Iron Horse Battery Storage Hybrid
8410 H East Rita Road, Tucson, AZ 85747Plant Summary Information
Iron Horse Battery Storage Hybrid is ranked #91 out of 121 solar farms in Arizona in terms of total annual net electricity generation.
Iron Horse Battery Storage Hybrid generated 1.1 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Iron Horse Battery Storage Hybrid |
|---|---|
| Utility Name | RWE Clean Energy |
| Location | Pima County, AZ |
| Initial Operation Date | April 2017 |
| Last Update | Dec 2025 |
| Annual Generation | 4.2 GWh |
| Annual Consumption | 18.0 k MMBtu |
| Ranked #8,725 out of 13,081 Power Plants Nationwide | |
| Ranked #3,533 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #145 out of 176 Arizona Power Plants | |
| Ranked #91 out of 121 Arizona Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Iron Horse Battery Storage, LLC (2016 to 2021) RWE Renewables Americas, LLC (2022 to 2023) Big Sky Wind, LLC (2024 to 2024) RWE Clean Energy (2025 to 2025) |
Map of Iron Horse Battery Storage Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Iron Horse Battery Storage Hybrid.
Monthly Net Generation for Iron Horse Battery Storage Hybrid
Monthly Plant Fuel Consumption for Iron Horse Battery Storage Hybrid
Iron Horse Battery Storage Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Iron Horse Battery Storage Hybrid (60996) |
| Plant Address | 8410 H East Rita Road, Tucson, AZ 85747 |
| Utility | RWE Clean Energy (67192) |
| Latitude, Longitude | 32.09849, -110.81912 |
| Generation Dates on File | Apr 2017 to Dec 2025 |
| Initial Operation Date | April 2017 |
| Annual Generation | 4.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Tucson Electric Power Company (TEPC) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Tucson Electric Power Co (24211) AZ |
| Grid Voltage | 13.80 kV |
| Energy Storage | Yes |
Generator BA1 Details Operating April 2017
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 10 MW |
| Summer Capacity | 10 MW |
| Winter Capacity | 10 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2017 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 2.5 |
|---|---|
| Maximum Charge Rate | 10 MW |
| Maximum Discharge Rate | 10 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 10 |
| Storage Enclosure Type | CS |
| Frequency Regulation | P |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 60996 |
| Direct Support Gen Id | PV1 |
| Support T D Asset | Yes |
Generator PV1 Details Operating April 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2 MW |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2017 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 25 |
| DC Net Capacity | 2.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Iron Horse Battery Storage Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3523 | Milo Solar | Burlington, NC | 4.9 GWh |
| #3524 | Carver Gladden CSG | Norwood Young America, MN | 4.9 GWh |
| #3525 | Niagara Solar Project | Randomville, NY | 4.9 GWh |
| #3526 | East Orange Solar | Millburn Township, NJ | 4.9 GWh |
| #3527 | Soul City Solar | Norlina, NC | 4.9 GWh |
| #3528 | IPC 25 Solar | Tracy, CA | 4.9 GWh |
| #3529 | Ryans Ranch | Paris, ME | 4.9 GWh |
| #3530 | IGS SBD2 | San Bernardino, CA | 4.9 GWh |
| #3531 | Lenape II | Indianapolis, IN | 4.9 GWh |
| #3532 | Battleground | Kings Mountain, NC | 4.9 GWh |
| #3534 | Marmas Solar CSG | St. Cloud, MN | 4.9 GWh |
| #3535 | Vermillion River_MN_GRE DEA-GM | Farmington, MN | 4.9 GWh |
| #3536 | Hinton | Hinton, OK | 4.9 GWh |
| #3537 | IGS SBD1 | Bloomington, CA | 4.9 GWh |
| #3538 | Mill Creek Solar | Burlington, NJ | 4.9 GWh |
| #3539 | Berkley East Solar LLC | Berkley, MA | 4.9 GWh |
| #3540 | Barnstable Landfill | Marstons Mills, MA | 4.9 GWh |
| #3541 | Horn Rapids Solar, Storage and Training | Richland, WA | 4.6 GWh |
| #3542 | Bristol Solar One, LLC | Bristol, CT | 4.9 GWh |
| #3543 | Marble Solar LLC (CSG) | Albany, OR | 4.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Iron Horse Battery Storage Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Actus Lend Lease DMAFB | Tucson, AZ | 2.5 GWh | 6.4 mi |
| Amazon TUS2 | Tucson, AZ | 5.5 GWh | 2.4 mi |
| Avalon Solar | Pima, AZ | 64.2 GWh | 10.7 mi |
| Avalon Solar II | Sahuarita, AZ | 42.9 GWh | 10.6 mi |
| Cogeneration 1 | Tucson, AZ | 54.1 GWh | 12 mi |
| Cogeneration 2 | Tucson, AZ | 39.2 GWh | 12.4 mi |
| Cogenra - TEP | Tucson, AZ | 1.9 GWh | 0.4 mi |
| Davis Monthan AFB (AZ) West Airfield | Tucson, AZ | 29.5 GWh | 7 mi |
| Demoss Petrie | Tucson, AZ | 2.1 GWh | 14.7 mi |
| Gato Montes Solar, LLC | Tucson, AZ | 7.4 GWh | 0.3 mi |
| H Wilson Sundt Generating Station | Tucson, AZ | 1.9 TWh | 6.6 mi |
| Pima Community College | Tucson, AZ | 1.3 GWh | 4.7 mi |
| Pima Community College - East Campus | Tucson, AZ | 2.8 GWh | 10.6 mi |
| Prairie Fire | Tucson, AZ | 7.7 GWh | 1.2 mi |
| Raptor Ridge | Tucson, AZ | 35.5 GWh | 4.8 mi |
| Tech Park Solar | Tucson, AZ | 12.4 GWh | 0.2 mi |
| TJX Tucson | Tucson, AZ | 2.1 GWh | 5.8 mi |
| UASTP I | Tucson, AZ | 2.1 GWh | 0.5 mi |
| Valencia Solar | Tucson, AZ | 26.6 GWh | 4.3 mi |
| Wilmot Energy Center LLC | Tucson, AZ | 270.0 GWh | 5.7 mi |