Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Fort Stewart Solar Facility | Georgia Power Co | Fort Stewart, GA | Southern Company Services, Inc. - Trans (SOCO) | 47.5 GWh | Sep 2016 | Dec 2025 | Solar |
| Lockheed Martin Solar System | Lockheed Martin Solar System | Oldsmar, FL | Duke Energy Florida, Inc. (FPC) | 3.2 GWh | Aug 2015 | Dec 2025 | Solar |
| OlivePV | Indiana Michigan Power Co | New Carlisle, IN | PJM Interconnection, LLC (PJM) | 8.3 GWh | Jul 2016 | Aug 2026 | Solar |
| Little Bear Solar 1, LLC | Little Bear Solar 1, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 73.3 GWh | Nov 2020 | Aug 2026 | Solar |
| Desert Quartzite | Desert Quartzite LLC | Blythe, CA | California Independent System Operator (CISO) | 842.3 GWh | Nov 2024 | Aug 2026 | Solar |
| UC Davis South Campus | Solar Star California XXXII, LLC | Davis, CA | California Independent System Operator (CISO) | 11.9 GWh | Feb 2015 | Dec 2025 | Solar |
| Lowell Solar Landfill | Heliovaas LLC | Lowell, MA | ISO New England (ISNE) | 1.2 GWh | Nov 2013 | Dec 2025 | Solar |
| Richland Solar Center | Onward Energy | Jeffersonville, GA | Southeastern Power Administration (SEPA) | 37.1 GWh | Nov 2015 | Dec 2025 | Solar |
| Marshall Solar Energy Project | Marshall Solar Energy Project | Marshall, MN | Midcontinent Independent System Operator, Inc. (MISO) | 98.1 GWh | Dec 2016 | Aug 2026 | Solar |
| Marine Corps Logistics Base Solar | Georgia Power Co | Albany, GA | Southern Company Services, Inc. - Trans (SOCO) | 55.0 GWh | Jan 2018 | Aug 2026 | Solar |
| Windhub Solar A LLC | EDP Renewables North America LLC | Mojave, CA | California Independent System Operator (CISO) | 48.0 GWh | Nov 2019 | Dec 2025 | Solar |
| North Rosamond Solar LLC | North Rosamond Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 346.7 GWh | May 2019 | Aug 2026 | Solar |
| Springbok Solar Farm 2 | 63SU 8me, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 397.1 GWh | Aug 2016 | Dec 2025 | Solar |
| Playa Solar 1, LLC | EDF Renewable Asset Holdings, Inc. | North Las Vegas, NV | Nevada Power Company (NEVP) | 186.5 GWh | Sep 2017 | Aug 2026 | Solar |
| Balsam | SRE Utility Solar 1, LLC | Sanford, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Nov 2015 | Dec 2025 | Solar |
| Hickory | Current Energy Group | Rose Hill, NC | Duke Energy Progress East (CPLE) | 6.5 GWh | Nov 2019 | Dec 2025 | Solar |
| Royal Solar | Cypress Creek Renewables | Godwin, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Jul 2015 | Dec 2025 | Solar |
| Kinston Solar | Cypress Creek Renewables | Grifton, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Jul 2015 | Dec 2025 | Solar |
| Laurinburg Solar | Cypress Creek Renewables | Laurinburg, NC | Duke Energy Progress East (CPLE) | 3.6 GWh | Jul 2015 | Dec 2025 | Solar |
| Indy Grocers | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 GWh | May 2015 | Dec 2025 | Solar |
| Newton Grove | SRE Utility Solar 1, LLC | Newton Grove, NC | Duke Energy Progress East (CPLE) | 3.0 GWh | Aug 2015 | Dec 2025 | Solar |
| Spring Hill Road | AES Distributed Energy | Barre, MA | ISO New England (ISNE) | 286.0 MWh | Nov 2015 | Aug 2026 | Solar |
| Kings Park Solar I | Madison Energy Investments LLC | Kings Park, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Jan 2019 | Dec 2025 | Solar |
