Timberland Solar
1300 Goose Pond Road, Carlton, GA 30627Plant Summary Information
Timberland Solar is ranked #20 out of 151 solar farms in Georgia in terms of total annual net electricity generation.
Timberland Solar generated 101.2 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Timberland Solar |
|---|---|
| Utility Name | RWE Clean Energy |
| Location | Oglethorpe County, GA |
| Initial Operation Date | August 2025 |
| Last Update | Jun 2026 |
| Annual Generation | 210.2 GWh |
| Annual Consumption | 717.0 k MMBtu |
| Ranked #2,486 out of 13,094 Power Plants Nationwide | |
| Ranked #463 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #53 out of 246 Georgia Power Plants | |
| Ranked #20 out of 151 Georgia Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Consolidated Edison Development Inc. (2021 to 2024) RWE Clean Energy (2025 to 2025) |
Map of Timberland Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Timberland Solar.
Monthly Net Generation for Timberland Solar
Monthly Plant Fuel Consumption for Timberland Solar
Timberland Solar Details
| Summary Information | |
|---|---|
| Plant Name | Timberland Solar (65892) |
| Plant Address | 1300 Goose Pond Road, Carlton, GA 30627 |
| Utility | RWE Clean Energy (67192) |
| Latitude, Longitude | 33.96432, -82.81584 |
| Generation Dates on File | Aug 2025 to Jun 2026 |
| Initial Operation Date | August 2025 |
| Annual Generation | 210.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 23-16 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Southeastern Power Administration (SEPA) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Georgia Power Co (7140) GA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator TSPV Details Operating August 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 140 MW |
| Summer Capacity | 140 MW |
| Winter Capacity | 140 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 195 MW |
| Crystalline Silicon | Yes |
Timberland Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #453 | Happy Solar 1 | Searcy, AR | 212.6 GWh |
| #454 | Badger Hollow II | Cobb, WI | 212.3 GWh |
| #455 | BPL Crown Solar LLC | Chilton, TX | 212.0 GWh |
| #456 | Black Bear Solar 1 | Montgomery, AL | 211.8 GWh |
| #457 | Norton Solar Farm | Bronte, TX | 211.6 GWh |
| #458 | Sigurd Solar LLC | Sigurd, UT | 211.6 GWh |
| #459 | Bayou Galion Solar Project | Mer Rouge, LA | 211.4 GWh |
| #460 | Chicot Solar | Lake Village, AR | 211.2 GWh |
| #461 | Rocket Solar, LLC | Corinne, UT | 211.0 GWh |
| #462 | RATTS 1 | Petersburg, IN | 210.2 GWh |
| #464 | Yuma Solar + Storage | Fortuna Foothills, AZ | 200.6 GWh |
| #465 | San Pablo Raceway | Lancaster, CA | 208.6 GWh |
| #466 | Utah Red Hills Renewable Energy Park | Parowan, UT | 207.9 GWh |
| #467 | BPL Sol Solar LLC | Chilton, TX | 207.7 GWh |
| #468 | Alamo 6 | Fort Stockton, TX | 206.9 GWh |
| #469 | Springfield Solar (WI) | Lomira, WI | 206.9 GWh |
| #470 | Amite Solar, LLC | Roseland, LA | 206.7 GWh |
| #471 | Holliday Creek Solar | Fort Dodge, IA | 206.4 GWh |
| #472 | Coniglio Solar | Wolfe City, TX | 205.8 GWh |
| #473 | Wheatsborough Solar | Bellevue, OH | 205.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Timberland Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Anderson (SC) | Anderson, SC | 4.2 GWh | 37.4 mi |
| Augusta Solar | Greenwood, SC | 4.0 GWh | 40.8 mi |
| CII Methane Management III LFG Plant | Winterville, GA | 3.4 GWh | 25.8 mi |
| Columbia Substation | Appling, GA | 4.0 GWh | 40.4 mi |
| Comer Solar | Comer, GA | 3.5 GWh | 20.8 mi |
| Dahlberg | Nicholson, GA | 229.4 GWh | 33.8 mi |
| Franklin Milliken | Lavonia, GA | 6.4 GWh | 36.8 mi |
| Gold Mine | Bradley, SC | 2.9 GWh | 34.6 mi |
| Greene Durham | Union Point, GA | 6.7 GWh | 28 mi |
| GRP Franklin Renewable Energy Facility | Carnesville, GA | 410.5 GWh | 40.9 mi |
| GRP Madison Renewable Energy Facility | Colbert, GA | 409.8 GWh | 22.2 mi |
| Hartwell Energy Facility | Hartwell, GA | 96.7 GWh | 25.9 mi |
| Hartwell Lake | Hartwell, GA | 344.3 GWh | 27.1 mi |
| J Strom Thurmond | Clarks Hill, SC | 566.0 GWh | 41.3 mi |
| John S Rainey | Starr, SC | 5.1 TWh | 26.6 mi |
| Richard B Russell | Elberton, GA | 160.1 GWh | 13.3 mi |
| Rocky River (SC) | Iva, SC | 2.4 GWh | 23.4 mi |
| Sonny Solar LLC | Elberton, GA | 72.2 GWh | 8.1 mi |
| Tallassee Hydro Project | Clarke, GA | 2.3 GWh | 39.1 mi |
| Wolfskin Solar | Arnoldsville, GA | 83.0 GWh | 25.4 mi |