Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Smithfield Farmland Corp Bladen | Smithfield Fresh Meats Corp. | Tar Heel, NC | Duke Energy Progress East (CPLE) | 83.0 MWh | Sep 1993 | Jan 2026 | Distillate Fuel Oil |
| Smithfield Packaged Meats Corp (Kinston) | Smithfield Packaged Meats Corp (Kinston) | Kinston, NC | Duke Energy Progress East (CPLE) | 1.2 GWh | Oct 2013 | Dec 2024 | Distillate Fuel Oil |
| Smithfield Packaged Meats Corp (Wilson) | Smithfield Packaged Meats Corp (Wilson) | Wilson, NC | Duke Energy Progress East (CPLE) | 298.0 MWh | Jan 2002 | Dec 2024 | Distillate Fuel Oil |
| Smithfield Solar Farm, LLC | Smithfield Solar Farm | Smithfield, RI | ISO New England (ISNE) | 4.4 GWh | Jun 2020 | Dec 2024 | Solar |
| Smoky Hills Wind Project Phase I | Smoky Hills Wind Farm I LLC | Lincoln, KS | Southwest Power Pool (SWPP) | 250.8 GWh | Dec 2007 | Dec 2024 | Wind |
| Smoky Hills Wind Project Phase II | Smoky Hills Wind Project II LLC | Lincoln, KS | Southwest Power Pool (SWPP) | 414.3 GWh | Oct 2008 | Dec 2024 | Wind |
| Snider Industries | Snider Industries Inc | Marshall, TX | Southwest Power Pool (SWPP) | 12.5 GWh | Jul 1983 | Dec 2024 | Wood/Wood Waste Solids |
| Ponderosa Bailey Creek | Snow Mountain Hydro LLC | Manton, CA | California Independent System Operator (CISO) | 2.9 GWh | Feb 1990 | Dec 2024 | Water |
| Lost Creek I | Snow Mountain Hydro LLC | Burney, CA | California Independent System Operator (CISO) | 5.1 GWh | Nov 1989 | Dec 2024 | Water |
| Cove Hydroelectric | Snow Mountain Hydro LLC | Burney, CA | California Independent System Operator (CISO) | 18.4 GWh | Jan 1990 | Dec 2024 | Water |
| Burney Creek | Snow Mountain Hydro LLC | Burney, CA | California Independent System Operator (CISO) | 8.9 GWh | Feb 1990 | Dec 2024 | Water |
| Snowbird Power Plant | Snowbird Corporation | Snowbird, UT | PacifiCorp East (PACE) | 14.7 GWh | Nov 1986 | Dec 2024 | Natural Gas |
| Snowden River CSG | Snowden River Parkway, LLC | Columbia, MD | PJM Interconnection, LLC (PJM) | 3.2 GWh | May 2021 | Dec 2024 | Solar |
| Soboba Community Solar Project | Soboba Band of Luiseno Indians | San Jacinto, CA | California Independent System Operator (CISO) | 3.4 GWh | Jul 2016 | Dec 2024 | Solar |
| SoCore Clovis 1 | SoCore Clovis 1 LLC | Clovis, NM | Southwest Power Pool (SWPP) | 4.3 GWh | Mar 2021 | Dec 2024 | Solar |
| Vermillion River_MN_GRE DEA-GM | SoCore Energy LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Nov 2019 | Dec 2024 | Solar |
| Athens MN CONX | SoCore Energy LLC | Athens, MN | Midcontinent Independent System Operator, Inc. (MISO) | 10.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Hampton MN GRE | SoCore Energy LLC | Hampton Township, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Sep 2018 | Dec 2024 | Solar |
| Anoka County MN CONX | SoCore Energy LLC | Ramsey, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.6 GWh | Sep 2018 | Dec 2024 | Solar |
| Kearney NPPD Solar Project | SoCore Energy LLC | Kearney, NE | Southwest Power Pool (SWPP) | 8.6 GWh | Nov 2017 | Dec 2024 | Solar |
| DPC Madison | SoCore Energy LLC | Ridgeway, IA | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 GWh | Jan 2019 | Dec 2024 | Solar |
| Government Plaza Solar | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 1.7 GWh | Oct 2020 | Dec 2024 | Solar |
| NJ Airport Solar Project B | SoCore Energy LLC | Newark, NJ | PJM Interconnection, LLC (PJM) | 1.4 GWh | May 2023 | Dec 2024 | Solar |
| Bunker Hill Solar | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Oct 2021 | Dec 2024 | Solar |