| CNE at Cambridge MD | Luminace Solar Maryland II, LLC | Cambridge, MD | PJM Interconnection, LLC (PJM) | 5.6 GWh | Mar 2015 | Dec 2025 | Solar |
| Georgia Power at Wadley GA | Luminace Solar Georgia, LLC | Wadley, GA | Southeastern Power Administration (SEPA) | 1.9 GWh | Nov 2014 | Dec 2025 | Solar |
| Munich Re Plaza | Munich Reinsurance America, Inc | Princeton, NJ | PJM Interconnection, LLC (PJM) | 2.4 GWh | Jun 2012 | Dec 2025 | Solar |
| Pikes Peak Solar Garden 1 LLC CSG | Pikes Peak Solar Garden 1 LLC | Colorado Springs, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 4.2 GWh | Jun 2015 | Dec 2025 | Solar |
| Adams Community Solar Garden LLC | Adams Community Solar Garden LLC | Watkins, CO | Public Service Company of Colorado (PSCO) | 2.8 GWh | Jun 2015 | Dec 2025 | Solar |
| Adams Community Solar Garden III LLC | Adams Community Solar Garden III LLC | Watkins, CO | Public Service Company of Colorado (PSCO) | 2.8 GWh | Jun 2015 | Dec 2025 | Solar |
| Great Bay Solar 1 | Great Bay Solar I LLC | Princess Anne, MD | PJM Interconnection, LLC (PJM) | 137.5 GWh | Feb 2018 | Aug 2026 | Solar |
| North Star Solar Project | North Star Solar PV LLC | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 178.5 GWh | Nov 2016 | Aug 2026 | Solar |
| Watervliet PV | Indiana Michigan Power Co | Watervliet, MI | PJM Interconnection, LLC (PJM) | 7.2 GWh | Oct 2016 | Dec 2025 | Solar |
| RE Tranquillity | Southern Power Co | Cantua Creek, CA | California Independent System Operator (CISO) | 484.8 GWh | Jun 2016 | Dec 2025 | Solar |
| South Campus Solar | JPMorgan Chase Bank | Wilmington, DE | PJM Interconnection, LLC (PJM) | 2.0 GWh | Jul 2011 | Dec 2025 | Solar |
| Hunt Road Solar | Citizens Enterprises Corporation | Amesbury, MA | ISO New England (ISNE) | 7.0 GWh | Nov 2016 | Dec 2025 | Solar |
| Vance Solar Farm, LLC | Cypress Creek Renewables | Kittrell, NC | Duke Energy Carolinas (DUK) | 8.4 GWh | Dec 2015 | Dec 2025 | Solar |
| Cline Solar Farm, LLC | Cline Solar, LLC | Hildebran, NC | Duke Energy Carolinas (DUK) | 7.5 GWh | Jul 2017 | Dec 2025 | Solar |
| BG Stewart Solar Farm, LLC | Cypress Creek Renewables | Marshville, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Oct 2015 | Dec 2025 | Solar |
| Fiddler's Canyon 3 | SunE Solar XVII Project 3, LLC | Cedar City, UT | PacifiCorp East (PACE) | 7.4 GWh | Nov 2015 | Dec 2025 | Solar |
| Soluga Farms IV | SunStrong Management | Godwin, NC | Southeastern Power Administration (SEPA) | 5.3 GWh | Aug 2018 | Dec 2025 | Solar |
| Meadowbrook Solar Farm | Cypress Creek Renewables | Rockwell, NC | Duke Energy Carolinas (DUK) | 7.0 GWh | Oct 2016 | Dec 2025 | Solar |
| Coats Solar Farm, LLC | Cypress Creek Renewables | Coats, NC | Duke Energy Carolinas (DUK) | 7.8 GWh | Dec 2015 | Dec 2025 | Solar |
| Lillington Solar | Altus Power America Management, LLC | Lillington, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Sep 2017 | Dec 2025 | Solar |
| Great Valley Solar Portfolio Holdings, L | RWE Clean Energy | Cantua Creek, CA | California Independent System Operator (CISO) | 485.5 GWh | Nov 2017 | Aug 2026 | Solar |
| Iron Springs Solar, LLC | Clearway Renewable Operation & Maintenance LLC | Cedar City, UT | PacifiCorp East (PACE) | 212.0 GWh | Jul 2016 | Aug 2026 | Solar |
| Morgan Lancaster 1 | Terraform Arcadia | Lancaster, CA | California Independent System Operator (CISO) | 818.0 MWh | Aug 2015 | Dec 2025 | Solar |
