Peyton Creek Wind Farm LLC
4120 CR 222, Bay City, TX 77414Plant Summary Information
Peyton Creek Wind Farm LLC is ranked #169 out of 227 wind farms in Texas in terms of total annual net electricity generation.
Peyton Creek Wind Farm LLC generated 101.9 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Peyton Creek Wind Farm LLC |
|---|---|
| Utility Name | Big Sky Wind, LLC |
| Location | Matagorda County, TX |
| Initial Operation Date | June 2020 |
| Last Update | Feb 2026 |
| Annual Generation | 309.9 GWh |
| Annual Consumption | 1.2 M MMBtu |
| Ranked #1,956 out of 12,637 Power Plants Nationwide | |
| Ranked #585 out of 1,376 Wind Power Plants Nationwide | |
| Ranked #380 out of 820 Texas Power Plants | |
| Ranked #169 out of 227 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
E ON Climate Renewables N America LLC (2018 to 2018) RWE Renewables Americas LLC (2019 to 2021) RWE Renewables Americas, LLC (2022 to 2023) Big Sky Wind, LLC (2024 to 2024) |
Map of Peyton Creek Wind Farm LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Peyton Creek Wind Farm LLC.
Monthly Net Generation for Peyton Creek Wind Farm LLC
Monthly Plant Fuel Consumption for Peyton Creek Wind Farm LLC
Peyton Creek Wind Farm LLC Details
| Summary Information | |
|---|---|
| Plant Name | Peyton Creek Wind Farm LLC (62417) |
| Plant Address | 4120 CR 222, Bay City, TX 77414 |
| Utility | Big Sky Wind, LLC (56215) |
| Latitude, Longitude | 28.8433, -95.8631 |
| Generation Dates on File | Jun 2020 to Feb 2026 |
| Initial Operation Date | June 2020 |
| Annual Generation | 309.9 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 19-180 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator WT1 Details Operating June 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 151.2 MW |
| Summer Capacity | 151.2 MW |
| Winter Capacity | 151.2 MW |
| Minimum Load | 25 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 48 |
| Turbine Details | |
| Number Of Turbines | 48 |
|---|---|
| Predominant Turbine Manufacturer | Acciona |
| Predominant Turbine Model Number | AW125/3000 |
| Design Wind Speed | 15 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 287 |
Peyton Creek Wind Farm LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #575 | Paulding Wind Farm III | Payne, OH | 318.0 GWh |
| #576 | Cloud County Wind Farm | Concordia, KS | 317.2 GWh |
| #577 | Shady Oaks Wind 2 | Compton, IL | 316.8 GWh |
| #578 | Anacacho Wind Farm, LLC | Brackettville, TX | 316.0 GWh |
| #579 | Post Wind Farm LP | Fluvanna, TX | 314.8 GWh |
| #580 | Monte Cristo 1 | Monte Alto, TX | 314.6 GWh |
| #581 | Sac County Wind, LLC | Sac City, IA | 312.4 GWh |
| #582 | Paulding Wind Farm II | Payne, OH | 311.7 GWh |
| #583 | Pacific Wind LLC | Rosamond, CA | 311.2 GWh |
| #584 | Prairie Winds ND1 | Minot, ND | 310.6 GWh |
| #586 | Loraine Windpark Project LLC | Loraine, TX | 307.8 GWh |
| #587 | Rosewater Wind Farm | Chalmers, IN | 307.4 GWh |
| #588 | Pinyon Pine I | Mojave, CA | 306.6 GWh |
| #589 | Minco Wind I, LLC | Minco, OK | 304.9 GWh |
| #590 | Marshall Wind Farm | Frankfort, KS | 304.8 GWh |
| #591 | Beethoven Wind | Tripp, SD | 302.6 GWh |
| #592 | Buffalo Gap 3 Wind Farm | Nolan, TX | 302.2 GWh |
| #593 | Crane Creek Wind Energy Center | Riceville, IA | 302.0 GWh |
| #594 | Twin Buttes II Wind | Lamar, CO | 301.7 GWh |
| #595 | Mustang Hills LLC | Mojave, CA | 301.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Peyton Creek Wind Farm LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Aktina Solar | El Campo, TX | 1.0 TWh | 31.5 mi |
| BASF Freeport Works | Feeeport, TX | 532.7 GWh | 30.4 mi |
| Brazoria County Solar Project (Danciger) | Damon, TX | 435.0 GWh | 23.9 mi |
| Brazoria West | Damon, TX | 429.4 GWh | 26.9 mi |
| Cascade Solar (TX) | Wharton, TX | 17.3 GWh | 26.8 mi |
| Freeport Energy | Freeport, TX | 1.7 TWh | 29.4 mi |
| Freeport Energy Center | Freeport, TX | 833.0 GWh | 30 mi |
| HEB00292 | Bay City, TX | 246.0 MWh | 11.2 mi |
| Lane City Wind | Lane City, TX | 227.1 GWh | 27.2 mi |
| Long Point Solar | Damon, TX | 29.0 GWh | 29.9 mi |
| Newgulf Cogen | NewGulf, TX | 12.7 GWh | 29.1 mi |
| Oyster Creek Unit VIII | Freeport, TX | 2.6 TWh | 32.9 mi |
| Peyton Creek Wind Farm II | Bay City, TX | 449.8 GWh | 3.7 mi |
| Prairie Switch Wind LLC | El Campo, TX | 402.0 GWh | 22 mi |
| Praxair | Clute, TX | 14.0 MWh | 30.8 mi |
| Red Tailed Hawk Solar LLC | Pierce, TX | 798.8 GWh | 27.6 mi |
| Second Division Solar | West Columbia, TX | 194.8 GWh | 23.8 mi |
| South Texas Project | Wadsworth, TX | 21.8 TWh | 11.7 mi |
| Sweeny Cogen Facility | Old Ocean, TX | 3.3 TWh | 17.4 mi |
| Wagyu | Damon, TX | 241.4 GWh | 30.2 mi |