West Raymond Wind Farm LLC
TBA, Lyford, TX 78569Plant Summary Information
West Raymond Wind Farm LLC is ranked #64 out of 231 wind farms in Texas in terms of total annual net electricity generation.
West Raymond Wind Farm LLC generated 199.3 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | West Raymond Wind Farm LLC |
|---|---|
| Utility Name | RWE Clean Energy |
| Location | Willacy County, TX |
| Initial Operation Date | October 2021 |
| Last Update | Aug 2026 |
| Annual Generation | 735.1 GWh |
| Annual Consumption | 2.7 M MMBtu |
| Ranked #985 out of 13,301 Power Plants Nationwide | |
| Ranked #197 out of 1,377 Wind Power Plants Nationwide | |
| Ranked #186 out of 861 Texas Power Plants | |
| Ranked #64 out of 231 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
E ON Climate Renewables N America LLC (2018 to 2018) RWE Renewables Americas LLC (2019 to 2021) RWE Renewables Americas, LLC (2022 to 2023) Big Sky Wind, LLC (2024 to 2024) RWE Clean Energy (2025 to 2025) |
Map of West Raymond Wind Farm LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for West Raymond Wind Farm LLC.
Monthly Net Generation for West Raymond Wind Farm LLC
Monthly Plant Fuel Consumption for West Raymond Wind Farm LLC
West Raymond Wind Farm LLC Details
| Summary Information | |
|---|---|
| Plant Name | West Raymond Wind Farm LLC (62855) |
| Plant Address | TBA, Lyford, TX 78569 |
| Utility | RWE Clean Energy (67192) |
| Latitude, Longitude | 26.37665, -97.99305 |
| Generation Dates on File | Oct 2021 to Aug 2026 |
| Initial Operation Date | October 2021 |
| Annual Generation | 735.1 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 23-768-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator WRAYM Details Operating October 2021
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 239.8 MW |
| Summer Capacity | 239.8 MW |
| Winter Capacity | 239.8 MW |
| Minimum Load | 22 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 109 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 109 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V120-2.2 |
| Design Wind Speed | 16.6 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 302 |
West Raymond Wind Farm LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #187 | Cimarron Bend Wind Project I, LLC | Minneola, KS | 759.8 GWh |
| #188 | Plymouth Wind | Remsen, IA | 759.2 GWh |
| #189 | Roosevelt County | Portales, NM | 750.8 GWh |
| #190 | North Bend Wind Project, LLC | Highmore, SD | 750.4 GWh |
| #191 | Cedar Springs I | Douglas, WY | 744.2 GWh |
| #192 | Cedar Springs II | Douglas, WY | 744.2 GWh |
| #193 | Whispering Willow North | Latimer, IA | 739.1 GWh |
| #194 | Diversion Wind Energy LLC | Seymour, TX | 738.1 GWh |
| #195 | South Plains Wind Phase I | Floydada, TX | 737.3 GWh |
| #196 | Tucannon River Wind Farm | Dayton, WA | 736.8 GWh |
| #198 | Klondike Windpower III | Wasco, OR | 733.2 GWh |
| #199 | White Rock East Wind Project | Anadarko, OK | 730.2 GWh |
| #200 | Cross Winds Energy Park | Unionville, MI | 728.2 GWh |
| #201 | Rattlesnake Den | Garden City, TX | 726.4 GWh |
| #202 | Harvest Ridge Wind Farm | Newman, IL | 725.7 GWh |
| #203 | Cimarron Bend III | Minneola, KS | 725.4 GWh |
| #204 | Great Pathfinder Wind | Stratford, IA | 724.2 GWh |
| #205 | Jayhawk Wind Energy Center | Hepler, KS | 720.4 GWh |
| #206 | Broadview Energy JN, LLC | Texico, NM | 719.3 GWh |
| #207 | Spinning Spur Wind III | Adrian, TX | 718.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding West Raymond Wind Farm LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bruennings Breeze Wind Farm | Raymondville, TX | 511.0 GWh | 21.2 mi |
| Citrus City | Mission, TX | 99.0 MWh | 22.5 mi |
| E. Porte Ct. | Harlingen, TX | 96.0 MWh | 24 mi |
| HEB00038 | San Juan, TX | 194.0 MWh | 16 mi |
| Hidalgo Energy Center | Edinburg, TX | 2.8 TWh | 11.6 mi |
| Los Vientos Wind 1A | Sebastian, TX | 341.3 GWh | 25.4 mi |
| Los Vientos Wind 1B | Sebastian, TX | 394.7 GWh | 20.3 mi |
| Magic Valley Generating Station | Edinburg, TX | 1.4 TWh | 12.4 mi |
| Magic Valley Wind Farm I LLC | San Perlita, TX | 505.8 GWh | 19.9 mi |
| Monte Cristo 1 | Monte Alto, TX | 821.5 GWh | 19 mi |
| Nebula Solar | La Feria, TX | 304.0 GWh | 23.2 mi |
| Raymond Wind Farm, LLC | Lyford, TX | 592.0 GWh | 13.2 mi |
| Red Gate Power Plant | Edinburg, TX | 399.1 GWh | 12.5 mi |
| Ridge Rd | Alamo, TX | 122.0 MWh | 15.8 mi |
| Santa Rosa | Santa Rosa, TX | 112.0 MWh | 14.6 mi |
| Vancourt Solar Interconnections | La Feria, TX | 107.9 GWh | 23.2 mi |
| WAL3320 | Palmhurst, TX | 355.0 MWh | 21.5 mi |
| WAL3886 | Edinburg, TX | 339.0 MWh | 15.1 mi |
| WAL452 | Mcallen, TX | 350.0 MWh | 18.1 mi |
| WAL5165 | Alamo, TX | 320.0 MWh | 15.3 mi |