| Conetoe II Solar, LLC | Deriva Energy | Conetoe, NC | PJM Interconnection, LLC (PJM) | 153.0 GWh | Nov 2015 | Dec 2025 | Solar |
| Granite Mountain Solar West, LLC | Clearway Renewable Operation & Maintenance LLC | Cedar City, UT | PacifiCorp East (PACE) | 120.9 GWh | Aug 2016 | Aug 2026 | Solar |
| Granite Mountain Solar East, LLC | Clearway Renewable Operation & Maintenance LLC | Cedar City, UT | PacifiCorp East (PACE) | 204.6 GWh | Aug 2016 | Aug 2026 | Solar |
| SR Camden | SR Camden, LLC | Camden, AR | Southwestern Power Administration (SPA) | 24.2 GWh | Nov 2015 | Aug 2026 | Solar |
| Bakersfield 111 | Bakersfield 111 LLC | Bakersfield, CA | PacifiCorp West (PACW) | 1.9 GWh | Jun 2015 | Dec 2024 | Solar |
| Yadkinville Solar | Oppidum Renewables USA, LLC | Yadkinville, NC | Duke Energy Carolinas (DUK) | 4.0 GWh | Nov 2015 | Dec 2025 | Solar |
| Albertson Solar LLC | Albertson Solar LLC | Albertson, NC | Duke Energy Progress East (CPLE) | 9.9 GWh | Jun 2015 | Dec 2025 | Solar |
| Kings Park Solar II | Madison Energy Investments LLC | Kings Park, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Jan 2019 | Dec 2025 | Solar |
| Beaufort Solar, LLC | Capital Power Corporation | Chocowinity, NC | Duke Energy Progress East (CPLE) | 27.3 GWh | Nov 2015 | Dec 2025 | Solar |
| Butler Solar Farm 20 | Southern Power Co | Butler, GA | Southern Company Services, Inc. - Trans (SOCO) | 41.6 GWh | Jan 2016 | Dec 2025 | Solar |
| Pawpaw Solar Plant | Southern Power Co | Butler, GA | Southern Company Services, Inc. - Trans (SOCO) | 62.5 GWh | Feb 2016 | Dec 2025 | Solar |
| Butler Solar Project 103 | Southern Power Co | Butler, GA | Southern Company Services, Inc. - Trans (SOCO) | 224.4 GWh | Nov 2016 | Aug 2026 | Solar |
| Taylor County Solar | Southern Power Co | Butler, GA | Southern Company Services, Inc. - Trans (SOCO) | 257.2 GWh | Oct 2016 | Dec 2025 | Solar |
| SunEnergy1-Scotland Neck, LLC | SunEnergy1-Scotland Neck, LLC | Scotland Neck, NC | PJM Interconnection, LLC (PJM) | 5.1 GWh | Nov 2014 | Dec 2025 | Solar |
| Choco Solar, LLC | Choco Solar LLC | Chocowinity, NC | Duke Energy Progress East (CPLE) | 9.6 GWh | Nov 2014 | Dec 2025 | Solar |
| Corcoran Solar 3 | RWE Clean Energy | Corcoran, CA | California Independent System Operator (CISO) | 48.1 GWh | Jan 2016 | Dec 2025 | Solar |
| Sunshine Valley Solar | EDP Renewables North America LLC | Armagosa, NV | California Independent System Operator (CISO) | 246.7 GWh | Nov 2019 | Aug 2026 | Solar |
| Western Branch High School | Virginia Electric & Power Co | Chesapeake, VA | PJM Interconnection, LLC (PJM) | 921.0 MWh | Mar 2016 | Apr 2025 | Solar |
| Mount Olive Solar | AES Distributed Energy | Mount Olive, NC | Duke Energy Progress East (CPLE) | 3.1 GWh | Nov 2016 | Dec 2025 | Solar |
| KDC Solar PR1, LLC | CleanCapital Holdings | Jackson, NJ | PJM Interconnection, LLC (PJM) | 27.6 GWh | May 2019 | Dec 2025 | Solar |
| Freemont Solar Center LLC | Heelstone Energy Holdings, LLC | Stanley, NC | Duke Energy Carolinas (DUK) | 8.3 GWh | Nov 2016 | Dec 2025 | Solar |
| Crestwood Solar Center LLC | SRE Utility Solar 1, LLC | Oxford, NC | Duke Energy Progress East (CPLE) | 6.0 GWh | Mar 2016 | Dec 2025 | Solar |
| Oro Loma | RWE Clean Energy | Oro Loma, CA | California Independent System Operator (CISO) | 49.2 GWh | Dec 2016 | Dec 2025 | Solar |