| ABIA Parking Structure | SoCore Energy LLC | Austin, TX | Southwest Power Pool (SWPP) | 3.2 GWh | Mar 2021 | Dec 2024 | Solar |
| Abel Solar | SoCore Energy LLC | Morrison, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 GWh | Nov 2021 | Dec 2024 | Solar |
| NJ Airport Solar Project C | SoCore Energy LLC | Newark, NJ | PJM Interconnection, LLC (PJM) | 1.5 GWh | May 2023 | Dec 2024 | Solar |
| NJ Airport Solar Project D | SoCore Energy LLC | Newark, NJ | PJM Interconnection, LLC (PJM) | 1.4 GWh | May 2023 | Dec 2024 | Solar |
| Yorktown 2 Solar | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Dec 2023 | Dec 2024 | Solar |
| Adams Grove Solar | SoCore Energy LLC | Adams, MA | ISO New England (ISNE) | 6.2 GWh | Aug 2022 | Dec 2024 | Solar |
| Skyline Solar | SoCore Energy LLC | Lanesborough, MA | ISO New England (ISNE) | 7.2 GWh | Aug 2022 | Dec 2024 | Solar |
| GRE Cambridge Solar | SoCore Energy LLC | Cambridge, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Nov 2019 | Dec 2024 | Solar |
| Jericho Gravel Solar Farm | SoCore Energy LLC | Jerico, VT | ISO New England (ISNE) | 2.3 GWh | Dec 2020 | Dec 2024 | Solar |
| TJX Las Vegas | SoCore Energy LLC | North Las Vegas, NV | Nevada Power Company (NEVP) | 2.4 GWh | Jan 2019 | Dec 2024 | Solar |
| TJX Phoenix | SoCore Energy LLC | Phoenix, AZ | Salt River Project Agricultural Improvement and Power District (SRP) | 5.0 GWh | Dec 2017 | Dec 2024 | Solar |
| TJX Tucson | SoCore Energy LLC | Tucson, AZ | Tucson Electric Power (TEPC) | 2.2 GWh | Jan 2018 | Dec 2024 | Solar |
| North Juvenile Detention Center Solar | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 2.0 GWh | Oct 2019 | Dec 2024 | Solar |
| Tulare Akers Professional Center | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2019 | Dec 2024 | Solar |
| Bob Wiley Detention Center | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 2.8 GWh | Aug 2020 | Dec 2024 | Solar |
| Fond du Lac Community Solar | SoCore Energy LLC | Fond Du Lac, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2021 | Dec 2024 | Solar |
| Civic Center East | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2020 | Dec 2024 | Solar |
| Marston Mills Solar | SoCore Energy LLC | Marstons Mills, MA | ISO New England (ISNE) | 5.7 GWh | Nov 2021 | Dec 2024 | Solar |
| Jericho Landfill Solar Farm | SoCore Energy LLC | Jerico, VT | ISO New England (ISNE) | 1.9 GWh | Dec 2020 | Dec 2024 | Solar |
| FedEx Hagerstown | SoCore Energy LLC | Hagerstown, MD | PJM Interconnection, LLC (PJM) | 2.7 GWh | Mar 2015 | Dec 2024 | Solar |
| Round Grove 2 | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 GWh | Oct 2021 | Dec 2024 | Solar |
| DPC York | SoCore Energy LLC | Thomson, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Jul 2019 | Dec 2024 | Solar |
| South County Detention Center Solar | SoCore Energy LLC | Porterville, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2019 | Dec 2024 | Solar |
| Yorktown 1 Solar | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2023 | Dec 2024 | Solar |
| Round Grove 1 | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Oct 2021 | Dec 2024 | Solar |
| Partridge Solar | SoCore Energy LLC | Lanesborough, MA | ISO New England (ISNE) | 8.0 GWh | Aug 2022 | Dec 2024 | Solar |
| Saddleback Solar | SoCore Energy LLC | Lanesborough, MA | ISO New England (ISNE) | 3.5 GWh | Aug 2022 | Dec 2024 | Solar |
| NJ Airport Solar Project A | SoCore Energy LLC | Newark, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | May 2023 | Dec 2024 | Solar |
