant | Durango, CO | 46.7 GWh | 89.6 mi |