Red Mesa Solar Project
tbd, Red Mesa, UT 84534Plant Summary Information
Red Mesa Solar Project is ranked #34 out of 123 power plants in Utah in terms of total annual net electricity generation.
Red Mesa Solar Project generated 33.5 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Red Mesa Solar Project |
|---|---|
| Utility Name | NTUA Generation - Utah, LLC |
| Location | San Juan County, UT |
| Initial Operation Date | April 2023 |
| Last Update | Dec 2025 |
| Annual Generation | 188.4 GWh |
| Annual Consumption | 678.5 k MMBtu |
| Ranked #2,570 out of 12,613 Power Plants Nationwide | |
| Ranked #457 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #34 out of 123 Utah Power Plants | |
| Ranked #19 out of 55 Utah Solar Power Plants | |
| Fuel Types | Solar |
Map of Red Mesa Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Red Mesa Solar Project.
Monthly Net Generation for Red Mesa Solar Project
Monthly Plant Fuel Consumption for Red Mesa Solar Project
Red Mesa Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Red Mesa Solar Project (66404) |
| Plant Address | tbd, Red Mesa, UT 84534 |
| Utility | NTUA Generation - Utah, LLC (65488) |
| Latitude, Longitude | 37.12081, -109.41151 |
| Generation Dates on File | Apr 2023 to Dec 2025 |
| Initial Operation Date | April 2023 |
| Annual Generation | 188.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Navajo Tribal Utility Authority (13314) UT |
| Grid Voltage | 24.90 kV / 69.00 kV |
| Energy Storage | No |
Generator PV Details Operating April 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 72 MW |
| Summer Capacity | 72 MW |
| Winter Capacity | 72 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2023 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| DC Net Capacity | 93.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Red Mesa Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #447 | Second Division Solar | West Columbia, TX | 190.8 GWh |
| #448 | Tupelo Solar | San Mateo, FL | 190.8 GWh |
| #449 | White Pine Solar, LLC | Butler, GA | 189.6 GWh |
| #450 | Mule Creek Renewable Energy Center | Panama City, FL | 189.5 GWh |
| #451 | Gadsden County Solar | Chattahoochee, FL | 189.2 GWh |
| #452 | Nature Trail | Glen St Mary, FL | 189.2 GWh |
| #453 | Blackwater Solar | Bickley, GA | 188.7 GWh |
| #454 | Green Pasture | TBD, FL | 188.6 GWh |
| #455 | Fourmile Creek | Altha, FL | 188.3 GWh |
| #456 | Maplewood Solar | Climax, VA | 188.5 GWh |
| #458 | Graphite Solar I | Wellington, UT | 188.1 GWh |
| #459 | Fawn | TBD, FL | 187.5 GWh |
| #460 | Three Corners Solar | Unity, ME | 187.4 GWh |
| #461 | Wautoma Solar | Wautoma, WI | 187.1 GWh |
| #462 | Norton Creek | TBD, FL | 187.1 GWh |
| #463 | County Line Renewable Energy Center | High Springs, FL | 186.6 GWh |
| #464 | OCI Alamo 5 LLC | Uvalde, TX | 186.4 GWh |
| #465 | Georges Lake | TBD, FL | 185.3 GWh |
| #466 | FPL Shirer Branch Solar Energy Center | Clarksville, FL | 185.0 GWh |
| #467 | Hildreth Solar Power Plant | O'Brien, FL | 184.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Red Mesa Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ames Hydro | Ophir, CO | 6.6 GWh | 98.3 mi |
| Bluffview | Farmington, NM | 411.8 GWh | 71.7 mi |
| City of Gallup Solar | Gallup, NM | 9.0 GWh | 115.9 mi |
| Cortez Solar 1, LLC | Cortez, CO | 5.4 GWh | 51.5 mi |
| Cortez Solar 2, LLC | Cortez, CO | 9.5 GWh | 47.3 mi |
| Cortez Solar 3, LLC | Cortez, CO | 4.5 GWh | 47.5 mi |
| Dolores Canyon Solar | Cahone, CO | 21.5 GWh | 54.1 mi |
| Four Corners | Fruitland, NM | 8.2 TWh | 59.4 mi |
| Kayenta Solar Project | Kayenta, AZ | 121.0 GWh | 52.9 mi |
| Latigo Wind Park | Monticello, UT | 151.5 GWh | 53 mi |
| LPEA Sunnyside Solar 1 Facility | Durango, CO | 4.6 GWh | 85.5 mi |
| McPhee | Cortez, CO | 6.1 GWh | 55.7 mi |
| Navajo Dam | Farmington, NM | 72.0 GWh | 101.6 mi |
| San Juan Solar I | Kirtland, NM | 484.5 GWh | 61.6 mi |
| SMPA Solar 1 Community Solar | Bedrock, CO | 1.7 GWh | 86.6 mi |
| Tacoma | Durango, CO | 4.3 GWh | 93.7 mi |
| Towaoc | Cortez, CO | 9.8 GWh | 50.7 mi |
| Tri-County Water Hydropower Project | Ridgway, CO | 16.5 GWh | 118.9 mi |
| Vallecito Hydroelectric | Bayfield, CO | 19.1 GWh | 102.4 mi |
| Williams Ignacio Natural Gas Plant | Durango, CO | 46.6 GWh | 89.6 mi |