| Michael Solar | SoCore Energy LLC | Freeport, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.1 GWh | Nov 2017 | Dec 2024 | Solar |
| Nesvold Watertown Solar | SoCore Energy LLC | Watertown, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.8 GWh | Dec 2017 | Dec 2024 | Solar |
| Warren DPC Solar | SoCore Energy LLC | Roberts, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 GWh | Apr 2017 | Feb 2026 | Solar |
| Sand Lake DPC Solar | SoCore Energy LLC | Centuria, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Oct 2017 | Dec 2024 | Solar |
| Carrizozo Solar | SoCore Energy LLC | Carrizozo, NM | Public Service Company of New Mexico (PNM) | 6.9 GWh | Feb 2018 | Dec 2024 | Solar |
| New Auburn DPC Solar | SoCore Energy LLC | New Auburn, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 GWh | Dec 2017 | Feb 2026 | Solar |
| Westar Cities Solar | SoCore Energy LLC | Hutchinson, KS | Southwest Power Pool (SWPP) | 2.2 GWh | Jun 2017 | Dec 2024 | Solar |
| Strawberry Point DPC Solar | SoCore Energy LLC | Strawberry Point, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Oct 2017 | Dec 2024 | Solar |
| VEC Magee Hill Solar | SoCore Energy LLC | Hinesburgh, VT | ISO New England (ISNE) | 1.7 GWh | Oct 2017 | Dec 2024 | Solar |
| GRE Marshan Solar | SoCore Energy LLC | Hastings, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Oct 2017 | Dec 2024 | Solar |
| Whistling Winds DPC Solar | SoCore Energy LLC | New Lisbon, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | May 2017 | Feb 2026 | Solar |
| Medford DPC Solar | SoCore Energy LLC | Medford, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.7 GWh | Jan 2017 | Feb 2026 | Solar |
| Mt. Hope DPC Solar | SoCore Energy LLC | Mt. Hope, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2016 | Feb 2026 | Solar |
| Downsville DPC Solar | SoCore Energy LLC | Menomonee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jan 2017 | Feb 2026 | Solar |
| Liberty Pole DPC Solar | SoCore Energy LLC | Viroqua, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Apr 2017 | Feb 2026 | Solar |
| Conrath DPC Solar | SoCore Energy LLC | Conrath, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | May 2017 | Dec 2024 | Solar |
| Lafayette DPC Solar | SoCore Energy LLC | Chippewa Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | May 2017 | Dec 2024 | Solar |
| Sauk DPC Solar | SoCore Energy LLC | Wonewoc, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Dec 2016 | Dec 2024 | Solar |
| VEC Alburgh Array | SoCore Energy LLC | Alburgh, VT | ISO New England (ISNE) | 1.4 GWh | Nov 2016 | Dec 2024 | Solar |
| Taylors Falls CSG | SoCore Energy LLC | Taylor Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Dec 2017 | Dec 2024 | Solar |
| T0588 Phoenix - AZ | SoCore Energy LLC | Phoenix, AZ | Salt River Project Agricultural Improvement and Power District (SRP) | 2.1 GWh | Apr 2017 | Dec 2024 | Solar |
| Lahr 1, LLC | SoCore Energy LLC | Wakefield Township, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.6 GWh | Dec 2017 | Dec 2024 | Solar |
| Bandera Electric Coop PV | SoCore Energy LLC | Leakey, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.9 GWh | Jan 2017 | Dec 2024 | Solar |
| Gopher CSG | SoCore Energy LLC | Taylor Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 GWh | Dec 2017 | Dec 2024 | Solar |
| Richmond CSG | SoCore Energy LLC | Richmond, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.9 GWh | Nov 2017 | Dec 2024 | Solar |
| ME Augusta 13 York Farm Rd Solar | SOL ME Augusta 13 York Farm, LLC | Augusta, ME | ISO New England (ISNE) | 1.3 GWh | Dec 2023 | Dec 2024 | Solar |
