Western Branch High School
1968 Bruin Place, Chesapeake, VA 23321Plant Summary Information
Western Branch High School is ranked #113 out of 117 solar farms in Virginia in terms of total annual net electricity generation.
Western Branch High School generated 155.0 MWh during the 3-month period between January 2025 to April 2025.
Plant Name | Western Branch High School |
---|---|
Utility Name | Virginia Electric & Power Co |
Location | Chesapeake city, VA |
Initial Operation Date | April 2016 |
Last Update | Apr 2025 |
Annual Generation | 921.0 MWh |
Annual Consumption | 3.5 k MMBtu |
Ranked #11,276 out of 12,312 Power Plants Nationwide | |
Ranked #5,951 out of 6,191 Solar Power Plants Nationwide | |
Ranked #198 out of 228 Virginia Power Plants | |
Ranked #113 out of 117 Virginia Solar Power Plants | |
Fuel Types | Solar |
Map of Western Branch High School
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Western Branch High School.
Monthly Net Generation for Western Branch High School
Western Branch High School Details
Summary Information | |
---|---|
Plant Name | Western Branch High School (59904) |
Plant Address | 1968 Bruin Place, Chesapeake, VA 23321 |
Utility | Virginia Electric & Power Co (19876) |
Latitude, Longitude | 36.84811, -76.40714 |
Generation Dates on File | Apr 2016 to Apr 2025 |
Initial Operation Date | April 2016 |
Annual Generation | 921.0 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator 1 Details Operating April 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2016 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Lenses Mirrors | No |
---|---|
Fixed Tilt | Yes |
Azimuth Angle | 232 |
Tilt Angle | 12 |
DC Net Capacity | 1.03 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Western Branch High School Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5941 | Kohls San Bernardino Solar Facility | San Bernardino, CA | 944.0 MWh |
#5942 | Severson Garden | Waseca, MN | 943.0 MWh |
#5943 | Alexander Road Solar | Batavia, NY | 943.0 MWh |
#5944 | UMASS | Amherst, MA | 941.0 MWh |
#5945 | Northline Solar CSG | Schaghticoke, NY | 936.0 MWh |
#5946 | Ozarks Natural Energy Community Solar | Springdale, AR | 935.0 MWh |
#5947 | IKEA Memphis 508 | Cordova, TN | 934.0 MWh |
#5948 | Dakota Solar 1, LLC | Dakota, IL | 933.0 MWh |
#5949 | IKEA Tejon 345 | Lebec, CA | 929.0 MWh |
#5950 | McKee City Solar Phase 2 | Egg Harbor Township, NJ | 922.0 MWh |
#5952 | North Smithfield Solar Power 1 | North Smithfield, RI | 919.0 MWh |
#5953 | Pivot Energy Minnesota Solar 1 | Clinton Falls, MN | 919.0 MWh |
#5954 | Jefferson Solar Park | Jefferson, WI | 918.0 MWh |
#5955 | TWC | Tulare, CA | 918.0 MWh |
#5956 | Castor Solar | Dustin Acres, CA | 917.0 MWh |
#5957 | Wheeler Ridge 2 | Arvin, CA | 913.0 MWh |
#5958 | Walgreens Woodland Distribution Center | Woodland, CA | 908.0 MWh |
#5959 | Stafford Hill Solar Hybrid | Rutland, VT | 908.0 MWh |
#5960 | USS Water Fowl Solar LLC CSG | Silver Lake, MN | 908.0 MWh |
#5961 | Lanesville Solar RES | Lanesville, IN | 907.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Western Branch High School.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bedford Solar | Chesapeake, VA | 123.1 GWh | 16.9 mi |
Caden Energix Hickory LLC | Chesapeake, VA | 58.7 GWh | 19.5 mi |
Cavalier Solar | Smithfield, VA | 312.2 GWh | 21.6 mi |
Cavalier Solar A2 | Smithfield, VA | 72.1 GWh | 21.6 mi |
Chesapeake | Chesapeake, VA | 186.0 MWh | 7.9 mi |
Chesapeake Solar Project | Chesapeake, VA | 251.1 GWh | 12.8 mi |
Elizabeth River Power Station | Chesapeake, VA | 109.2 GWh | 7.4 mi |
Grassfield Solar | Chesapeake, VA | 45.2 GWh | 14 mi |
Gravel Neck | Surry, VA | 115.4 GWh | 26.5 mi |
IKEA Norfolk Rooftop PV System | Norfolk, VA | 1.4 GWh | 11.6 mi |
Oceana Solar | Virginia Beach, VA | 28.5 GWh | 20.1 mi |
Pleasant Hill Solar | Suffolk, VA | 40.2 GWh | 14.4 mi |
Solidago Solar | Windsor, VA | 38.3 GWh | 17 mi |
Stratford Solar Center, LLC | Suffolk, VA | 32.1 GWh | 15.5 mi |
Suffolk CSG, LLC | Suffolk, VA | 5.1 GWh | 22.7 mi |
TWE Myrtle Solar Farm, LLC | Suffolk, VA | 24.7 GWh | 15.1 mi |
Virginia Beach | Virginia Beach, VA | 3.2 GWh | 12.1 mi |
Waste Management Bethel LFGTE | Hampton, VA | 36.5 GWh | 15.9 mi |
Wheelabrator Portsmouth | Portsmouth, VA | 35.6 GWh | 6.4 mi |
Woodland Solar Farm | Smithfield, VA | 32.2 GWh | 11.6 mi |