Lockheed Martin Solar System
3655 Tampa Road, Oldsmar, FL 34677Plant Summary Information
Lockheed Martin Solar System is ranked #186 out of 203 solar farms in Florida in terms of total annual net electricity generation.
Lockheed Martin Solar System generated 738.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Lockheed Martin Solar System |
---|---|
Utility Name | Lockheed Martin Solar System |
Location | Pinellas County, FL |
Initial Operation Date | September 2015 |
Last Update | Dec 2024 |
Annual Generation | 2.9 GWh |
Annual Consumption | 10.6 k MMBtu |
Ranked #9,460 out of 12,312 Power Plants Nationwide | |
Ranked #4,372 out of 6,191 Solar Power Plants Nationwide | |
Ranked #287 out of 308 Florida Power Plants | |
Ranked #186 out of 203 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Lockheed Martin Solar System
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lockheed Martin Solar System.
Monthly Net Generation for Lockheed Martin Solar System
Lockheed Martin Solar System Details
Summary Information | |
---|---|
Plant Name | Lockheed Martin Solar System (59867) |
Plant Address | 3655 Tampa Road, Oldsmar, FL 34677 |
Utility | Lockheed Martin Solar System (59648) |
Latitude, Longitude | 28.0479, -82.6853 |
Generation Dates on File | Jan 2016 to Dec 2024 |
Initial Operation Date | September 2015 |
Annual Generation | 2.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Progress Energy Florida (FPC) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Florida, Inc (6455) FL |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator LMSOL Details Operating September 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.9 MW |
Summer Capacity | 1.9 MW |
Winter Capacity | 1.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2015 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 5 |
DC Net Capacity | 2.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Lockheed Martin Solar System Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4362 | Deer Park | Deer Park, NY | 2.9 GWh |
#4363 | Cornerstone Power Holmdel LLC | Holmdel, NJ | 2.9 GWh |
#4364 | Watertown Solar One, LLC | Watertown, CT | 2.9 GWh |
#4365 | Musgrave West Solar Farm | Aurora, NY | 2.9 GWh |
#4366 | Target Woodland Solar Project | Woodland, CA | 2.9 GWh |
#4367 | Morgan Solar 1b CSG | Meredosia, IL | 2.9 GWh |
#4368 | Vacaville Hospital | Vacaville, CA | 2.9 GWh |
#4369 | Cascades | Piscataway Township, NJ | 2.9 GWh |
#4370 | NLRED 5MW | North Little Rock, AR | 2.9 GWh |
#4371 | Panda Solar NC 4, LLC | Clarkton, NC | 2.9 GWh |
#4373 | Fairview Farms Solar | Whately, MA | 2.9 GWh |
#4374 | Arba Solar, LLC | Snow Hill, NC | 2.9 GWh |
#4375 | Harmony Road Solar | Huntley, IL | 2.9 GWh |
#4376 | Weston Landfill Solar | Weston, MA | 2.9 GWh |
#4377 | Spruce - WCMD - Rubble I | Williamsport, MD | 2.9 GWh |
#4378 | Costanza Solar | Westerlo, NY | 2.9 GWh |
#4379 | Mattas Farms | Amsterdam, NY | 2.9 GWh |
#4380 | Muscogee Public Works | Columbus, GA | 2.9 GWh |
#4381 | RMQ 1 and 2 | Rocky Mount, NC | 2.9 GWh |
#4382 | Dickinson Solar (CT) | Hampton, CT | 2.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lockheed Martin Solar System.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Anclote | Holiday, FL | 1.8 TWh | 11.3 mi |
Bayboro | St. Petersburg, FL | 3.8 GWh | 20.3 mi |
Big Bend | Apollo Beach, FL | 7.0 TWh | 24.5 mi |
Big Bend Agrivoltaics | Apollo Beach, FL | 749.0 MWh | 25.2 mi |
Big Bend Floating Solar I | Gibsonton, FL | 1.3 GWh | 25.2 mi |
Big Bend II Solar | Apollo Beach, FL | 77.5 GWh | 25.7 mi |
Dover Solar and Battery Storage | Dover, FL | 44.9 GWh | 30.2 mi |
H L Culbreath Bayside Power Station | Tampa, FL | 5.2 TWh | 18.7 mi |
Hillsborough County Resource Recovery | Tampa, FL | 162.9 GWh | 22 mi |
IKEA Tampa 042 | Tampa, FL | 1.4 GWh | 16.7 mi |
John Hopkins Middle School Microgrid | St Petersburg, FL | 2.1 GWh | 19.4 mi |
Little Manatee River Solar | Ruskin, FL | 111.3 GWh | 29.8 mi |
McKay Bay Facility | Tampa, FL | 111.9 GWh | 17.5 mi |
Mosaic Co Tampa Facility | Riverview, FL | 100.8 GWh | 22.2 mi |
P L Bartow | St. Petersburg, FL | 6.2 TWh | 14 mi |
Pasco Cnty Solid Waste Resource Recovery | Spring Hill, FL | 182.3 GWh | 23.4 mi |
Pinellas County Resource Recovery | St. Petersburg, FL | 371.8 GWh | 12.1 mi |
Riverside Solar | Ruskin, FL | 100.1 GWh | 28.3 mi |
Shady Hills Generating Station | Shady Hills, FL | 582.9 GWh | 23.3 mi |
TIA Solar | Tampa, FL | 2.7 GWh | 10.9 mi |