| Sol Orchard El Centro PV | Sol Orchard Imperial 1, LLC | El Centro, CA | Imperial Irrigation District (IID) | 47.1 GWh | Sep 2013 | Dec 2024 | Solar |
| Buttercup Solar, LLC | Sol Systems | Rose Hill, NC | Duke Energy Progress East (CPLE) | 10.5 GWh | Oct 2020 | Dec 2024 | Solar |
| Alexis Solar, LLC | Sol Systems | Encino, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 12.6 GWh | Nov 2019 | Dec 2024 | Solar |
| ESA Boston Solar, LLC | Sol Systems | Roxboro, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Nov 2020 | Dec 2024 | Solar |
| Trojan Solar, LLC | Sol Systems | Delco, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | Nov 2020 | Dec 2024 | Solar |
| Zuma Solar, LLC | Sol Systems | Providence, NC | Duke Energy Carolinas (DUK) | 6.5 GWh | Nov 2020 | Dec 2024 | Solar |
| Kathleen Solar | Sol Systems | Fuquay Varina, NC | Duke Energy Carolinas (DUK) | 9.9 GWh | Oct 2018 | Dec 2024 | Solar |
| Grove Solar | Sol Systems | New Bern, NC | Duke Energy Carolinas (DUK) | 12.0 GWh | Nov 2019 | Dec 2024 | Solar |
| Shelter Solar | Sol Systems | Raeford, NC | Duke Energy Carolinas (DUK) | 9.6 GWh | Nov 2018 | Dec 2024 | Solar |
| Jester Solar | Sol Systems | Goldsboro, NC | Duke Energy Carolinas (DUK) | 9.3 GWh | Nov 2020 | Dec 2024 | Solar |
| Prairie Creek Solar | Sol Systems | Jacksonville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 58.1 GWh | Oct 2023 | Feb 2026 | Solar |
| Bay Branch Solar | Sol Systems | Chocowinity, NC | Duke Energy Progress East (CPLE) | 11.0 GWh | Nov 2018 | Dec 2024 | Solar |
| LA3 West Baton Rouge Solar Facility | Sol Systems | West Baton Rouge, LA | Midcontinent Independent System Operator, Inc. (MISO) | 113.0 GWh | Aug 2020 | Feb 2026 | Solar |
| Tilden Solar | Sol Systems | Randolph County, IL | 62.6 GWh | - | Feb 2026 | Solar | |
| Eldorado Solar II | Sol Systems | Saline County, IL | 71.3 GWh | - | Feb 2026 | Solar | |
| Eldorado Solar I | Sol Systems | Eldorado, IL | Midcontinent Independent System Operator, Inc. (MISO) | 319.9 GWh | - | Feb 2026 | Solar |
| Red Toad 4451 Buffalo Road, LLC | Sol Systems | Selma, NC | Duke Energy Progress East (CPLE) | 4.1 GWh | Oct 2018 | Dec 2024 | Solar |
| Nickelson Solar, LLC | Sol Systems | Wallace, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Red Toad 5840 Buffalo Road, LLC | Sol Systems | Selma, NC | Duke Energy Progress East (CPLE) | 4.3 GWh | Oct 2018 | Dec 2024 | Solar |
| Warren Solar Farm LLC | Sol Systems | Newton Grove, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Jun 2019 | Dec 2024 | Solar |
| Lampwick | Sol Systems | Hext, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 15.1 GWh | Oct 2019 | Dec 2024 | Solar |
| Sabattus Solar LLC | Sol Systems | Bailey, NC | Duke Energy Progress East (CPLE) | 10.1 GWh | Oct 2019 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 184 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,677 | 13,090.02 GWh |
| Colorado | # 31 | 294 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 290 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 268 | 9,944.77 GWh |
| Minnesota | # 28 | 763 | 4,707.75 GWh |
| Mississippi | # 23 | 56 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 124 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 949 | 10,653.43 GWh |
| North Carolina | # 7 | 903 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 141 | 6,415.64 GWh |
| Oregon | # 21 | 270 | 6,135.97 GWh |
| Pennsylvania | # 2 | 251 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 236 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 239 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |