CM10
751 El Dorado Valley Dr., Boulder City, NV 89005Plant Summary Information
CM10 is ranked #48 out of 60 solar farms in Nevada in terms of total annual net electricity generation.
CM10 generated 4.1 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | CM10 |
---|---|
Utility Name | Consolidated Edison Development Inc. |
Location | Clark County, NV |
Initial Operation Date | December 2008 |
Last Update | Dec 2024 |
Annual Generation | 18.0 GWh |
Annual Consumption | 65.4 k MMBtu |
Ranked #5,308 out of 12,288 Power Plants Nationwide | |
Ranked #1,398 out of 6,174 Solar Power Plants Nationwide | |
Ranked #93 out of 107 Nevada Power Plants | |
Ranked #48 out of 60 Nevada Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Copper Mountain 1 LLC (2013 to 2017) Consolidated Edison Development Inc. (2018 to 2024) |
Map of CM10
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CM10.
Monthly Net Generation for CM10
CM10 Details
Summary Information | |
---|---|
Plant Name | CM10 (56944) |
Plant Address | 751 El Dorado Valley Dr., Boulder City, NV 89005 |
Utility | Consolidated Edison Development Inc. (56769) |
Latitude, Longitude | 35.7881, -114.9933 |
Generation Dates on File | Dec 2008 to Dec 2024 |
Initial Operation Date | December 2008 |
Annual Generation | 18.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 11-115 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator PV01 Details Operating December 2008
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2008 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 12.4 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
CM10 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1388 | OR Solar 5, LLC | Merrill, OR | 18.3 GWh |
#1389 | Manzano Solar | Los Lunas, NM | 18.3 GWh |
#1390 | South 49th 013445 SCS Norfolk, LLC | Norfolk, NE | 18.2 GWh |
#1391 | Bly Solar Center | Bly, OR | 18.2 GWh |
#1392 | Ridgeland Solar Project | Ridgeland, SC | 18.2 GWh |
#1393 | Fountain Creek Solar | Skippers, VA | 18.2 GWh |
#1394 | Peru 2 | Peru, IN | 18.1 GWh |
#1395 | TPE King Solar Holdings1, LLC (CSG) | North Smithfield, RI | 18.1 GWh |
#1396 | Chiloquin Solar, LLC | Chiloquin, OR | 18.1 GWh |
#1397 | Eagle Point Solar | Central Point, OR | 18.0 GWh |
#1399 | Lakehurst Solar | Lakehurst, NJ | 17.8 GWh |
#1400 | Dane County Airport Solar | Madison, WI | 17.7 GWh |
#1401 | Firwood Solar, LLC | Sandy, OR | 17.7 GWh |
#1402 | Crawfordsville 5 Solar Park | Crawfordsville, IN | 17.7 GWh |
#1403 | Mount Saint Mary's | Emmitsburg, MD | 17.7 GWh |
#1404 | Solar Star California, XLIV, LLC | Pearblossom, CA | 17.7 GWh |
#1405 | Hyline Solar Center, LLC | Ontario, OR | 17.6 GWh |
#1406 | Turkey Creek PV1 | Kirby, NC | 17.6 GWh |
#1407 | Waipio Peninsula | Waipio, HI | 17.5 GWh |
#1408 | Williamston Speight Solar, LLC | Williamston, NC | 17.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CM10.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boulder Solar II, LLC | Boulder City, NV | 119.7 GWh | 5.1 mi |
Clark (NVE) | Las Vegas, NV | 1.0 TWh | 20.9 mi |
CM48 | Boulder City, NV | 94.3 GWh | 0.5 mi |
Copper Mountain Solar 2 | Boulder City, NV | 356.1 GWh | 1.7 mi |
Copper Mountain Solar 3 | Boulder City, NV | 621.3 GWh | 7.3 mi |
Copper Mountain Solar 4, LLC | Boulder City, NV | 211.3 GWh | 1.1 mi |
Copper Mountain Solar 5, LLC | Boulder City, NV | 695.7 GWh | 1.4 mi |
Desert Star Energy Center | Boulder City, NV | 783.9 GWh | 0.1 mi |
Dignity - Siena Campus | Henderson, NV | 2.7 GWh | 16.4 mi |
IGS LAS1 | Henderson, NV | 1.1 GWh | 15.1 mi |
Nevada Solar One | Boulder City, NV | 94.5 GWh | 1 mi |
River Mountains Solar | Henderson, NV | 33.6 GWh | 17.2 mi |
Saguaro Power | Henderson, NV | 213.3 GWh | 17.6 mi |
Silver State Solar Power North | Primm, NV | 115.2 GWh | 20 mi |
Techren Solar I LLC | Boulder, NV | 204.4 GWh | 4.5 mi |
Techren Solar II LLC | Boulder, NV | 494.4 GWh | 5.8 mi |
Techren Solar III LLC | Boulder, NV | 60.9 GWh | 4.1 mi |
Techren Solar IV LLC | Boulder, NV | 58.1 GWh | 7.9 mi |
Techren Solar V | Boulder, NV | 118.7 GWh | 8.6 mi |
Townsite Solar Project Hybrid | Boulder City, NV | 461.9 GWh | 12 mi |