| SunE- E Philadelphia Ontario | SunEdison LLC | Ontario, CA | California Independent System Operator (CISO) | 1.5 GWh | Feb 2016 | Dec 2025 | Solar |
| Pollocksville Solar | Cypress Creek Renewables | Pollocksville, NC | Duke Energy Progress East (CPLE) | 7.4 GWh | Nov 2016 | Dec 2025 | Solar |
| Nellis Solar PV II | Nevada Power Co | North Las Vegas, NV | Nevada Power Company (NEVP) | 13.9 GWh | Oct 2015 | Aug 2026 | Solar |
| Hecate Energy Beacon Solar 3 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 114.6 GWh | Nov 2016 | Aug 2026 | Solar |
| Sterlington Greenworks LLC | AES Distributed Energy | Calverton, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Sep 2015 | Dec 2025 | Solar |
| Leavenworth Greenworks LLC | AES Distributed Energy | Calverton, NY | New York Independent System Operator (NYIS) | 17.7 GWh | May 2016 | Dec 2025 | Solar |
| Medford WWTP | NJR Clean Energy Ventures Corporation | Medford, NJ | PJM Interconnection, LLC (PJM) | 2.0 GWh | Jul 2013 | Dec 2025 | Solar |
| Reeves South | NJR Clean Energy Ventures Corporation | Medford, NJ | PJM Interconnection, LLC (PJM) | 1.7 GWh | Nov 2013 | Dec 2025 | Solar |
| California PV Energy at ISD WWTP | California PV Energy LLC | Oakley, CA | California Independent System Operator (CISO) | 1.9 GWh | Jul 2014 | Dec 2025 | Solar |
| Carrier Clinic | Sunlight General Solar Fund II, LLC | Belle Mead, NJ | PJM Interconnection, LLC (PJM) | 1.7 GWh | Sep 2009 | Dec 2025 | Solar |
| Hanford 1 and 2 | Arevon Energy, Inc. | Hanford, CA | California Independent System Operator (CISO) | 5.2 GWh | Jul 2014 | Dec 2025 | Solar |
| Beacon Solar Plant Site 5 | Sune Beacon Site 5, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 81.9 GWh | Nov 2017 | Aug 2026 | Solar |
| Beacon Solar Plant Site 2 | Sune Beacon Site 2, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 102.4 GWh | Nov 2017 | Aug 2026 | Solar |
| Hecate Energy Beacon Solar 1 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 121.8 GWh | Mar 2017 | Aug 2026 | Solar |
| Sutter Greenworks LLC | AES Distributed Energy | Calverton, NY | New York Independent System Operator (NYIS) | 8.3 GWh | Sep 2015 | Dec 2025 | Solar |
| Hecate Energy Beacon Solar 4 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 112.4 GWh | Nov 2016 | Aug 2026 | Solar |
| North Run | NJR Clean Energy Ventures Corporation | Wrightstown, NJ | PJM Interconnection, LLC (PJM) | 7.3 GWh | Dec 2014 | Dec 2025 | Solar |
| Rock Solid | NJR Clean Energy Ventures Corporation | Howell, NJ | PJM Interconnection, LLC (PJM) | 11.9 GWh | Oct 2014 | Dec 2025 | Solar |
| Pumpjack Solar I | Deriva Energy | McKittrick, CA | California Independent System Operator (CISO) | 50.6 GWh | Dec 2014 | Dec 2025 | Solar |
| Sacramento (SMUD) | Terraform Arcadia | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Jul 2014 | Dec 2025 | Solar |
| MCCo Solar Generating Facility | The Medical Center Company | Cleveland, OH | PJM Interconnection, LLC (PJM) | 1.1 GWh | Oct 2014 | Dec 2025 | Solar |
| Marlboro Mushrooms Solar Field | Marlboro Mushroom | West Grove, PA | PJM Interconnection, LLC (PJM) | 1.3 GWh | Oct 2011 | Dec 2025 | Solar |
| Faison Solar | USF Surry, LLC | Faison, NC | Duke Energy Progress East (CPLE) | 1.7 GWh | Jun 2015 | Dec 2025 | Solar |
