Stoneridge Solar, LLC
366 Private Road 4498, Thorndale, TX 76577Plant Summary Information
Stoneridge Solar, LLC is ranked #131 out of 219 solar farms in Texas in terms of total annual net electricity generation.
Stoneridge Solar, LLC generated 92.4 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Stoneridge Solar, LLC |
|---|---|
| Utility Name | RWE Clean Energy |
| Location | Milam County, TX |
| Initial Operation Date | Not Available |
| Last Update | Mar 2026 |
| Annual Generation | 133.2 GWh |
| Annual Consumption | 454.4 k MMBtu |
| Ranked #3,101 out of 12,332 Power Plants Nationwide | |
| Ranked #725 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #489 out of 814 Texas Power Plants | |
| Ranked #131 out of 219 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Stoneridge Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Stoneridge Solar, LLC.
Monthly Net Generation for Stoneridge Solar, LLC
Monthly Plant Fuel Consumption for Stoneridge Solar, LLC
Stoneridge Solar, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Stoneridge Solar, LLC (69027) |
| Plant Address | 366 Private Road 4498, Thorndale, TX 76577 |
| Utility | RWE Clean Energy (67192) |
| Latitude, Longitude | 30.56945, -97.11043 |
| Generation Dates on File | Nov 2025 to Mar 2026 |
| Initial Operation Date | Not Available |
| Annual Generation | 133.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | Yes |
Stoneridge Solar, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #715 | Moffett Solar Project | Ridgeland, SC | 134.4 GWh |
| #716 | Trent River Solar, LLC | Pollocksville, NC | 134.3 GWh |
| #717 | Titan Solar 1 (CA) | Borrego Springs, CA | 134.1 GWh |
| #718 | SR McKellar | Denmark, TN | 134.1 GWh |
| #719 | Citrus Solar Energy Center Hybrid | Arcadia, FL | 133.9 GWh |
| #720 | Norton Solar Farm | Bronte, TX | 134.0 GWh |
| #721 | Great Bay Solar 1 | Princess Anne, MD | 133.9 GWh |
| #722 | Route 66 Energy Center, LLC | San Fidel, NM | 133.7 GWh |
| #723 | Blue Springs | Marianna, FL | 133.4 GWh |
| #724 | NMRD Data Center III, LLC | Rio Ranchero, NM | 133.3 GWh |
| #726 | Blue Cypress Solar Energy Center | Vero Beach, FL | 133.1 GWh |
| #727 | Paddock Solar | Beloit, WI | 132.9 GWh |
| #728 | Camino Solar Hybrid | Rosamond, CA | 132.8 GWh |
| #729 | Rutherford Farm | Forest City, NC | 132.8 GWh |
| #730 | Wheatridge Hybrid | Morrow, OR | 654.8 GWh |
| #731 | Interstate Solar Energy Center | Ft. Pierce, FL | 132.4 GWh |
| #732 | North Star Solar | Mendota, CA | 132.4 GWh |
| #733 | First City Solar Energy Center | McDavid, FL | 131.5 GWh |
| #734 | Azalea Springs Solar Park | Lufkin, TX | 131.3 GWh |
| #735 | Jicarilla Solar 2 | Dulce, NM | 131.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Stoneridge Solar, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Austin Gas Recovery | Austin, TX | 32.2 GWh | 34.5 mi |
| Bastrop Energy Center | Cedar Creek, TX | 1.9 TWh | 39.3 mi |
| BT Jungmann | Buckholts, TX | 85.9 GWh | 23.3 mi |
| East Blackland Solar Project 1 | Manor, TX | 282.1 GWh | 23.3 mi |
| Five Wells Solar Center - Hybrid | Rogers, TX | 731.4 GWh | 30.9 mi |
| Gransolar Texas One, LLC | Thorndale, TX | 117.9 GWh | 3.4 mi |
| HEB00182 | Temple, TX | 217.0 MWh | 38 mi |
| HEB00591 | Round Rock, TX | 327.0 MWh | 32.8 mi |
| Lost Pines 1 Power Project | Bastrop, TX | 2.8 TWh | 30.7 mi |
| OCI Stillhouse Solar | Rogers, TX | 152.4 GWh | 27.7 mi |
| Orion I Solar Project | Burlington, TX | 450.5 GWh | 30.2 mi |
| Orion II Solar Project | Rosebud, TX | 559.8 GWh | 33.4 mi |
| Orion III Solar Project | Buckholts, TX | 553.9 GWh | 27 mi |
| OTHERTexasA&M | Bryan, TX | 1.3 GWh | 38.9 mi |
| Sand Hill | Austin, TX | 1.9 TWh | 38.9 mi |
| Sim Gideon | Bastrop, TX | 1.0 TWh | 30.8 mi |
| Temple Power Station | Temple, TX | 8.0 TWh | 35.8 mi |
| WAL5480 | Round Rock, TX | 259.0 MWh | 29.9 mi |
| Webberville Solar Project | Manor, TX | 56.3 GWh | 33 mi |
| Winchester Power Park | Winchester, TX | 51.5 GWh | 38.2 mi |