North Star Solar Project
intersection of 367th St and K, North Branch, MN 55056Plant Summary Information
North Star Solar Project is ranked #46 out of 759 power plants in Minnesota in terms of total annual net electricity generation.
North Star Solar Project generated 61.3 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | North Star Solar Project |
|---|---|
| Utility Name | North Star Solar PV LLC |
| Location | Chisago County, MN |
| Initial Operation Date | December 2016 |
| Last Update | Sep 2025 |
| Annual Generation | 181.0 GWh |
| Annual Consumption | 688.9 k MMBtu |
| Ranked #2,589 out of 12,539 Power Plants Nationwide | |
| Ranked #450 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #46 out of 759 Minnesota Power Plants | |
| Ranked #2 out of 505 Minnesota Solar Power Plants | |
| Fuel Types | Solar |
Map of North Star Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for North Star Solar Project.
Monthly Net Generation for North Star Solar Project
North Star Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | North Star Solar Project (59852) |
| Plant Address | intersection of 367th St and K, North Branch, MN 55056 |
| Utility | North Star Solar PV LLC (59634) |
| Latitude, Longitude | 45.47, -92.91 |
| Generation Dates on File | Dec 2016 to Sep 2025 |
| Initial Operation Date | December 2016 |
| Annual Generation | 181.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 16-121-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Northern States Power Co - Minnesota (13781) MN |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator NSSP1 Details Operating December 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 100 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2016 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 138 MW |
| Crystalline Silicon | Yes |
| Other Materials | No |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
North Star Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #440 | Desert Harvest II LLC | Desert Center, CA | 181.4 GWh |
| #441 | Hildreth Solar Power Plant | O'Brien, FL | 184.1 GWh |
| #442 | Sadler Solar | Emporia, VA | 184.0 GWh |
| #443 | Grand View Solar Two | Grand View, ID | 183.5 GWh |
| #444 | Playa Solar 1, LLC | North Las Vegas, NV | 182.9 GWh |
| #445 | FPL Shirer Branch Solar Energy Center | Clarksville, FL | 182.6 GWh |
| #446 | Martin County Solar Project, LLC | Pilgrim, KY | 182.2 GWh |
| #447 | Gilchrist County Solar | Newberry, FL | 181.8 GWh |
| #448 | Tupelo Solar | San Mateo, FL | 181.8 GWh |
| #449 | Kiowa County Solar Project, LLC | Snyder, OK | 181.2 GWh |
| #451 | Beautyberry | Clewiston, FL | 180.9 GWh |
| #452 | Lancaster Solar GA | Arlington, GA | 180.6 GWh |
| #453 | Pioneer Solar (CO), LLC | Bennett, CO | 180.5 GWh |
| #454 | Hamilton Solar Power Plant | Jasper, FL | 180.2 GWh |
| #455 | Falmouth Renewable Energy Center | Live Oak, FL | 179.7 GWh |
| #456 | Calhoun County Solar Project | Sheridan Township, MI | 179.2 GWh |
| #457 | Spring Grove I | Spring Grove, VA | 178.8 GWh |
| #458 | Decatur Parkway Solar Project, LLC | Bainbridge, GA | 178.7 GWh |
| #459 | Southampton Solar, LLC | Newsoms, VA | 178.1 GWh |
| #460 | RE Astoria | Rosamond, CA | 176.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding North Star Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Carlson Community (CSG) | Lindstrom, MN | 1.3 GWh | 4.7 mi |
| Chisago Solar | North Branch, MN | 11.8 GWh | 1.3 mi |
| Coral Bells Solar, LLC | North Branch, MN | 2.1 GWh | 0.9 mi |
| Cornillie | North Branch, MN | 1.7 GWh | 1 mi |
| Cornillie 2 Community (CSG) | North Branch, MN | 1.7 GWh | 1 mi |
| Cornillie Solar CSG | North Branch, MN | 1.7 GWh | 0.9 mi |
| Flodquist Community Solar LLC CSG | Lindstrom, MN | 2.0 GWh | 2.9 mi |
| Johnson 1 Community Solar | Lindstrom, MN | 1.5 GWh | 4.7 mi |
| Johnson CSG 2 | Lindstrom, MN | 2.0 GWh | 3.2 mi |
| Johnson II Community Solar | North Branch, MN | 1.6 GWh | 3.1 mi |
| North Branch (MN) | North Branch, MN | 300.0 MWh | 4.4 mi |
| Novel Caroline Solar, LLC CSG | North Branch, MN | 2.1 GWh | 0.6 mi |
| Sunrise Community Solar | North Branch, MN | 7.8 GWh | 1 mi |
| USS Dubhe Solar CSG | North Branch, MN | 2.0 GWh | 1.6 mi |
| USS Good Solar CSG | Stacy, MN | 1.9 GWh | 2.8 mi |
| USS Kost Trail Solar CSG | North Branch, MN | 2.0 GWh | 1.8 mi |
| USS Nillie Corn Solar CSG | North Branch, MN | 2.0 GWh | 1.1 mi |
| USS Norelius Solar CSG | North Branch, MN | 2.0 GWh | 1.2 mi |
| USS Rockpoint Solar CSG | Stacy, MN | 2.0 GWh | 2.2 mi |
| USS Solar Dawn CSG | North Branch, MN | 2.0 GWh | 3.6 mi |