El Algodon Alto Wind Farm, LLC
TBA, Mathis, TX 78368Plant Summary Information
El Algodon Alto Wind Farm, LLC is ranked #76 out of 221 wind farms in Texas in terms of total annual net electricity generation.
El Algodon Alto Wind Farm, LLC generated 203.9 GWh during the 3-month period between January 2025 to April 2025.
Plant Name | El Algodon Alto Wind Farm, LLC |
---|---|
Utility Name | El Algodon Alto Wind Farm, LLC |
Location | San Patricio County, TX |
Initial Operation Date | May 2022 |
Last Update | Apr 2025 |
Annual Generation | 639.5 GWh |
Annual Consumption | 2.4 M MMBtu |
Ranked #1,076 out of 12,299 Power Plants Nationwide | |
Ranked #245 out of 1,353 Wind Power Plants Nationwide | |
Ranked #198 out of 792 Texas Power Plants | |
Ranked #76 out of 221 Texas Wind Power Plants | |
Fuel Types | Wind |
Map of El Algodon Alto Wind Farm, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for El Algodon Alto Wind Farm, LLC.
Monthly Net Generation for El Algodon Alto Wind Farm, LLC
El Algodon Alto Wind Farm, LLC Details
Summary Information | |
---|---|
Plant Name | El Algodon Alto Wind Farm, LLC (64591) |
Plant Address | TBA, Mathis, TX 78368 |
Utility | El Algodon Alto Wind Farm, LLC (64209) |
Latitude, Longitude | 27.99271, -97.74398 |
Generation Dates on File | May 2022 to Apr 2025 |
Initial Operation Date | May 2022 |
Annual Generation | 639.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator EEA Details Operating May 2022
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 200.2 MW |
Summer Capacity | 200.2 MW |
Winter Capacity | 200.2 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2022 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 91 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 91 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V120-2.2 |
Design Wind Speed | 16.3 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 301.8 |
El Algodon Alto Wind Farm, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#235 | Brazos Wind Farm | Fluvanna, TX | 658.7 GWh |
#236 | Kelly Creek Wind Project | Cabery, IL | 655.0 GWh |
#237 | Foxtail Wind, LLC | Forbes, ND | 654.1 GWh |
#238 | Minonk Wind Farm | Minonk, IL | 651.1 GWh |
#239 | Horizon Hill Wind Project | Crescent, OK | 650.7 GWh |
#240 | TX Hereford Wind | Hereford, TX | 648.1 GWh |
#241 | Bloom Wind | Minneola, KS | 647.5 GWh |
#242 | Merricourt Wind Energy Center | Kulm, ND | 645.7 GWh |
#243 | FPL Energy Illinois Wind LLC Hybrid | Shabbona, IL | 642.0 GWh |
#244 | Sweetwater Wind 4 LLC | Roscoe, TX | 640.2 GWh |
#246 | Coyote Wind LLC | Snyder, TX | 636.9 GWh |
#247 | Patriot Wind Farm | Bishop, TX | 636.4 GWh |
#248 | Raymond Wind Farm, LLC | Lyford, TX | 635.7 GWh |
#249 | Brady Wind Energy Center | Dickinson, ND | 632.3 GWh |
#250 | Bison 4 Wind Energy Center | New Salem, ND | 624.2 GWh |
#251 | Headwaters Wind Farm LLC | Winchester, IN | 622.9 GWh |
#252 | Cedar Creek II | New Raymer, CO | 621.7 GWh |
#253 | Tatanka Ridge | Toronto, SD | 621.6 GWh |
#254 | Caney River Wind Project | Howard, KS | 618.7 GWh |
#255 | Cedar Springs II | Douglas, WY | 618.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding El Algodon Alto Wind Farm, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blackjack Creek Wind Farm | Skidmore, TX | 521.0 GWh | 20.1 mi |
Brightside | Beeville, TX | 82.9 GWh | 31.6 mi |
Chapman Ranch Wind I | Corpus Christi, TX | 518.0 GWh | 31.4 mi |
Corpus Christi | Corpus Christi, TX | 54.6 GWh | 15.5 mi |
Corpus Christi Energy Center | Corpus Christi, TX | 2.6 TWh | 22.9 mi |
Corpus Refinery | Corpus Christi, TX | 280.5 GWh | 17.2 mi |
Cranell Wind Farm LLC | TBD, TX | 583.7 GWh | 23.1 mi |
Gregory Power Plant | Gregory, TX | 642.9 GWh | 30.5 mi |
HEBCCBakery | Corpus Christi, TX | 802.0 MWh | 22.3 mi |
Ingleside Cogeneration | Houston, TX | 2.7 TWh | 31.5 mi |
Karankawa Wind LLC | Mathis, TX | 804.2 GWh | 13.1 mi |
Midway Wind, LLC | Taft, TX | 398.5 GWh | 27.2 mi |
Nueces Bay | Corpus Christi, TX | 1.6 TWh | 23.2 mi |
Papalote Creek I LLC | Taft, TX | 335.8 GWh | 17.8 mi |
Papalote Creek II LLC | Taft, TX | 463.3 GWh | 27.3 mi |
Patriot Wind Farm | Bishop, TX | 636.4 GWh | 29.2 mi |
Peacock Energy Project | Taft, TX | 92.5 GWh | 21.7 mi |
Ticona Polymers Inc | Bishop, TX | 264.7 GWh | 29.6 mi |
Valero Refinery Corpus Christi West | Corpus Christi, TX | 82.7 GWh | 20.1 mi |
WAL791 | Alice, TX | 292.0 MWh | 23.9 mi |