| Catalina Solar 2, LLC | Onward Energy | Rosamond, CA | California Independent System Operator (CISO) | 55.4 GWh | Jul 2015 | Dec 2025 | Solar |
| Wildwood Solar II | Deriva Energy | Wasco, CA | California Independent System Operator (CISO) | 38.7 GWh | Dec 2016 | Dec 2025 | Solar |
| Tiburon Holdings | Heelstone Energy Holdings, LLC | Advance, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Nov 2016 | Dec 2025 | Solar |
| Porterville 6 and 7 | Arevon Energy, Inc. | Porterville, CA | California Independent System Operator (CISO) | 4.2 GWh | Jun 2014 | Dec 2025 | Solar |
| Lone Valley Solar Park II LLC | Lone Valley Solar Park II LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 53.1 GWh | Nov 2014 | Dec 2025 | Solar |
| Eagle Springs Solar LLC | Eagle Springs Solar LLC | Silt, CO | Public Service Company of Colorado (PSCO) | 1.5 GWh | Jul 2013 | Dec 2025 | Solar |
| Brockelman | Integrys MA Solar, LLC | Lancaster, MA | ISO New England (ISNE) | 4.7 GWh | Oct 2013 | Dec 2025 | Solar |
| Beverly | Integrys MA Solar, LLC | Beverly, MA | ISO New England (ISNE) | 3.3 GWh | Apr 2014 | Dec 2025 | Solar |
Summary of Power Plants By State
Figures are based on August 2026 generation numbers.| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 80 | 13,897.78 GWh |
| Alaska | # 48 | 146 | 672.99 GWh |
| Arizona | # 10 | 203 | 13,589.64 GWh |
| Arkansas | # 23 | 122 | 7,027.75 GWh |
| California | # 3 | 1,840 | 24,164.86 GWh |
| Colorado | # 30 | 321 | 5,322.30 GWh |
| Connecticut | # 34 | 180 | 4,400.98 GWh |
| Delaware | # 49 | 35 | 555.40 GWh |
| District of Columbia | # 51 | 19 | 21.71 GWh |
| Florida | # 2 | 345 | 28,185.93 GWh |
| Georgia | # 6 | 261 | 15,282.60 GWh |
| Hawaii | # 47 | 73 | 863.62 GWh |
| Idaho | # 43 | 152 | 1,754.56 GWh |
| Illinois | # 5 | 556 | 18,683.36 GWh |
| Indiana | # 17 | 226 | 9,970.06 GWh |
| Iowa | # 27 | 301 | 5,759.64 GWh |
| Kansas | # 26 | 191 | 6,368.18 GWh |
| Kentucky | # 21 | 63 | 7,221.26 GWh |
| Louisiana | # 14 | 93 | 10,670.45 GWh |
| Maine | # 45 | 250 | 1,285.31 GWh |
| Maryland | # 37 | 236 | 3,745.22 GWh |
| Massachusetts | # 41 | 679 | 1,958.59 GWh |
| Michigan | # 12 | 288 | 12,064.19 GWh |
| Minnesota | # 32 | 794 | 5,047.38 GWh |
| Mississippi | # 19 | 62 | 8,358.70 GWh |
| Missouri | # 22 | 134 | 7,125.71 GWh |
| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 2,266.60 GWh |
| Nebraska | # 39 | 132 | 3,448.00 GWh |
| Nevada | # 29 | 117 | 5,523.31 GWh |
| New Hampshire | # 42 | 60 | 1,901.10 GWh |
| New Jersey | # 25 | 409 | 6,440.88 GWh |
| New Mexico | # 33 | 166 | 4,571.47 GWh |
| New York | # 11 | 1,087 | 13,130.21 GWh |
| North Carolina | # 8 | 921 | 14,263.55 GWh |
| North Dakota | # 38 | 62 | 3,579.89 GWh |
| Ohio | # 7 | 216 | 14,448.49 GWh |
| Oklahoma | # 13 | 153 | 10,965.38 GWh |
| Oregon | # 31 | 292 | 5,257.14 GWh |
| Pennsylvania | # 4 | 270 | 23,772.83 GWh |
| Rhode Island | # 46 | 108 | 924.31 GWh |
| South Carolina | # 16 | 214 | 9,989.71 GWh |
| South Dakota | # 44 | 53 | 1,486.65 GWh |
| Tennessee | # 18 | 101 | 8,430.26 GWh |
| Texas | # 1 | 1,069 | 65,726.98 GWh |
| Utah | # 36 | 131 | 4,074.82 GWh |
| Vermont | # 50 | 118 | 175.56 GWh |
| Virginia | # 15 | 255 | 10,241.54 GWh |
| Washington | # 20 | 137 | 8,189.60 GWh |
| West Virginia | # 28 | 41 | 5,593.74 GWh |
| Wisconsin | # 24 | 272 | 6,683.19 GWh |
| Wyoming | # 35 | 71 | 4,322.19 GWh |