Watlington Solar
1163 East Hyco Road, Halifax, VA 24592Plant Summary Information
Watlington Solar is ranked #47 out of 116 solar farms in Virginia in terms of total annual net electricity generation.
Watlington Solar generated 6.1 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Watlington Solar |
---|---|
Utility Name | Consolidated Edison Development Inc. |
Location | Halifax County, VA |
Initial Operation Date | March 2023 |
Last Update | Dec 2024 |
Annual Generation | 39.6 GWh |
Annual Consumption | 142.3 k MMBtu |
Ranked #4,265 out of 12,288 Power Plants Nationwide | |
Ranked #1,003 out of 6,174 Solar Power Plants Nationwide | |
Ranked #95 out of 227 Virginia Power Plants | |
Ranked #47 out of 116 Virginia Solar Power Plants | |
Fuel Types | Solar |
Map of Watlington Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Watlington Solar.
Monthly Net Generation for Watlington Solar
Watlington Solar Details
Summary Information | |
---|---|
Plant Name | Watlington Solar (65221) |
Plant Address | 1163 East Hyco Road, Halifax, VA 24592 |
Utility | Consolidated Edison Development Inc. (56769) |
Latitude, Longitude | 36.68155, -78.88596 |
Generation Dates on File | Mar 2023 to Dec 2024 |
Initial Operation Date | March 2023 |
Annual Generation | 39.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 23-4 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator WSPV Details Operating March 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 20 MW |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Bifacial | Yes |
---|---|
Other Solar Technology | Yes |
DC Net Capacity | 25.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Watlington Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#993 | Frontier Solar LLC | Newman, CA | 40.1 GWh |
#994 | Murphy Flat Solar | Murphy, ID | 40.1 GWh |
#995 | Fort Huachuca Solar PV Project | Sierra Vista, AZ | 40.1 GWh |
#996 | Green Pasture | TBD, FL | 40.1 GWh |
#997 | Fusion Solar Center LLC | Baltic, CT | 40.0 GWh |
#998 | Temperance Solar, LLC | Erie, MI | 40.0 GWh |
#999 | Redwood 4 Solar Farm | Edison, CA | 39.9 GWh |
#1000 | Vandenberg Solar Project | Vandenberg Airforce B, CA | 39.7 GWh |
#1001 | AP North Lake I, LP | Hemet, CA | 39.6 GWh |
#1002 | Adobe Solar | Arvin, CA | 39.6 GWh |
#1004 | Energix Nokesville, LLC | Nokesville, VA | 39.6 GWh |
#1005 | Sierra Solar Greenworks | Lancaster, CA | 39.5 GWh |
#1006 | Redlands | TBD, FL | 39.5 GWh |
#1007 | Cotton Center Solar Hybrid | Gila Bend, AZ | 36.5 GWh |
#1008 | Nicolis Solar PV Plant | Delano, CA | 39.4 GWh |
#1009 | RE Adams East, LLC | Fresno, CA | 39.3 GWh |
#1010 | Almond | Lemoore, CA | 39.2 GWh |
#1011 | Kelford | Lewiston Woodville, NC | 39.1 GWh |
#1012 | CED Ducor 3 | Ducor, CA | 39.1 GWh |
#1013 | Foxglove Solar | Middletown, VA | 39.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Watlington Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alton Post Office Solar | Alton, VA | 28.4 GWh | 11.3 mi |
Clover | Clover, VA | 1.0 TWh | 16.4 mi |
Crystal Hill Solar | Crystal Hill, VA | 130.6 GWh | 11.3 mi |
Danville | Danville, VA | 12.5 GWh | 22.9 mi |
Danville Kentuck Road Plant | Ringgold, VA | 64.7 MWh | 22.9 mi |
ESA Boston Solar, LLC | Roxboro, NC | 9.5 GWh | 13.7 mi |
Foxhound | Clover, VA | 148.6 GWh | 15.6 mi |
Halifax | Halifax, VA | 1.4 GWh | 7.2 mi |
Halifax County Biomass | South Boston, VA | 351.6 GWh | 1.5 mi |
Halifax CSG LLC | South Boston, VA | 3.0 GWh | 3 mi |
Mayo | Roxboro, NC | 1.0 TWh | 10.6 mi |
Otter Creek Solar | Chase City, VA | 95.4 GWh | 22.6 mi |
Perkins Solar, LLC | Roxboro, NC | 3.8 GWh | 17.5 mi |
Piney Creek Solar | Clover, VA | 92.8 GWh | 11.4 mi |
Powells Creek Solar - Hybrid | Alton, VA | 154.5 GWh | 11.8 mi |
Roxboro | Semora, NC | 7.1 TWh | 17.2 mi |
Roxboro Farm | Roxboro, NC | 8.7 GWh | 14.1 mi |
Sunnybrook Solar Project - Hybrid | Scottsburg, VA | 87.8 GWh | 8.5 mi |
Wagstaff Farm 1 | Roxboro, NC | 8.5 GWh | 15.9 mi |
Woodsdale Farm, LLC | Roxboro, NC | 3.4 GWh | 15.4 mi |